To solve the inaccuracy problem caused by the two existing methods (averageend-area method and prismoidal method) used for the calculation of roadway earthwork volume, thispaper puts forward a new concept of the 3-dim...To solve the inaccuracy problem caused by the two existing methods (averageend-area method and prismoidal method) used for the calculation of roadway earthwork volume, thispaper puts forward a new concept of the 3-dimensional algorithm that takes all the roadway geometricdesign procedures as a kind of geometrical operation between the ground model (original terrainmodel) and the roadway model (designed model) under certain constraints, and then presents acomplete 3-dimensional algorithm of roadway earthwork volume as well as its executable computerprogram. The algorithm benefits from the re-triangulation technique of constrained delaunaytriangulation (CDT), which can yield a true volume value theoretically. Through a number ofpractical testscovering varied intervals between adjacent cross sections, it is proven to possess ahigher accuracy compared with that of traditional methods. All the work involved in this paperindicates that the 3-dimensional calculation of roadway earthwork volumeis feasible, more accurateand should have further application in practice.展开更多
文摘To solve the inaccuracy problem caused by the two existing methods (averageend-area method and prismoidal method) used for the calculation of roadway earthwork volume, thispaper puts forward a new concept of the 3-dimensional algorithm that takes all the roadway geometricdesign procedures as a kind of geometrical operation between the ground model (original terrainmodel) and the roadway model (designed model) under certain constraints, and then presents acomplete 3-dimensional algorithm of roadway earthwork volume as well as its executable computerprogram. The algorithm benefits from the re-triangulation technique of constrained delaunaytriangulation (CDT), which can yield a true volume value theoretically. Through a number ofpractical testscovering varied intervals between adjacent cross sections, it is proven to possess ahigher accuracy compared with that of traditional methods. All the work involved in this paperindicates that the 3-dimensional calculation of roadway earthwork volumeis feasible, more accurateand should have further application in practice.