广州轨道交通L10施工总承包管理创新模式探索
1
作者 徐波 《中国市政工程》 2022年第2期44-46,107,共4页
广州轨道交通L10由多家不同体制参建单位、多工种、多专业配合施工,且施工环境和地质条件相对复杂,给总承包带来管理难题。介绍L10的施工总承包管理方法,探讨轨道交通施工时针对多家不同体制参建单位的总承包模式,提出质量、安全、进度... 广州轨道交通L10由多家不同体制参建单位、多工种、多专业配合施工,且施工环境和地质条件相对复杂,给总承包带来管理难题。介绍L10的施工总承包管理方法,探讨轨道交通施工时针对多家不同体制参建单位的总承包模式,提出质量、安全、进度为目标的标准化成本控制的“TDEI”协调管理机制,建设了专线的视频监控系统,即时性解决现场发生的问题。运用模糊综合评价法对有效性进行评价。评价结果表明,采用协调管理机制有效性等级为“较优”,可为类似轨道交通建设工程管理提供指导。 展开更多
关键词 轨道交通 工程管理 施工承包管理方法 协调管理机制
下载PDF
Performance of seven highway construction contracting methods analyzed by project size 被引量:1
2
作者 Yuanxin ZHANG Abdol CHINI +2 位作者 R.Edward MINCHIN Jr. Lourdes PTSCHELINZEW Dev SHAH 《Frontiers of Engineering Management》 2018年第2期240-250,共11页
The conventional Design-Bid-Build(DBB)construction contracting method has had various drawbacks exposed in highway construction practice, including lack of communication, inefficient design, antagonizing relationships... The conventional Design-Bid-Build(DBB)construction contracting method has had various drawbacks exposed in highway construction practice, including lack of communication, inefficient design, antagonizing relationships, and increased disputes. To mitigate the negative aspects of DBB, several alternative contracting methods and alternative project delivery systems have been devised and introduced to the industry over the past30 years. Five such innovations were tested by a research team from the University of Florida under the sponsorship of the Florida Department of Transportation(FDOT). To perform a realistic assessment, this study categorized FDOT projects built between 2006 and 2015 into groups according to current contract amounts. Both absolute and relative metrics were defined and employed. For comparison purposes, a collective analysis on all gathered data was performed. Additionally, the influence of outliers on the results was examined. The results showed that analyses based on individual cost categories are more convincing because large projects tend to impose stronger influence on the analyses. In addition, outliers must be identified and screened to reach realistic and reliable conclusions. With regard to the actual performance of the contracting methods, each performs differently within different cost categories. 展开更多
关键词 alternative contracting methods time cost performance evaluation