关于施工过程中项目成本控制的注意事项
1
作者 丁海燕 《大陆桥视野》 2012年第12期28-29,共2页
在施工项目成本控制的过程中,只要成本控制人员科学、合理、细心地对待现场出现的各种变化,就能够在保证工程施工质量和进度的前提下,有效地控制工程成本,使项目达到最佳的性价比。
关键词 施工过程项目成本成本控制措施建议注意事项
下载PDF
浅谈住宅楼房质量通病的技术应对措施
2
作者 彭正山 《中国房地产业》 2011年第3X期270-270,共1页
目前,新建新区房屋特别是住宅楼房的渗漏现象比较普遍。其中,屋面、厨卫间和窗框是典型的渗漏部位。本文以安徽淮北矿业集团濉河花园住房小区工程实践为例,对常见渗漏现象的产生原因进行分析,并提出在施工过程中应采取的控制施。分析其... 目前,新建新区房屋特别是住宅楼房的渗漏现象比较普遍。其中,屋面、厨卫间和窗框是典型的渗漏部位。本文以安徽淮北矿业集团濉河花园住房小区工程实践为例,对常见渗漏现象的产生原因进行分析,并提出在施工过程中应采取的控制施。分析其原因,预防混凝土施工裂缝。因施工时混凝土振捣不实或漏振,产生蜂窝孔洞等通病,对此文章提出预防方法。 展开更多
关键词 住宅楼房裂缝 渗漏 施工过程控制措施
下载PDF
Control measures for thermal effects during placement of span-scale girder segments on continuous steel box girder bridges 被引量:3
3
作者 Jin-feng WANG Jiang-tao ZHANG +1 位作者 Zhong-xuan YANG Rong-qiao XU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2020年第4期255-267,共13页
In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a ... In this study, we examined the thermal effects throughout the process of the placement of span-scale girder segments on a 6×110-m continuous steel box girder in the Hong Kong-Zhuhai-Macao Bridge. Firstly, when a span-scale girder segment is temporarily stored in the open air, temperature gradients will significantly increase the maximum reaction force on temporary supports and cause local buckling at the bottom of the girder segment. Secondly, due to the temperature difference of the girder segments before and after girth-welding, some residual thermal deflections will appear on the girder segments because the boundary conditions of the structure are changed by the girth-welding. Thirdly, the thermal expansion and thermal bending of girder segments will cause movement and rotation of bearings, which must be considered in setting bearings. We propose control measures for these problems based on finite element method simulation with field-measured temperatures. The local buckling during open-air storage can be avoided by reasonably determining the appropriate positions of temporary supports using analysis of overall and local stresses. The residual thermal deflections can be overcome by performing girth-welding during a period when the vertical temperature difference of the girder is within 1 °C, such as after 22:00. Some formulas are proposed to determine the pre-set distances for bearings, in which the movement and rotation of the bearings due to dead loads and thermal loads are considered. Finally, the feasibility of these control measures in the placement of span-scale girder segments on a real continuous girder was verified: no local buckling was observed during open-air storage;the residual thermal deflections after girth-welding were controlled within 5 mm and the residual pre-set distances of bearings when the whole continuous girder reached its design state were controlled within 20 mm. 展开更多
关键词 Steel box girder Span-scale girder segments Construction process Thermal effects Control measures
原文传递