The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small river...The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small rivers and was designed principally with the environment in mind. The bridge length is over 356 m, and the width of the decks is 11.5 m. For the bridge works, a simple conventional falsework system was chosen with steel frames for the supports and steel rolled beams for the decks. The formwork was constructed in solid timber and plywood as multiple-use panels. The falsework was designed in order to build the two 10-span bridge decks in stages. The decks are continuous cast-in-situ prestressed concrete twin rib with spans of 30 m, 34 m and 45 m. An individual falsework system was designed, which was easy to move transversally following completion of each stage for one deck. After finishing each stage, for the second deck, the falsework was dismantled and used again in the next construction fronts. An individual arrangement for the falsework along with timber pilings was used to cross the biggest river. The formwork timber panels were used several times in the multistage bridge construction. The adopted falsework system is very simple, but it allowed the speedy construction of the two decks where there were severe time constraints.展开更多
A new full time-domain nonlinear coupled method has been established and then applied to predict the responses of a Truss Spar in irregular wave. For the coupled analysis, a second-order time-domain approach is develo...A new full time-domain nonlinear coupled method has been established and then applied to predict the responses of a Truss Spar in irregular wave. For the coupled analysis, a second-order time-domain approach is developed to calculate the wave forces, and a finite element model based on rod theory is established in three dimensions in a global coordinate system. In nu- merical implementation, the higher-order boundary element method (HOBEM) is employed to solve the velocity potential, and the 4th-order Adams-Bashforth-Moultn scheme is used to update the second-order wave surface. In deriving convergent solu- tions, the hull displacements and mooring tensions are kept consistent at the fairlead and the motion equations of platform and mooring-lines/risers are solved simultaneously using Newmark-fl integration scheme including Newton-Raphson iteration. Both the coupled quasi-static analysis and the coupled dynamic analysis are performed. The numerical simulation results are also compared with the model test results, and they coincide very well as a whole. The slow-drift responses can be clearly ob- served in the time histories of displacements and mooring tensions. Some important characteristics of the coupled responses are concluded.展开更多
文摘The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small rivers and was designed principally with the environment in mind. The bridge length is over 356 m, and the width of the decks is 11.5 m. For the bridge works, a simple conventional falsework system was chosen with steel frames for the supports and steel rolled beams for the decks. The formwork was constructed in solid timber and plywood as multiple-use panels. The falsework was designed in order to build the two 10-span bridge decks in stages. The decks are continuous cast-in-situ prestressed concrete twin rib with spans of 30 m, 34 m and 45 m. An individual falsework system was designed, which was easy to move transversally following completion of each stage for one deck. After finishing each stage, for the second deck, the falsework was dismantled and used again in the next construction fronts. An individual arrangement for the falsework along with timber pilings was used to cross the biggest river. The formwork timber panels were used several times in the multistage bridge construction. The adopted falsework system is very simple, but it allowed the speedy construction of the two decks where there were severe time constraints.
基金supported by the National High Technology Research and Development Program of China(Grant No.2006AA09A109-3)the Important National Science&Technology Specific Projects(Grant No.2008ZX05026-06-02)
文摘A new full time-domain nonlinear coupled method has been established and then applied to predict the responses of a Truss Spar in irregular wave. For the coupled analysis, a second-order time-domain approach is developed to calculate the wave forces, and a finite element model based on rod theory is established in three dimensions in a global coordinate system. In nu- merical implementation, the higher-order boundary element method (HOBEM) is employed to solve the velocity potential, and the 4th-order Adams-Bashforth-Moultn scheme is used to update the second-order wave surface. In deriving convergent solu- tions, the hull displacements and mooring tensions are kept consistent at the fairlead and the motion equations of platform and mooring-lines/risers are solved simultaneously using Newmark-fl integration scheme including Newton-Raphson iteration. Both the coupled quasi-static analysis and the coupled dynamic analysis are performed. The numerical simulation results are also compared with the model test results, and they coincide very well as a whole. The slow-drift responses can be clearly ob- served in the time histories of displacements and mooring tensions. Some important characteristics of the coupled responses are concluded.