期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
悬索桥成桥状态计算方法 被引量:17
1
作者 张志国 张庆芳 邹振祝 《长安大学学报(自然科学版)》 EI CAS CSCD 北大核心 2006年第1期59-62,66,共5页
假设悬索桥主缆自重沿弧长均匀分布,加劲梁、桥面等其余恒载沿水平均匀分布,考虑主缆弹性伸长对其自重集度的影响,导出了以参数u(shu=dy/dx)表示的主缆线形方程。由边界条件,建立了求解主缆水平张力和端点未知参数的非线性方程组,采用... 假设悬索桥主缆自重沿弧长均匀分布,加劲梁、桥面等其余恒载沿水平均匀分布,考虑主缆弹性伸长对其自重集度的影响,导出了以参数u(shu=dy/dx)表示的主缆线形方程。由边界条件,建立了求解主缆水平张力和端点未知参数的非线性方程组,采用拟牛顿法求解。然后通过改变参数u来确定主缆线形坐标。最后由积分法导出了主缆索有应力和无应力长的计算公式。算例表明该方法收敛速度较快,计算精度较高,可用于悬索桥设计与施工控制计算。 展开更多
关键词 桥梁工程 悬索桥 主缆 应力 有应力长 计算方法
下载PDF
Secondary settlement estimation in surcharge preload subject to time effect of secondary consolidation coefficient 被引量:2
2
作者 胡亚元 杨平 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第2期341-352,共12页
In order to eliminate the settlement underestimation in surcharge preload engineering, a study based on Bjerrum's creep diagram and the tangent slope definition of secondary consolidation coefficient was carried o... In order to eliminate the settlement underestimation in surcharge preload engineering, a study based on Bjerrum's creep diagram and the tangent slope definition of secondary consolidation coefficient was carried out to analyze the time effect of secondary consolidation coefficient of over consolidated soil, and a time–growth model for it was formulated. As Bjerrum's creep diagram is an idealized model, oedometer tests were performed to improve the above time–growth model of secondary consolidation coefficient for the purpose of achieving a better agreement with the actual ground situations. It is found that secondary consolidation coefficient of over consolidated soil not only decreases with the ratio of historical maximum to current effective stress of soil(OCR), but also increases with the development time of secondary consolidation. No matter how large OCR is, the long-term time effect of secondary consolidation coefficient of over consolidated soil is all significant. Based on the above results, a model for settlement estimation was formulated and a case study to estimate it indicates that the settlement estimated by our method is 2–5 times larger than that estimated by the previous method. Moreover, the larger the OCR is as well as the longer the service life is, the larger the difference between our method and the previous method is. Thus, the post-construction secondary settlement in surcharge preload engineering will be underestimated when neglecting the time effect of secondary consolidation coefficient in over consolidated state. 展开更多
关键词 post-construction secondary settlement time effect tangent slope secondary consolidation coefficient
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部