One-dimensional pseudo-homogeneous model of an axial flow converter and one-dimensional heteroge-neous model of a horizontal converter have been presented, which describe the distribution of gaseous composition,temper...One-dimensional pseudo-homogeneous model of an axial flow converter and one-dimensional heteroge-neous model of a horizontal converter have been presented, which describe the distribution of gaseous composition,temperature and pressure along the height in the two converters, respectively. Design optimization methods of the two converters have been proposed, by which the minimum catalyst volume can be obtained to satisfy the productive capacity of 1000 tons per day, when the operating pressure is 15.0, 10.0 and 7.5 MPa, respectively.展开更多
By taking a 2.3 MW double-fed asynchronous generator as an example,a new method for fast simulation analysis of ventilation cooling system inside generator is proposed based on the one-dimensional simulation software ...By taking a 2.3 MW double-fed asynchronous generator as an example,a new method for fast simulation analysis of ventilation cooling system inside generator is proposed based on the one-dimensional simulation software FLOWMASTER.The thermal-fluid coupling simulation model of ventilation cooling system inside generator is established.Under the stable running state of the generator,the flow velocity distribution and temperature rise of the key parts of the generator are analyzed.The results prove that the ventilation structure design of the generator meets the temperature rise limit.The simulation results are compared with the theoretical calculation results and the experimental results,which verify the correctness of the thermal-fluid coupling simulation method proposed in this paper.展开更多
文摘One-dimensional pseudo-homogeneous model of an axial flow converter and one-dimensional heteroge-neous model of a horizontal converter have been presented, which describe the distribution of gaseous composition,temperature and pressure along the height in the two converters, respectively. Design optimization methods of the two converters have been proposed, by which the minimum catalyst volume can be obtained to satisfy the productive capacity of 1000 tons per day, when the operating pressure is 15.0, 10.0 and 7.5 MPa, respectively.
文摘By taking a 2.3 MW double-fed asynchronous generator as an example,a new method for fast simulation analysis of ventilation cooling system inside generator is proposed based on the one-dimensional simulation software FLOWMASTER.The thermal-fluid coupling simulation model of ventilation cooling system inside generator is established.Under the stable running state of the generator,the flow velocity distribution and temperature rise of the key parts of the generator are analyzed.The results prove that the ventilation structure design of the generator meets the temperature rise limit.The simulation results are compared with the theoretical calculation results and the experimental results,which verify the correctness of the thermal-fluid coupling simulation method proposed in this paper.