There is a remarkable difference in stress distribution between a specimen and a plate removed from the specimen.The plate presents a uniform stress distribution whereas the specimen presents a non-uniform stress dist...There is a remarkable difference in stress distribution between a specimen and a plate removed from the specimen.The plate presents a uniform stress distribution whereas the specimen presents a non-uniform stress distribution.Firstly,the real stress distributions in plates with thickness of 30,40 and 50 mm and then in the specimens were obtained through simulation and X-ray surface stress measurement.Secondly,in order to study the impact of specimens shapes and processing ways on the results accuracy,two irregular shapes (parallelogram and trapezoid) and two processing ways (saw and electron discharge machining (EDM)) were compared and analyzed by simulation and experiment using layer removal method,then the specimen effects on measurement results were evaluated.The results show that:1) the non-uniform stress distribution characteristics of the specimen near the surface of the cut is significant,the range of non-uniform stress distribution is approximately one-thickness distance away from the cut,and it decreases gradually along the depth;2) In order to ensure the stability in the results,it is suitable to take the specimen plane size 2-3 times of its thickness;3) Conventional processing methods have little effect on experimental results and the average deviation is less than 5%.展开更多
There are several software estimation models such as Line of Code, Function Point and COnstructive COst MOdel (COCOMO). The original COCOMO model is one of the most widely practiced and popular among the software de...There are several software estimation models such as Line of Code, Function Point and COnstructive COst MOdel (COCOMO). The original COCOMO model is one of the most widely practiced and popular among the software development community because of its flexible usage. It is a suite of models i.e., COnstructive Cost MOdel I and COnstructive Cost MOdel II. in this paper, we are evaluating the both models, to find out the level of efficiency they present and how they can be tailored to the needs of modem software development projects. We are applying COCOMO models on a case study of an e-commerce application that is built using Hyper Text Markup Language (HTML) and JavaScript. We will also shed light on the different components of each model, and how their Cost Drivers effect on the accuracy of cost estimations for software development projects.展开更多
基金Project(2005CB623708) supported by the National Basic Research Program of China
文摘There is a remarkable difference in stress distribution between a specimen and a plate removed from the specimen.The plate presents a uniform stress distribution whereas the specimen presents a non-uniform stress distribution.Firstly,the real stress distributions in plates with thickness of 30,40 and 50 mm and then in the specimens were obtained through simulation and X-ray surface stress measurement.Secondly,in order to study the impact of specimens shapes and processing ways on the results accuracy,two irregular shapes (parallelogram and trapezoid) and two processing ways (saw and electron discharge machining (EDM)) were compared and analyzed by simulation and experiment using layer removal method,then the specimen effects on measurement results were evaluated.The results show that:1) the non-uniform stress distribution characteristics of the specimen near the surface of the cut is significant,the range of non-uniform stress distribution is approximately one-thickness distance away from the cut,and it decreases gradually along the depth;2) In order to ensure the stability in the results,it is suitable to take the specimen plane size 2-3 times of its thickness;3) Conventional processing methods have little effect on experimental results and the average deviation is less than 5%.
文摘There are several software estimation models such as Line of Code, Function Point and COnstructive COst MOdel (COCOMO). The original COCOMO model is one of the most widely practiced and popular among the software development community because of its flexible usage. It is a suite of models i.e., COnstructive Cost MOdel I and COnstructive Cost MOdel II. in this paper, we are evaluating the both models, to find out the level of efficiency they present and how they can be tailored to the needs of modem software development projects. We are applying COCOMO models on a case study of an e-commerce application that is built using Hyper Text Markup Language (HTML) and JavaScript. We will also shed light on the different components of each model, and how their Cost Drivers effect on the accuracy of cost estimations for software development projects.