期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
项目建设质量及进度管控影响因素探讨
1
作者 陈凯 《前卫》 2020年第7期73-75,共3页
建筑行业近些年来得到快速的发展,对我国经济的发展起到了推动作用.我国的建筑水平在不断地提高,设计和施工技术方面不断革新,但同时,在建设项目实施过程中也存在一些问题.为了使项目的施工潜能得到最大限度的发挥,管理人员要对施工工... 建筑行业近些年来得到快速的发展,对我国经济的发展起到了推动作用.我国的建筑水平在不断地提高,设计和施工技术方面不断革新,但同时,在建设项目实施过程中也存在一些问题.为了使项目的施工潜能得到最大限度的发挥,管理人员要对施工工艺和管理方式进行优化和调整,协调施工质量、成本、进度三者的关系,以保证项目质量和进度目标的实现.本文首先对施工进度控制与管理的重要性进行了说明,分析了质量与进度管控的影响因素,对质量和进度管理的要点进行了探讨,提出了相应的管理策略,以供参考. 展开更多
关键词 项目建设 施工方质量 进度管理
下载PDF
Real-time compaction quality monitoring of high core rockfill dam 被引量:48
2
作者 ZHONG DengHua LIU DongHai CUI Bo 《Science China(Technological Sciences)》 SCIE EI CAS 2011年第7期1906-1913,共8页
The conventional quality control method of core rocldill dam construction exhibit difficulty controlling compaction parameters accurately or ensuring construction quality. This is because it is easily influenced by hu... The conventional quality control method of core rocldill dam construction exhibit difficulty controlling compaction parameters accurately or ensuring construction quality. This is because it is easily influenced by human behavior or lack of adequate management. We therefore establish the timely monitoring indexes and control criteria of compaction processes by considering the characteristics and quality requirements of high core rockffll dam construction. Based on the established indexes and criteria, integrating GPS, GPRS and PDA technologies, a real-time compaction quality monitoring method is proposed. The relevant key techniques are proposed as well, including automatic collection of information and a graphic algorithm for rolling-process visualization. By the proposed method and techniques, a real-time monitoring system is provided to realize the precise automatic online entire-process monitoring of compaction parameters, including compaction pass, rolling trajectory, nmning speed of roller, vibration status and rolled pavement thickness. The application of the Nuozhadu project shows that the proposed system can control compaction parameters effectively and ensure better construction quality. Therefore, it might become a new way towards construction quality control of high core rockfill dam. 展开更多
关键词 core rockfill dam compaction quality real-time monitoring quality control
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部