期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Calculation model and mechanism analysis for rain-wind-induced vibration of stay cable 被引量:1
1
作者 谢桂华 刘荣桂 +1 位作者 蔡东升 陈蓓 《Journal of Central South University》 SCIE EI CAS 2014年第3期1107-1114,共8页
Rain-wind-induced vibration of cable was studied based on previous research achievements. According to the quasi-steady assumption, the governing equation of vertical motion of the cable was derived and the criterion ... Rain-wind-induced vibration of cable was studied based on previous research achievements. According to the quasi-steady assumption, the governing equation of vertical motion of the cable was derived and the criterion for unstable motion and occurrence mechanism was studied. A comparison was performed between the oscillation responses of the stay cable obtained from calculated model and previous results. The results indicate that the analysis model can reflect the main characteristics of wind-rain-induced vibrationt of the cable which is amplitude- and velocity-restricted, and it is probably related with the periodic vortex shedding of wake flow. It is essential for the occurrence of rain-wind-induced or wind-induced vibration of cable that the derivative of lift coefficient with respect to transient angle of attack is less than zero. When rain-wind-induced vibration occurs, the aerodynamic force has a dual function for the vibration, and the maximum amplitude of stayed-cable is determined by the relative value of aerodynamic exciting force and aerodynamic damping force. 展开更多
关键词 rain-wind-induced vibration stay cable governing equation STABILITY vortex shedding
下载PDF
主跨360m双边箱主梁斜拉桥结构分析
2
作者 高雅 刘超 《江苏交通科技》 2020年第1期23-26,共4页
贵州省剑河县南孟溪大桥是剑黎高速公路上的一座特大型桥梁。主桥采用(160+360+160=680)m双塔双索面预应力混凝土双边箱斜拉桥方案。针对该方案进行主梁刚度及强度分析、斜拉索的应力及应力幅分析及整桥的抗震分析,计算结果表明该方案... 贵州省剑河县南孟溪大桥是剑黎高速公路上的一座特大型桥梁。主桥采用(160+360+160=680)m双塔双索面预应力混凝土双边箱斜拉桥方案。针对该方案进行主梁刚度及强度分析、斜拉索的应力及应力幅分析及整桥的抗震分析,计算结果表明该方案是可行的。 展开更多
关键词 拉桥 双边箱主梁 结构分析 斜拉索计算 动力特性
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部