In view of the relative positioning problem between non-regular quadrilateral grids and regular rectangle grid nodes in the wave front construction method, concrete realization problems with four grid positioning meth...In view of the relative positioning problem between non-regular quadrilateral grids and regular rectangle grid nodes in the wave front construction method, concrete realization problems with four grid positioning methods (vector cross product judgment, angle sum, intersection-point, and signs comparison algorithms) in wave front construction which are commonly used in computer graphics are compared and analyzed in this paper. Based on the stability analysis of the location method, the calculation examples show that the vector cross product judgment method is faster and more accurate than other methods in the realization of the relative positioning between non-regular quadrilateral grids and regular rectangle grid nodes in wave front construction. It provides precise grid point attribute values for the next steps of migration and demigration.展开更多
Based on job analysis for the permanent departments of construction enterprises, by combining KPI assessment method and 360-degree evaluation method, this article establishes a set of human resource performance evalua...Based on job analysis for the permanent departments of construction enterprises, by combining KPI assessment method and 360-degree evaluation method, this article establishes a set of human resource performance evaluation indicator system; by determining indicators' weights and evaluators' grading weights through analytic hierarchy process (AHP), offering a kind of dynamic computing method for performance evaluation, and tightly linking the evaluation result to employees' personal interests, this article builds up a set of scientific performance evaluation system. This article takes the engineering department of construction enterprises for example to explain the calculation and application of performance evaluation result. This article provides construction enterprises with a method reference for human resource performance evaluation.展开更多
Underground engineering,including shield tunnel construction,is a significant contributor to carbon dioxide emissions in infrastructure engineering projects.To better predict and control the carbon emissions associate...Underground engineering,including shield tunnel construction,is a significant contributor to carbon dioxide emissions in infrastructure engineering projects.To better predict and control the carbon emissions associated with shield tunnel construction,this paper presents a novel calculation method:the modified process analysis method based on inputoutput and process analysis methods.To evaluate the effectiveness of the proposed method,a specific shield tunnel construction project was selected as a case study.The modified process analysis method was used to analyze the various factors that influence carbon emissions during the project’s construction phase.In addition,a neural network approach was applied to validate the accuracy of the calculation using the LSTM and BP neural network.The results demonstrate that the proposed method not only combines the strengths of traditional methods but also offers high accuracy and acceptable error rates.Based on these findings,several measures to reduce carbon emissions during shield tunnel construction are suggested,providing valuable insights for reducing CO_(2) emissions associated with infrastructure engineering projects.This study highlights the importance of adopting innovative approaches to reduce carbon emissions and promotes the implementation of sustainable practices in the construction industry.Through the use of advanced analytical methods,such as the proposed modified process analysis method,we can effectively mitigate the environmental impact of construction activities and make significant contributions to the global effort to combat climate change.展开更多
基金This research work is supported by the Projects of National Science Foundation of China (Grant No, 40574052 and 40437018) and National Basic Research Program of China (973 Program) (Grant No. 2007CB209603).Acknowledgements We wish to thank Researcher Xu Tao for his advice and comment. We also thank Mrs. Wang Kun for her help in the process of translation.
文摘In view of the relative positioning problem between non-regular quadrilateral grids and regular rectangle grid nodes in the wave front construction method, concrete realization problems with four grid positioning methods (vector cross product judgment, angle sum, intersection-point, and signs comparison algorithms) in wave front construction which are commonly used in computer graphics are compared and analyzed in this paper. Based on the stability analysis of the location method, the calculation examples show that the vector cross product judgment method is faster and more accurate than other methods in the realization of the relative positioning between non-regular quadrilateral grids and regular rectangle grid nodes in wave front construction. It provides precise grid point attribute values for the next steps of migration and demigration.
文摘Based on job analysis for the permanent departments of construction enterprises, by combining KPI assessment method and 360-degree evaluation method, this article establishes a set of human resource performance evaluation indicator system; by determining indicators' weights and evaluators' grading weights through analytic hierarchy process (AHP), offering a kind of dynamic computing method for performance evaluation, and tightly linking the evaluation result to employees' personal interests, this article builds up a set of scientific performance evaluation system. This article takes the engineering department of construction enterprises for example to explain the calculation and application of performance evaluation result. This article provides construction enterprises with a method reference for human resource performance evaluation.
基金supported by the National Natural Science Foundation of China(Grant No.52079128)Anhui province university discipline(professional)top talents academic funding project,project number:gxbjZD2022085.
文摘Underground engineering,including shield tunnel construction,is a significant contributor to carbon dioxide emissions in infrastructure engineering projects.To better predict and control the carbon emissions associated with shield tunnel construction,this paper presents a novel calculation method:the modified process analysis method based on inputoutput and process analysis methods.To evaluate the effectiveness of the proposed method,a specific shield tunnel construction project was selected as a case study.The modified process analysis method was used to analyze the various factors that influence carbon emissions during the project’s construction phase.In addition,a neural network approach was applied to validate the accuracy of the calculation using the LSTM and BP neural network.The results demonstrate that the proposed method not only combines the strengths of traditional methods but also offers high accuracy and acceptable error rates.Based on these findings,several measures to reduce carbon emissions during shield tunnel construction are suggested,providing valuable insights for reducing CO_(2) emissions associated with infrastructure engineering projects.This study highlights the importance of adopting innovative approaches to reduce carbon emissions and promotes the implementation of sustainable practices in the construction industry.Through the use of advanced analytical methods,such as the proposed modified process analysis method,we can effectively mitigate the environmental impact of construction activities and make significant contributions to the global effort to combat climate change.