期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
英国原子能管理局加快核场区退役速度
1
作者 伍浩松 《国外核新闻》 2004年第7期31-31,共1页
关键词 英国原子能管理 场区退役 英国燃料公司 设施退役管理
下载PDF
PSA发展现状及其应用 被引量:4
2
作者 薛大知 梅启智 奚树人 《核科学与工程》 CSCD 北大核心 1996年第3期235-242,共8页
介绍了国际上概率安全分析发展的概况。文中也引述了EPRI基于大量PSA的实践所作的专题调查报告的结论,即PSA的主要应用方面和获得成功的重要条件。详细介绍了PSA当前重要应用的两个方面:以风险为基础对技术规格书的修订... 介绍了国际上概率安全分析发展的概况。文中也引述了EPRI基于大量PSA的实践所作的专题调查报告的结论,即PSA的主要应用方面和获得成功的重要条件。详细介绍了PSA当前重要应用的两个方面:以风险为基础对技术规格书的修订和用于电站日常运行、维修和管理的风险管理系统。 展开更多
关键词 概率安全分析 风险管理 反应堆安全 核设施管理 反应堆运行
下载PDF
Impact of Workforce and Schedule Constraints on New Nuclear Construction
3
作者 Kevin Taaffe Innocent Nkwocha +2 位作者 Forest Denger Vikram Thouta Terrence Brimfield 《Journal of Mathematics and System Science》 2014年第5期338-350,共13页
Due to recent legislative incentives and a general change in the public eye towards environmental and energy issues, a renewed interest in building nuclear power plants has taken place in the U.S. The Nuclear Regulato... Due to recent legislative incentives and a general change in the public eye towards environmental and energy issues, a renewed interest in building nuclear power plants has taken place in the U.S. The Nuclear Regulatory Commission has also recently given approvals to build four nuclear reactors in two southeast states, which further indicates the resurging interest in nuclear power in the U.S. Such approvals, however, do not specifically address the impact on having a constrained labor force when manufacturing and constructing multiple reactors. Key findings include the comparison of a constrained and unconstrained workforce on construction and manufacturing completion times, the identification of peak labor requirements based on different construction schedules, and the development of training estimates to ensure the workforce and industry are prepared for the new jobs being created. Results suggest that a shorter planned construction timeline is effective when the workforce is moderately constrained to unconstrained. However, with a severely-constrained starting workforce, a longer construction timeline is preferred. For multiple reactor plans, spreading out the construction start dates outperforms all other construction start date schedules. In particular, heavily compressed start dates could effectively kill a resurgent nuclear industry, especially if workforce expansion is not pursued simultaneously. 展开更多
关键词 Nuclear construction system dynamics workforce management
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部