期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
树立时空观念 初探时限工程
1
作者 刘玉成 《邮政研究》 1997年第4期9-11,共3页
运用系统理论和价值规律,分析了邮政企业现状;提出了时限水平的概念,通过对比分析及计算,总结了运用经济手段,提高时限水平以及树立时空观念,科学管理时限的具体措施。
关键词 时限水平 时空观念 时限工程
下载PDF
Seem to overrun on time and budget for engineering projects
2
作者 CHEN Yu LIANG De Xiang 《International Journal of Technology Management》 2014年第8期177-178,共2页
In this thesis,construction industries face with the major challenges are cost overruns and time delays, which have existed in most of projects, especially in developing countries. Construction projects and the enviro... In this thesis,construction industries face with the major challenges are cost overruns and time delays, which have existed in most of projects, especially in developing countries. Construction projects and the environment are increasingly complex, thus it has greater demands on project managers and cost managers that deliver processes on time. However the process of construction is limited to unforeseeable and variable factors, resulting from many sources. The aim of the report is to analyze determining factors about causing budget overrun and time delays by reviewing and identifying past cases. Furthermore, the construction process is made up of three critical phases, i.e. conception, design, construction. Generally, the majority of time delays and cost overrun happen in the period of construction, where many factors are always unforeseeable, and time delays usually associate with cost overruns. (Chan and Kumaraswamy, 1997) 展开更多
关键词 cost overruns and time delays the construction process case studies client and consultant
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部