期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
论预应力混凝土梁板拱度对桥面标高影响及解决方法 被引量:1
1
作者 张中跃 《上海公路》 2000年第1期31-32,共2页
本文对沪杭高速公路施工监理工程中,通过梁板的预制和桥面标高的具体监测过程,提出观点。从而能在今后的设计和施工中作为参考因素。
关键词 预应力混凝土 梁板拱度 桥面 标高 影响 解决方法 拱度
下载PDF
Improved methods for decreasing stresses of concrete slab of large-span through tied-arch composite bridge 被引量:2
2
作者 周德 叶梅新 罗如登 《Journal of Central South University》 SCIE EI CAS 2010年第3期648-652,共5页
Mechanical behavior of concrete slab of large-span through tied-arch composite bridge was investigated by finite element analysis (FEA). Improved methods to decrease concrete stresses were discussed based on compariso... Mechanical behavior of concrete slab of large-span through tied-arch composite bridge was investigated by finite element analysis (FEA). Improved methods to decrease concrete stresses were discussed based on comparisons of different deck schemes, construction sequences and measures, and ratios of reinforcement. The results show that the mechanical behavior of concrete slab gets worse with the increase of composite regions between steel beams and concrete slab. The deck scheme with the minimum composite region is recommended on condition that both strength and stiffness of the bridge meet design demands under service loads. Adopting in-situ-place construction method, concrete is suggested to be cast after removing the full-supported frameworks under the bridge. Thus, the axial tensile force of concrete slab caused by the first stage dead load is eliminated. Preloading the bridge before concrete casting and removing the load after the concrete reaching its design strength, the stresses of concrete slab caused by the second stage dead load and live load are further reduced or even eliminated. At last, with a high ratio of reinforcement more than 3%, the concrete stresses decrease obviously. 展开更多
关键词 composite bridge concrete slab tension through tied-arch large span finite element method
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部