Worldwide the introduction of dispersed generators (DG) in the distribution network is assuming a significant importance. There is an increasing relevance of the energy process efficiency improvement; as for electri...Worldwide the introduction of dispersed generators (DG) in the distribution network is assuming a significant importance. There is an increasing relevance of the energy process efficiency improvement; as for electric power systems, the most interesting perspective concerns the capability of the system to increase the exploitation of the renewable resources. The integration of DGs in the electric distribution network requires a revision of this infrastructure, so far designed and developed assuming that power flows in one direction: from the high voltage transmission network to the medium voltage distribution, to reach final customers on the low voltage network. The attention to an efficient operation of distribution networks is increasing all over the world; this interest is becoming higher and higher also in Italy, where the high energy prices push in the direction of fostering efficiency as much as possible. This work describes a study developed in the AlpEnergy project framework: an International Cooperation Program aimed at introducing an efficient operational model for the distributed production and consumption. In particular it is proposed a new model for the integration and the management of the DG in the distribution network. The new model (defined VPS: Virtual Power System) is based on a communication channel between the active users (generators), the loads and, eventually, the Distribution System Operators (DSOs).展开更多
The electric power system is an ageing infrastructure and the need for making reinvestments is increasing. Strict economic regulation of the DSOs (distribution system operators), forces them to search for more effic...The electric power system is an ageing infrastructure and the need for making reinvestments is increasing. Strict economic regulation of the DSOs (distribution system operators), forces them to search for more efficient work processes and improved technical solutions. The main challenges for network companies today are implementing new technologies and become more efficient in every part of the asset management. The work processes must be optimized and the right projects must be prioritized for reinvestment. The purpose of this paper is to give insight into some of the challenges electric distribution companies are facing today. This paper is based on experiences from NTE Nett AS--an electric distribution company in the middle of Norway. The paper also describes some of the measures that have been done in NTE Nett and what people believe will be the situation in the future.展开更多
文摘Worldwide the introduction of dispersed generators (DG) in the distribution network is assuming a significant importance. There is an increasing relevance of the energy process efficiency improvement; as for electric power systems, the most interesting perspective concerns the capability of the system to increase the exploitation of the renewable resources. The integration of DGs in the electric distribution network requires a revision of this infrastructure, so far designed and developed assuming that power flows in one direction: from the high voltage transmission network to the medium voltage distribution, to reach final customers on the low voltage network. The attention to an efficient operation of distribution networks is increasing all over the world; this interest is becoming higher and higher also in Italy, where the high energy prices push in the direction of fostering efficiency as much as possible. This work describes a study developed in the AlpEnergy project framework: an International Cooperation Program aimed at introducing an efficient operational model for the distributed production and consumption. In particular it is proposed a new model for the integration and the management of the DG in the distribution network. The new model (defined VPS: Virtual Power System) is based on a communication channel between the active users (generators), the loads and, eventually, the Distribution System Operators (DSOs).
文摘The electric power system is an ageing infrastructure and the need for making reinvestments is increasing. Strict economic regulation of the DSOs (distribution system operators), forces them to search for more efficient work processes and improved technical solutions. The main challenges for network companies today are implementing new technologies and become more efficient in every part of the asset management. The work processes must be optimized and the right projects must be prioritized for reinvestment. The purpose of this paper is to give insight into some of the challenges electric distribution companies are facing today. This paper is based on experiences from NTE Nett AS--an electric distribution company in the middle of Norway. The paper also describes some of the measures that have been done in NTE Nett and what people believe will be the situation in the future.