【本刊2019年7月综合报道】美国纽斯凯尔公司(Nu Scale)联合创始人、首席技术官兼非能动冷却小型模块化反应堆(SMR)联合设计师Jose N. Reyes 2019年6月在接受媒体采访时介绍了美国首座小堆电厂的建设时间表以及纽斯凯尔在供应链建设方...【本刊2019年7月综合报道】美国纽斯凯尔公司(Nu Scale)联合创始人、首席技术官兼非能动冷却小型模块化反应堆(SMR)联合设计师Jose N. Reyes 2019年6月在接受媒体采访时介绍了美国首座小堆电厂的建设时间表以及纽斯凯尔在供应链建设方面取得的进展。美国核管会(NRC)将于2020年9月完成对纽斯凯尔小堆的设计认证;纽斯凯尔的第一个客户,即犹他州联合市政电力系统(UAMPS),准备在爱达荷国家实验室(INL)建设一座由12座小堆组成的电厂。展开更多
The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters...The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational.展开更多
文摘【本刊2019年7月综合报道】美国纽斯凯尔公司(Nu Scale)联合创始人、首席技术官兼非能动冷却小型模块化反应堆(SMR)联合设计师Jose N. Reyes 2019年6月在接受媒体采访时介绍了美国首座小堆电厂的建设时间表以及纽斯凯尔在供应链建设方面取得的进展。美国核管会(NRC)将于2020年9月完成对纽斯凯尔小堆的设计认证;纽斯凯尔的第一个客户,即犹他州联合市政电力系统(UAMPS),准备在爱达荷国家实验室(INL)建设一座由12座小堆组成的电厂。
文摘The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational.