The first component of a building implemented in a virtual prototype concerning the management of a building is a lighting system. It was applied in a study case. The interactive application allows the examination of ...The first component of a building implemented in a virtual prototype concerning the management of a building is a lighting system. It was applied in a study case. The interactive application allows the examination of the physical model, visualizing, for each element modeled in three-dimensions (3D) and linked to a database, the corresponding technical information concerned with the use of the material, calculated for different points in time during their life. The control of a lamp stock, the constant updating of lifetime information and the planning of periodical local inspections are attended on the prototype. This is an important mean of cooperation between collaborators involved in the building management.展开更多
文摘The first component of a building implemented in a virtual prototype concerning the management of a building is a lighting system. It was applied in a study case. The interactive application allows the examination of the physical model, visualizing, for each element modeled in three-dimensions (3D) and linked to a database, the corresponding technical information concerned with the use of the material, calculated for different points in time during their life. The control of a lamp stock, the constant updating of lifetime information and the planning of periodical local inspections are attended on the prototype. This is an important mean of cooperation between collaborators involved in the building management.