Based on tests and theoretical calculation an optimum steam admission mode is proposed which can effectively solve the steam-excited vibration.An operation mode jointly considering the valve point and operation load i...Based on tests and theoretical calculation an optimum steam admission mode is proposed which can effectively solve the steam-excited vibration.An operation mode jointly considering the valve point and operation load is proposed based on the analysis and study of a large number of unit operation optimization methods.According to the steam-excited vibration that occurs during the optimization process when the nozzle governing steam turbine switches from a single valve to multi-valves a steam admission optimization program is proposed.This comprehensive program considering the steam-excited vibration is applied to a 600 MW steam turbine unit to obtain the optimum sliding pressure curve and the optimum operation mode and the steam-excited vibration is solved successfully.展开更多
The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters...The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational.展开更多
This paper focused on generation scheduling problem with consideration of wind, solar and PHES (pumped hydro energy storage) system. Wind, solar and PHES are being considered in the NEPS (northeast power system) o...This paper focused on generation scheduling problem with consideration of wind, solar and PHES (pumped hydro energy storage) system. Wind, solar and PHES are being considered in the NEPS (northeast power system) of Afghanistan to schedule all units power output so as to minimize the total operation cost of thermal units plus aggregate imported power tariffs during the scheduling horizon, subject to the system and unit operation constraints. Apart from determining the optimal output power of each unit, this research also involves in deciding the on/off status of thermal units. In order to find the optimal values of the variables, GA (genetic algorithm) is proposed. The algorithm performs efficiently in various sized thermal power system with equivalent wind, solar and PHES and can produce a high-quality solution. Simulation results reveal that with wind, solar and PHES the system is the most-cost effective than the other combinations.展开更多
基金The National Natural Science Foundation of China(No.51176031)
文摘Based on tests and theoretical calculation an optimum steam admission mode is proposed which can effectively solve the steam-excited vibration.An operation mode jointly considering the valve point and operation load is proposed based on the analysis and study of a large number of unit operation optimization methods.According to the steam-excited vibration that occurs during the optimization process when the nozzle governing steam turbine switches from a single valve to multi-valves a steam admission optimization program is proposed.This comprehensive program considering the steam-excited vibration is applied to a 600 MW steam turbine unit to obtain the optimum sliding pressure curve and the optimum operation mode and the steam-excited vibration is solved successfully.
文摘The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational.
文摘This paper focused on generation scheduling problem with consideration of wind, solar and PHES (pumped hydro energy storage) system. Wind, solar and PHES are being considered in the NEPS (northeast power system) of Afghanistan to schedule all units power output so as to minimize the total operation cost of thermal units plus aggregate imported power tariffs during the scheduling horizon, subject to the system and unit operation constraints. Apart from determining the optimal output power of each unit, this research also involves in deciding the on/off status of thermal units. In order to find the optimal values of the variables, GA (genetic algorithm) is proposed. The algorithm performs efficiently in various sized thermal power system with equivalent wind, solar and PHES and can produce a high-quality solution. Simulation results reveal that with wind, solar and PHES the system is the most-cost effective than the other combinations.