南桥渡槽拆除重建施工技术 被引量:5
1
作者 刘波 郑斌 《水科学与工程技术》 2017年第2期88-90,共3页
针对南桥渡槽年久失修产生的病害,结合标段内工程特点和混凝土生产系统工艺,讨论了渡槽拆除和重建的施工方法。工程区现有条件表明,渡槽附近石料质量和储量均能满足工程用石料和混凝土骨料的要求,可直接降低工程运输成本和建设工期,为... 针对南桥渡槽年久失修产生的病害,结合标段内工程特点和混凝土生产系统工艺,讨论了渡槽拆除和重建的施工方法。工程区现有条件表明,渡槽附近石料质量和储量均能满足工程用石料和混凝土骨料的要求,可直接降低工程运输成本和建设工期,为实现工期目标提供保证。 展开更多
关键词 南桥渡槽 拆除 重建 施工方技术
下载PDF
Optimization of construction scheme and supporting technology for HJS soft rock tunnel 被引量:8
2
作者 Wang Shuren Li Chunliu +1 位作者 Liu Zhaowei Fang Junbo 《International Journal of Mining Science and Technology》 SCIE EI 2014年第6期847-852,共6页
For a soft rock tunnel under high stress in jointed and swell soft rock (HJS), two construction schemes pilot-tunneling enlarging excavation and step-by-step excavation were optimized using FLAC20, and the deformati... For a soft rock tunnel under high stress in jointed and swell soft rock (HJS), two construction schemes pilot-tunneling enlarging excavation and step-by-step excavation were optimized using FLAC20, and the deformation effects of the two construction schemes were verified by field tests. Based on engineer- ing geological investigation and mechanical analysis of large deformations, the complex deformation mechanisms of stress expansion and structural deformation of the soft rock tunnel were confirmed, and support countermeasures from the complex deformation mechanism converted to a single type were proposed, and the support parameters were optimized by field tests. These technologies were proved by engineering practice, which produced significant technical and economic benefits. 展开更多
关键词 Soft rock tunnel High stress Deformation mechanism Support parameters Optimization
下载PDF
Construction Control and Monitoring of Large Span Continuous Steel Arch Bridge Based on 3G Network
3
作者 NI Chuanzhi SONG Yumin 《International English Education Research》 2018年第4期39-42,共4页
This paper takes the right branch main channel Bridge of Huai River Bridge in Huainan as the engineering background, uses the finite element software Midas and the ANSYS to simulate and analyze the jacking constructio... This paper takes the right branch main channel Bridge of Huai River Bridge in Huainan as the engineering background, uses the finite element software Midas and the ANSYS to simulate and analyze the jacking construction of the bridge, and according to the theoretical calculation, the construction monitoring plan is developed, and the stress and deformation of the key section and part of the structure are monitored. Construction monitoring combined with 3 g network and data acquisition module, monitoring data for the real time measurement, the centralized acquisition and wireless transmission, accomplish on-line real-time monitoring of the bridge construction process, effective control of jacking construction and monitoring. The comparison between theoretical analysis and measured results shows that the simulation results are reasonable, and the construction monitoring scheme based on 3G network and data collection can be used as reference. 展开更多
关键词 bridge engineering Jacking construction simulation analysis 3G network real-time monitoring