期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
谈现浇混凝土空心楼板(GBF管)应用新技术 被引量:4
1
作者 丁华东 杨洪君 张永生 《黑龙江科技信息》 2008年第7期239-239,共1页
现浇混凝土空心楼板(GBF管)是近几年在南方,特别是江苏省使用的新技术,在山东还是刚刚兴起的技术,它主要是采用埋入式内模形成现浇混凝土空心结构,从而使得楼板具有减轻自重、降低地震影响等优点,更能够降低造价。主要谈大面积GBF管安... 现浇混凝土空心楼板(GBF管)是近几年在南方,特别是江苏省使用的新技术,在山东还是刚刚兴起的技术,它主要是采用埋入式内模形成现浇混凝土空心结构,从而使得楼板具有减轻自重、降低地震影响等优点,更能够降低造价。主要谈大面积GBF管安装、固定及GBF管抗浮技术在鲁邦广场工程中的应用。 展开更多
关键词 筒芯(GBF管) 肋宽 厚度 板底厚度 抗浮
下载PDF
Determination of isolation layer thickness for undersea mine based on differential cubature solution to irregular Mindlin plate 被引量:14
2
作者 PENG Kang 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第3期708-719,共12页
The differential cubature solution to the problem of a Mindlin plate lying on the Winkler foundation with two simply supported edges and two clamped edges was derived.Discrete numerical technology and shape functions ... The differential cubature solution to the problem of a Mindlin plate lying on the Winkler foundation with two simply supported edges and two clamped edges was derived.Discrete numerical technology and shape functions were used to ensure that the solution is suitable to irregular shaped plates.Then,the mechanical model and the solution were employed to model the protection layer that isolates the mining stopes from sea water in Sanshandao gold mine,which is the first subsea mine of China.Furthermore,thickness optimizations for the protection layers above each stope were conducted based on the maximum principle stress criterion,and the linear relations between the best protection layer thickness and the stope area under different safety factors were regressed to guide the isolation design.The method presented in this work provides a practical way to quickly design the isolation layer thickness in subsea mining. 展开更多
关键词 subsea mine irregular Mindlin plate differential cubature method isolation layer protection layer thicknessoptimization
下载PDF
Mitigation of floor heave in West Kentucky Coal Mine 被引量:4
3
作者 Perry Kyle Bradley Joel +1 位作者 Unrug Kot Klimek Mark 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期521-525,共5页
A West Kentucky mine operation in No. 11 seam encountered floor heave, due to the localized increase in the thickness of the fireclay mine floor. Floor heave has overridden seals installed in two mined out panels. The... A West Kentucky mine operation in No. 11 seam encountered floor heave, due to the localized increase in the thickness of the fireclay mine floor. Floor heave has overridden seals installed in two mined out panels. The third seal's location was planned for isolating that area from the Mains. A plan of support has been developed to prevent repetition of the floor heave and related problems outby the seals. The applied ground control measures were successful. An attempt of a 3D numerical modeling was made; thus, it would match the observed behavior of the mine floor and could be used as a design tool in similar conditions. The paper describes sequence of events, an applied mitigation ground control system, and the first stage of numerical modeling. 展开更多
关键词 Floor heave Presplit Secondary support Modeling
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部