A polynomial model, time origin shifting model(TOSM, is used to describe the trajectory of a moving target .Based on TOSM, a recursive laeast squares(RLS) algorithm with varied forgetting factor is derived for tracki...A polynomial model, time origin shifting model(TOSM, is used to describe the trajectory of a moving target .Based on TOSM, a recursive laeast squares(RLS) algorithm with varied forgetting factor is derived for tracking of a non-maneuvering target. In order to apply this algorithm to maneuvering targets tracking ,a tracking signal is performed on-line to determine what kind of TOSm will be in effect to track a target with different dynamics. An effective multiple model least squares filtering and forecasting method dadpted to real tracking of a maneuvering target is formulated. The algorithm is computationally more effcient than Kalman filter and the percentage improvement from simulations show both of them are considerably alike to some extent.展开更多
Starting with the meanings of the terms “risk” and “uncertainty,””he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of “risk” and “uncertainty...Starting with the meanings of the terms “risk” and “uncertainty,””he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of “risk” and “uncertainty” interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective, and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.展开更多
This article reports the discussion about the multiple relations between architectural design and "place" using two different approaches in order to characterize the interfaces of design challenges. The first is qua...This article reports the discussion about the multiple relations between architectural design and "place" using two different approaches in order to characterize the interfaces of design challenges. The first is qualitative, highlighting the lack of dialogue between the standard-project architecture, the guidelines recommended by the COEDI (Coordenagao Geral de Educao Infantil (General Coordination of Early Childhood Education)) of the Ministry of Education, socio-technical and cultural-environmental context and pedagogy. The second, more quantitative, addresses the problems generated by dissociation between the constructive solutions and the bioclimatic demands of different insertion contexts of architectural design in the Brazilian Bioclimatic Zone 2. Initially planned to use a conventional building system, it was transposed to the Wall System, developed by MVC Componentes Pl^tsticos Ltda. The simulation evaluates and compares the level of thermal comfort of the building with two envelope systems. The study reports the analysis of the thermal comfort of a Type C unit, based on thermodynamic simulation, through the software Design Builder (version 4.2.0.054). The analysis of the building simulation results was based on the adaptive comfort model ASHRAE 55/2010. Later, three optimization measures of the thermal comfort level of the building were tested, based on thermal insulation and absorptance coverage, in addition to sun protection system design for the window frames. Preliminary results for the level of comfort of long permanence environments indicate a tow level of thermal comfort, the 50% in MVC system and around 60% in the conventional system, and also that the greater discomfort comes from the heat. Based on performance optimization measures of building, the MVC system reached 66.4% of thermal comfort compared to 62% in the conventional system. The results show the importance of adapting the standard project to the local climatic context.展开更多
Hungary's accession to the European Union in 2004 marked the start of a new era. The completion of legal harmonization brought in new emission standards and thresholds, and this was followed by EU-assisted projects t...Hungary's accession to the European Union in 2004 marked the start of a new era. The completion of legal harmonization brought in new emission standards and thresholds, and this was followed by EU-assisted projects to build and reconstruct wastewater treatment plants. The utilization of sludge after it leaves the wastewater treatment plant is now a solely private-sector operation. There are new political priorities: increasing state involvement, buying out of major--formerly privatized--service providers, reintegration of isolated service providers, legally-imposed reduction of public utility charges. As a result, a demand has arisen for a greater central, i.e. government role in sludge utilization.展开更多
Based on this evidence and many other examples, this paper advocates a drastic overhaul of the system, in which a distinction is made between simple, standard projects, less simple solutions that can be assessed with ...Based on this evidence and many other examples, this paper advocates a drastic overhaul of the system, in which a distinction is made between simple, standard projects, less simple solutions that can be assessed with performance requirements, and high-value projects which are handled in accordance with the science of probabilistics. Next to or in addition to the Council of State, there has to be a technical body appointed under statute with non-departmental public body status, which can issue binding rulings in technical disputes, with very short procedural delays.展开更多
The paper systemizes standard methods of planning, monitoring and controlling the realization of construction works in civil engineering projects and overviews the implementation of the methods in Team Co Cakovec from...The paper systemizes standard methods of planning, monitoring and controlling the realization of construction works in civil engineering projects and overviews the implementation of the methods in Team Co Cakovec from Croatia. The specificities of the methods are shown through the different construction works projects. Also, paper reviews the implementation, modification and improvement of existing methods for planning, monitoring and controlling the realization of projects in Team Co.展开更多
This study theoretically showed the importance of standards economic growth to apply creative projects to avoid loss cost and efforts. There is problem of complexity environment to understand real economic growth. Com...This study theoretically showed the importance of standards economic growth to apply creative projects to avoid loss cost and efforts. There is problem of complexity environment to understand real economic growth. Companies and government can affect economic. There is a need to make standards to control steps of economic growth as result to accounting gaps, economic gaps, and financial analysis gaps. Standards must face negative affection of speculation, government involving in economic, developing tool. Evaluating must be built up to real market price and also standards must build trust to support developing. Searcher recommended linking economic growth with real growth of producing and ways to get real market price to evaluate company assets, liabilities, and net profit after tax for all users as factors show growth in company to growth economic units which are successful by applying creative projects.展开更多
Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis...Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.展开更多
This paper introduces the progress of State Grid Corporation of China (SGCC) in smart grid standardization, including the smart grid standards system, standards reversion and development, the role of standards syste...This paper introduces the progress of State Grid Corporation of China (SGCC) in smart grid standardization, including the smart grid standards system, standards reversion and development, the role of standards system in smart grid demonstration projects, and the situation of SGCC participation in both domestic and international smart grid standardization work.展开更多
Many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. At this time, there is no standard method to analyze a delay claim. This paper first introduced a...Many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. At this time, there is no standard method to analyze a delay claim. This paper first introduced a fictional case study that has most types of delay and acceleration events that might be faced on a real project. The case study is applied to all current techniques of delay claims that have been identified from previous studies. The comparison uses the delay claim issues as criteria to evaluate all the delay claim techniques from the case study results. The case study result and discussion demonstrate that the Day-by-Day technique satisfies all the desired criteria while other techniques lack some.展开更多
The electromagnetic compatibility of electric vehicles is not only the important technology issue in researches,development and industrialization of electric vehicles,but also the key research area of ISO.In this pape...The electromagnetic compatibility of electric vehicles is not only the important technology issue in researches,development and industrialization of electric vehicles,but also the key research area of ISO.In this paper,both national and international standards of electromagnetic compatibility of electric vehicles are analyzed;it is also suggested that our standards of electromagnetic compatibility of electric vehicles be improved from several aspects such as testing items,test procedures,limit value,etc.The electromagnetic environment of electric vehicles is analyzed in terms of interfering sources,providing the solutions to electromagnetic compatibility and measures of reducing electromagnetic interference.Advanced equipments introduced into Chinese electromagnetic compatibility testing laboratories accelerate the pace of the researches on related technologies and standards;China will develop the standards system which covers from the complete electric vehicle to the key components,promote the technology improvement and industrialization work of Chinese electric vehicles,transform the latest achievements and advanced experiences of Chinese electric vehicles industry to the related standards and contribute the development of international standards.展开更多
After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve t...After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.展开更多
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e...In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.展开更多
There are several software estimation models such as Line of Code, Function Point and COnstructive COst MOdel (COCOMO). The original COCOMO model is one of the most widely practiced and popular among the software de...There are several software estimation models such as Line of Code, Function Point and COnstructive COst MOdel (COCOMO). The original COCOMO model is one of the most widely practiced and popular among the software development community because of its flexible usage. It is a suite of models i.e., COnstructive Cost MOdel I and COnstructive Cost MOdel II. in this paper, we are evaluating the both models, to find out the level of efficiency they present and how they can be tailored to the needs of modem software development projects. We are applying COCOMO models on a case study of an e-commerce application that is built using Hyper Text Markup Language (HTML) and JavaScript. We will also shed light on the different components of each model, and how their Cost Drivers effect on the accuracy of cost estimations for software development projects.展开更多
Successful and cost-effective construction relies upon appropriate communication of the participants of the construction project. Hence, it is important to define the rights and responsibilities of the parties, and re...Successful and cost-effective construction relies upon appropriate communication of the participants of the construction project. Hence, it is important to define the rights and responsibilities of the parties, and relationships among them. In this context, well-designed and complete agreement is essential and necessary for the successfully completion of a construction project within the desired time, quality and budget. In this paper, it is aimed to analyze and compare the owner-contractor agreements in the Turkish and the US construction industry. First, the importance of construction contracts and contractual elements of an agreement is determined, and then, the standard owner-contractor agreement which is used in the Turkish construction industry is analyzed and compared with the US standard owner-contractor agreement. Finally, the differences between these agreements are put forward, the lack and deficiencies of Turkish standard agreement form are determined, and appropriate suggestions are improved.展开更多
Using modern project managementprinciples,this paper analyzes the current state ofmarine research project management in China.Itexplains the function and significance of standardizedproject management,and then puts fo...Using modern project managementprinciples,this paper analyzes the current state ofmarine research project management in China.Itexplains the function and significance of standardizedproject management,and then puts forwardstrategies for the implementation of standardizationof marine project management.This is done to improvemarine research project management inChina,better the level of scientific research intooceans and promote the development of marinescience and technology in China.展开更多
In this thesis, the design in construction management is defined as the design meets the requirements of the constructor. There are a range of definitions of design, but in this paper "design" refers to something, w...In this thesis, the design in construction management is defined as the design meets the requirements of the constructor. There are a range of definitions of design, but in this paper "design" refers to something, which has been planned and made and a pattern for decorating in something in the term of construction. Rumane says (2010)the design involves two processes. The first thing is analyzing and designing components and structure on the basis of recognized codes and standards of safety. The other is that designers conduct the information in the form展开更多
文摘A polynomial model, time origin shifting model(TOSM, is used to describe the trajectory of a moving target .Based on TOSM, a recursive laeast squares(RLS) algorithm with varied forgetting factor is derived for tracking of a non-maneuvering target. In order to apply this algorithm to maneuvering targets tracking ,a tracking signal is performed on-line to determine what kind of TOSm will be in effect to track a target with different dynamics. An effective multiple model least squares filtering and forecasting method dadpted to real tracking of a maneuvering target is formulated. The algorithm is computationally more effcient than Kalman filter and the percentage improvement from simulations show both of them are considerably alike to some extent.
文摘Starting with the meanings of the terms “risk” and “uncertainty,””he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of “risk” and “uncertainty” interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective, and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.
文摘This article reports the discussion about the multiple relations between architectural design and "place" using two different approaches in order to characterize the interfaces of design challenges. The first is qualitative, highlighting the lack of dialogue between the standard-project architecture, the guidelines recommended by the COEDI (Coordenagao Geral de Educao Infantil (General Coordination of Early Childhood Education)) of the Ministry of Education, socio-technical and cultural-environmental context and pedagogy. The second, more quantitative, addresses the problems generated by dissociation between the constructive solutions and the bioclimatic demands of different insertion contexts of architectural design in the Brazilian Bioclimatic Zone 2. Initially planned to use a conventional building system, it was transposed to the Wall System, developed by MVC Componentes Pl^tsticos Ltda. The simulation evaluates and compares the level of thermal comfort of the building with two envelope systems. The study reports the analysis of the thermal comfort of a Type C unit, based on thermodynamic simulation, through the software Design Builder (version 4.2.0.054). The analysis of the building simulation results was based on the adaptive comfort model ASHRAE 55/2010. Later, three optimization measures of the thermal comfort level of the building were tested, based on thermal insulation and absorptance coverage, in addition to sun protection system design for the window frames. Preliminary results for the level of comfort of long permanence environments indicate a tow level of thermal comfort, the 50% in MVC system and around 60% in the conventional system, and also that the greater discomfort comes from the heat. Based on performance optimization measures of building, the MVC system reached 66.4% of thermal comfort compared to 62% in the conventional system. The results show the importance of adapting the standard project to the local climatic context.
文摘Hungary's accession to the European Union in 2004 marked the start of a new era. The completion of legal harmonization brought in new emission standards and thresholds, and this was followed by EU-assisted projects to build and reconstruct wastewater treatment plants. The utilization of sludge after it leaves the wastewater treatment plant is now a solely private-sector operation. There are new political priorities: increasing state involvement, buying out of major--formerly privatized--service providers, reintegration of isolated service providers, legally-imposed reduction of public utility charges. As a result, a demand has arisen for a greater central, i.e. government role in sludge utilization.
文摘Based on this evidence and many other examples, this paper advocates a drastic overhaul of the system, in which a distinction is made between simple, standard projects, less simple solutions that can be assessed with performance requirements, and high-value projects which are handled in accordance with the science of probabilistics. Next to or in addition to the Council of State, there has to be a technical body appointed under statute with non-departmental public body status, which can issue binding rulings in technical disputes, with very short procedural delays.
文摘The paper systemizes standard methods of planning, monitoring and controlling the realization of construction works in civil engineering projects and overviews the implementation of the methods in Team Co Cakovec from Croatia. The specificities of the methods are shown through the different construction works projects. Also, paper reviews the implementation, modification and improvement of existing methods for planning, monitoring and controlling the realization of projects in Team Co.
文摘This study theoretically showed the importance of standards economic growth to apply creative projects to avoid loss cost and efforts. There is problem of complexity environment to understand real economic growth. Companies and government can affect economic. There is a need to make standards to control steps of economic growth as result to accounting gaps, economic gaps, and financial analysis gaps. Standards must face negative affection of speculation, government involving in economic, developing tool. Evaluating must be built up to real market price and also standards must build trust to support developing. Searcher recommended linking economic growth with real growth of producing and ways to get real market price to evaluate company assets, liabilities, and net profit after tax for all users as factors show growth in company to growth economic units which are successful by applying creative projects.
文摘Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.
文摘This paper introduces the progress of State Grid Corporation of China (SGCC) in smart grid standardization, including the smart grid standards system, standards reversion and development, the role of standards system in smart grid demonstration projects, and the situation of SGCC participation in both domestic and international smart grid standardization work.
文摘Many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. At this time, there is no standard method to analyze a delay claim. This paper first introduced a fictional case study that has most types of delay and acceleration events that might be faced on a real project. The case study is applied to all current techniques of delay claims that have been identified from previous studies. The comparison uses the delay claim issues as criteria to evaluate all the delay claim techniques from the case study results. The case study result and discussion demonstrate that the Day-by-Day technique satisfies all the desired criteria while other techniques lack some.
文摘The electromagnetic compatibility of electric vehicles is not only the important technology issue in researches,development and industrialization of electric vehicles,but also the key research area of ISO.In this paper,both national and international standards of electromagnetic compatibility of electric vehicles are analyzed;it is also suggested that our standards of electromagnetic compatibility of electric vehicles be improved from several aspects such as testing items,test procedures,limit value,etc.The electromagnetic environment of electric vehicles is analyzed in terms of interfering sources,providing the solutions to electromagnetic compatibility and measures of reducing electromagnetic interference.Advanced equipments introduced into Chinese electromagnetic compatibility testing laboratories accelerate the pace of the researches on related technologies and standards;China will develop the standards system which covers from the complete electric vehicle to the key components,promote the technology improvement and industrialization work of Chinese electric vehicles,transform the latest achievements and advanced experiences of Chinese electric vehicles industry to the related standards and contribute the development of international standards.
文摘After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.
文摘In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.
文摘There are several software estimation models such as Line of Code, Function Point and COnstructive COst MOdel (COCOMO). The original COCOMO model is one of the most widely practiced and popular among the software development community because of its flexible usage. It is a suite of models i.e., COnstructive Cost MOdel I and COnstructive Cost MOdel II. in this paper, we are evaluating the both models, to find out the level of efficiency they present and how they can be tailored to the needs of modem software development projects. We are applying COCOMO models on a case study of an e-commerce application that is built using Hyper Text Markup Language (HTML) and JavaScript. We will also shed light on the different components of each model, and how their Cost Drivers effect on the accuracy of cost estimations for software development projects.
文摘Successful and cost-effective construction relies upon appropriate communication of the participants of the construction project. Hence, it is important to define the rights and responsibilities of the parties, and relationships among them. In this context, well-designed and complete agreement is essential and necessary for the successfully completion of a construction project within the desired time, quality and budget. In this paper, it is aimed to analyze and compare the owner-contractor agreements in the Turkish and the US construction industry. First, the importance of construction contracts and contractual elements of an agreement is determined, and then, the standard owner-contractor agreement which is used in the Turkish construction industry is analyzed and compared with the US standard owner-contractor agreement. Finally, the differences between these agreements are put forward, the lack and deficiencies of Turkish standard agreement form are determined, and appropriate suggestions are improved.
文摘Using modern project managementprinciples,this paper analyzes the current state ofmarine research project management in China.Itexplains the function and significance of standardizedproject management,and then puts forwardstrategies for the implementation of standardizationof marine project management.This is done to improvemarine research project management inChina,better the level of scientific research intooceans and promote the development of marinescience and technology in China.
文摘In this thesis, the design in construction management is defined as the design meets the requirements of the constructor. There are a range of definitions of design, but in this paper "design" refers to something, which has been planned and made and a pattern for decorating in something in the term of construction. Rumane says (2010)the design involves two processes. The first thing is analyzing and designing components and structure on the basis of recognized codes and standards of safety. The other is that designers conduct the information in the form