期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
具有时变马尔可夫调制服务速率的M2M小数据业务排队分析模型
1
作者 迟学芬 胡广 +2 位作者 陈洁 董雯 王春悦 《吉林大学学报(工学版)》 EI CAS CSCD 北大核心 2015年第3期966-972,共7页
将机器类通信(M2M)监控视频类业务(SVS)优先占用网络带宽时,网络对M2M小数据类业务(SDS)的服务过程抽象为时变马尔可夫调制服务率的包级排队系统,研究了网络对SDS的服务能力以及SVS对SDS的制约。求解了叠加在SDS随机到达过程上的多态马... 将机器类通信(M2M)监控视频类业务(SVS)优先占用网络带宽时,网络对M2M小数据类业务(SDS)的服务过程抽象为时变马尔可夫调制服务率的包级排队系统,研究了网络对SDS的服务能力以及SVS对SDS的制约。求解了叠加在SDS随机到达过程上的多态马尔可夫调制泊松过程(MMPP)环境状态概率空间。运用第一步分析法和LS变换,分析了在随机环境过程下SDS的复杂随机服务过程,求解了SDS包服务时间的均值和方差。最后,通过数值仿真给出了SVS的突发度、到达率和服务率对SDS服务特性的影响。 展开更多
关键词 通信技术 通信网络建模 机器类通信 BETA分布 时变服务率 马尔可夫过程 排队论
下载PDF
Operation safety risk analysis method of hydropower project considering time-dependent effect
2
作者 Zhang Sherong Yan Lei 《Engineering Sciences》 EI 2012年第5期45-50,共6页
In order to consider the time-dependent characteristic of risk factors of hydropower project,the method of stochastic process simulating structure resistance and load effect is adopted.On the basis of analyzing the st... In order to consider the time-dependent characteristic of risk factors of hydropower project,the method of stochastic process simulating structure resistance and load effect is adopted.On the basis of analyzing the structure characteristics and mode of operation,the operation safety risk rate assessment model of hydropower project is established on the comprehensive application of the improved analytic hierarchy process,the time-dependent reliability theory and the risk rate threshold.A scheme to demonstrate the time-dependent risk rate assessment method for an example of the earth-rock dam is particularly implemented by the proposed approach.The example shows that operation safety risk rate is closely related to both the service period and design standard;considering the effect of time-dependent,the risk rate increases with time and the intersection of them reflects the technical service life of structures.It could provide scientific basis for the operation safety and risk decision of the hydropower project by predicting the trend of risk rate via this model. 展开更多
关键词 operation safety of hydropower project risk analysis risk rate assessment time-dependent reliability improved analytic hierarchy process
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部