期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
工程胎胎面缠绕的高精度控制
1
作者 王俊 《橡塑技术与装备》 CAS 2023年第3期37-42,共6页
介绍了缠绕线的构成形式、工作原理,斜坡速度控制、宽度PID控制技术,最终产品的工艺参数与工艺标准的要求相比较,结果表明缠绕线的整体性能达到比较先进的水平。
关键词 斜坡速度 PID 工程胎 胎面缠绕
下载PDF
Analysis on Dam-Breaking Mode of Tangjiashan Barrier Dam in Beichuan County 被引量:7
2
作者 HU Xiewen LUO Gang +2 位作者 LV Xiaoping HUANG Runqiu SHI Yubin 《Journal of Mountain Science》 SCIE CSCD 2011年第2期354-362,共9页
Tangjiashan landslide is a typical high-speed consequent landslide of medium-steep dip angle. This landslide triggered by earthquake took place in about semi-minute. The relative sliding displacement is 900 meters, so... Tangjiashan landslide is a typical high-speed consequent landslide of medium-steep dip angle. This landslide triggered by earthquake took place in about semi-minute. The relative sliding displacement is 900 meters, so average sliding speed is about 30 meters per second. The longitudinal length of barrier dam which is formed by high-speed landslide along river is 803.4 meters; and maximum width crossing river is 611.8 meters. And its volume is estimated about 20.37 million steres. Through detailed geological investigation of the barrier dam, together with early geological information before earthquake, geological structures of the barrier dam and its stability of upstream and downstream slopes are studied when water level reaches different elevations in condition of continual after shocks with seismic intensity of 7 or 8 Richter scale. On this basis, dam-breaking mode of barrier dam is discussed deeply. Thereby, analytic results provide significant guidance and advices to front headquarters of Tangjiashan barrier dam, so that some proper engineering measures can be implemented and flood discharge can be carried out well. 展开更多
关键词 Tangjiashan Barrier Dam High-speed landslide Blocking river Dam-breaking
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部