期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
电气信息类新专业建设若干问题的思考 被引量:5
1
作者 蔡成林 田汉平 吴海燕 《湖南人文科技学院学报》 2005年第5期124-126,共3页
运用系统工程的理念,探讨了电气信息类新专业建设中需要解决的若干问题,并就专业规划、整合分流、师资科研团队等几个重要问题进行了思考,阐述了个人的一些观点。
关键词 新专业建设 专业规划 整合分流 科研团队
下载PDF
高职机械类教学模式改革的探讨 被引量:1
2
作者 张婷 《中国科教创新导刊》 2008年第25期178-178,共1页
高职机械专业教学要以提高人才培养质量为目的,建立"一个公共技术平台,多个专业方向"的新的人才培养教学模式。教学模式改革主要体现在:专业整合与分流,建立适应高职的实践教学体系,注重一体化教学和师资队伍的建设。
关键词 高职教育 专业整合分流 实践教学体系 一体化教学
下载PDF
Numerical Analysis of Emergency River Restoration Scheme for Qingping Mega Debris Flow 被引量:2
3
作者 CHEN Ri-dong LIU Xing-nian +1 位作者 HUANG Er GUO Zhi-xue 《Journal of Mountain Science》 SCIE CSCD 2013年第1期130-136,共7页
The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the qu... The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the '8.13' Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated '8.13' Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow. 展开更多
关键词 Flash flood Debris flow River restoration Numerical analysis Finite element method
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部