Mooring,towing and installing tests on immersed tunnel caissons across the Yong River are carried out in basin to investigate the motions and line tensions.In the towing operation,the maximum tension exists in the cas...Mooring,towing and installing tests on immersed tunnel caissons across the Yong River are carried out in basin to investigate the motions and line tensions.In the towing operation,the maximum tension exists in the case that half caisson is exposed to waves and currents.The cooperation of operating manually on many lines at the same time is very difficult and important.The dynamic behavior of the caisson and the line tensions are affected more by the manual operations than by waves and currents.In the installing operation,the tensions of hoisting lines are much larger than the positioning lines.展开更多
基金the Science and Technology Committee of Shanghai (No. 07DZ22027)
文摘Mooring,towing and installing tests on immersed tunnel caissons across the Yong River are carried out in basin to investigate the motions and line tensions.In the towing operation,the maximum tension exists in the case that half caisson is exposed to waves and currents.The cooperation of operating manually on many lines at the same time is very difficult and important.The dynamic behavior of the caisson and the line tensions are affected more by the manual operations than by waves and currents.In the installing operation,the tensions of hoisting lines are much larger than the positioning lines.