Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no ...Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no condition indicators designed for determining adequate timing for applying preventive maintenance and little literature relating to the development of pavement performance. This work presented the indicators, including crack ratio (Rc), rutting depth (DR), international roughness index (IIR) and sideway force coefficient (CsF) to determine the adequate timing for preventive maintenance in China. The proper ranges of each indicator to apply to preventive maintenance were then recommended. They are 0.28%-1.4% for Rc, 10-15 mm for DR, 1.97-3.5 for lrR, 40--50 for CSF. Based on pavement condition survey data collected on the test roads in Hebei Province, China, on the application of slurry seal at different timings, the pavement performance was established and the adequate timings for applying slurry seal was studied. Based on benefit-cost analysis, it is suggested that the fourth year is the optimal timing for applying slurry seal based on the condition in China. A framework is established to determine the adequate timings of applying other preventive maintenance methods.展开更多
The aim of this paper is to present the urban history of Juiz de Fora, a city with some 500,000 inhabitants in southeastern Brazil, and discuss how strategic decisions about the planning and construction of roads and ...The aim of this paper is to present the urban history of Juiz de Fora, a city with some 500,000 inhabitants in southeastern Brazil, and discuss how strategic decisions about the planning and construction of roads and highways can determine ways of life in a city. While paths may integrate landholdings and territories, they may also segregate communities and environments, causing deep rifts in the fabric of urban and land areas. The growth of Juiz de Fora is particularly marked by the construction of paths. This article reviews the local urban history from the establishment of paths in the city, to an analysis of the major impact and benefits they have had, notably on the local economy and demographics, as well as on the conservation of the local environment: Issues that are frequently relegated to a secondary role in the cost-benefit analysis of the city's planning decisions. After analysis of the case study, the authors concluded that citizens should be included on the agenda of the city, from spectators to actors of daily urban life.展开更多
基金Project(IRT1050) supported by Program for Changjiang Scholars and Innovative Research Team in University, ChinaProject (2009318000027) supported by Ministry of Transport of ChinaProject(CHD2011TD002) supported by the Special Fund for Basic Scientific Research of Central Colleges, Chang’an University, China
文摘Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no condition indicators designed for determining adequate timing for applying preventive maintenance and little literature relating to the development of pavement performance. This work presented the indicators, including crack ratio (Rc), rutting depth (DR), international roughness index (IIR) and sideway force coefficient (CsF) to determine the adequate timing for preventive maintenance in China. The proper ranges of each indicator to apply to preventive maintenance were then recommended. They are 0.28%-1.4% for Rc, 10-15 mm for DR, 1.97-3.5 for lrR, 40--50 for CSF. Based on pavement condition survey data collected on the test roads in Hebei Province, China, on the application of slurry seal at different timings, the pavement performance was established and the adequate timings for applying slurry seal was studied. Based on benefit-cost analysis, it is suggested that the fourth year is the optimal timing for applying slurry seal based on the condition in China. A framework is established to determine the adequate timings of applying other preventive maintenance methods.
文摘The aim of this paper is to present the urban history of Juiz de Fora, a city with some 500,000 inhabitants in southeastern Brazil, and discuss how strategic decisions about the planning and construction of roads and highways can determine ways of life in a city. While paths may integrate landholdings and territories, they may also segregate communities and environments, causing deep rifts in the fabric of urban and land areas. The growth of Juiz de Fora is particularly marked by the construction of paths. This article reviews the local urban history from the establishment of paths in the city, to an analysis of the major impact and benefits they have had, notably on the local economy and demographics, as well as on the conservation of the local environment: Issues that are frequently relegated to a secondary role in the cost-benefit analysis of the city's planning decisions. After analysis of the case study, the authors concluded that citizens should be included on the agenda of the city, from spectators to actors of daily urban life.