期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
超大跨度无砟轨道混凝土连续刚构铁路桥梁部施工及变形控制技术研究 被引量:1
1
作者 黄铁 《工程建设与设计》 2024年第10期161-163,共3页
结合106 m+198 m+106 m连续刚构桥,介绍了0#节段的主要施工流程和施工方法,以及悬臂挂篮施工技术,在施工中采取数字化的线性监控和严格的施工控制措施,保证连续梁施工尽量符合梁部高性能混凝土的徐变值,使后期梁部及混凝土变形尽量接近... 结合106 m+198 m+106 m连续刚构桥,介绍了0#节段的主要施工流程和施工方法,以及悬臂挂篮施工技术,在施工中采取数字化的线性监控和严格的施工控制措施,保证连续梁施工尽量符合梁部高性能混凝土的徐变值,使后期梁部及混凝土变形尽量接近设计值。 展开更多
关键词 超大跨度 连续刚构桥 梁部施工技术 变形控制措施
下载PDF
Construction and control technology of the main bridge superstructure of Sutong Bridge
2
作者 Zhang Hong Luo Chenbin +1 位作者 Zhang Yongtao You Xinpeng 《Engineering Sciences》 EI 2009年第1期76-82,共7页
The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of ... The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of the big block girders for the side span,assistant span and tower area,erection of standard girders and closure of the middle span.The big block girders were hoisted by a floating crane,and the standard girders were hoisted by a double crane system on the deck.The pushing assistant method was adopted for the middle span closure construction.Furthermore,key technologies and innovative methods used in the processes of girder erection and cable assemblage in all stages were expatiated systematically.An all-stage self-adaptive geometry control method was used in the construction process.By accurately controlling the unstressed dimensions and shape of all structural components in each step,and realization that the control system and the controlled system adapt to each other,the goal was to make control of the final line shape and inner force of the bridge structure achievable.Two solutions,including GPS based and total station based dynamic geometry monitoring systems,were used to resolve the measure problem under the wide-range of wind-induced vibrations in the long cantilever state.Finally,research on the wind-induced vibration of the superstructure during the construction period was executed.Buffeting response analysis to the longest single and double cantilever states were carried out.The analysis and evaluation of wind resistance safety of the main girders under the longest single cantilever state was made,and corresponding wind resistance measures were suggested.The as-built geometric error and cable force error were controlled in a required design range,and this whole technological achievement can be a benchmark for construction of other large span cable-stayed bridges in the future. 展开更多
关键词 Sutong Bridge SUPERSTRUCTURE construction method construction control geometry control wind-resistant measure
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部