A hydrological simulation in the Huaihe River Basin(HRB) was investigated using two different models: a coupled land surface hydrological model(CLHMS), and a large-scale hydrological model(LSX-HMS). The NCEP-NCAR rean...A hydrological simulation in the Huaihe River Basin(HRB) was investigated using two different models: a coupled land surface hydrological model(CLHMS), and a large-scale hydrological model(LSX-HMS). The NCEP-NCAR reanalysis dataset and observed precipitation data were used as meteorological inputs. The simulation results from both models were compared in terms of flood processes forecasting during high flow periods in the summers of 2003 and 2007, and partial high flow periods in 2000. The comparison results showed that the simulated streamflow by CLHMS model agreed well with the observations with Nash-Sutcliffe coefficients larger than 0.76, in both periods of 2000 at Lutaizi and Bengbu stations in the HRB, while the skill of the LSX-HMS model was relatively poor. The simulation results for the high flow periods in 2003 and 2007 suggested that the CLHMS model can simulate both the peak time and intensity of the hydrological processes, while the LSX-HMS model provides a delayed flood peak. These results demonstrated the importance of considering the coupling between the land surface and hydrological module in achieving better predictions for hydrological processes, and CLHMS was proven to be a promising model for future applications in flood simulation and forecasting.展开更多
A numerical model to simulate the bed degradation process in a straight alluvial channel with respect to time and distance is introduced. The simulation takes into account the effect of non uniformity of the bed ma...A numerical model to simulate the bed degradation process in a straight alluvial channel with respect to time and distance is introduced. The simulation takes into account the effect of non uniformity of the bed material, and variations in the dimension of bed forms. The model predicts the changes in the grain size distribution with the time and space during degradation process. The numerical model proposes that the armoring process in degrading channels does not depend only on hydraulic characteristics of the flow but also on variation in the grain size distribution of sediments on the bed. The model was applied and compared with the results obtained from experiments conducted in 24 m recirculating flume for two sizes of sand; a good agreement was found between observed and calculated values.展开更多
To study the relationship between sediment transportation and saltwater intrusion in the Changjiang (Yangtze) estuary, a three-dimensional numerical model for temperature, salinity, velocity field, and suspended sedim...To study the relationship between sediment transportation and saltwater intrusion in the Changjiang (Yangtze) estuary, a three-dimensional numerical model for temperature, salinity, velocity field, and suspended sediment concentration was established based on the ECOMSED model. Using this model, sediment transportation in the flood season of 2005 was simulated for the Changjiang estuary. A comparison between simulated results and observation data for the tidal level, flow velocity and direction, salinity and suspended sediment concentration indicated that they were consistent in overall. Based on model verification, the simulation of saltwater intrusion and its effect on sediment in the Changjiang estuary was analyzed in detail. The saltwater intrusion in the estuary including the formation, evolution, and disappearance of saltwater wedge and the induced vertical circulation were reproduced, and the crucial impact of the wedge on cohesive and non-cohesive suspended sediment distribution and transportation were successfully simulated. The result shows that near the salinity front, the simulated concentrations of both cohesive and non-cohesive suspended sediment at the surface layer had a strong relationship with the simulated velocity, especially when considering a 1-hour lag. However, in the bottom layer, there was no obvious correlation between them, because the saltwater wedge and its inducing vertical circulation may have resuspended loose sediment on the bed, thus forming a high-concentration area near the bottom even if the velocity near the bottom was very low during the transition phase from flood to ebb.展开更多
The Inohana Lake is a branch lake of the Hamana Lake. The Inohana Lake is an estuary rather than a brackish lake, and has suffered environmental problems such as eutrophication and bottom hypoxic water. In this study,...The Inohana Lake is a branch lake of the Hamana Lake. The Inohana Lake is an estuary rather than a brackish lake, and has suffered environmental problems such as eutrophication and bottom hypoxic water. In this study, the coupled hydrodynamic and ecological models (eco-hydrodynamic model) were used to construct the strategy for preventing the bottom hypoxic water and improving or recovering the water quality in the lake. Using the model input obtained from the summertime data over 1998-2002, the summer-average flow field and oxygen concentration and budget of the standard run were calculated. Remedial measures used in this study are divided into two parts: the biogeochemical and physical changes in the present situation. For the remedial measures including the biogeochemical changes in the present situation, the simulations considering the reductions of the nutrient inputs from the river, main lake (land) and bottom sediment, and the sediment oxygen demand (SOD) were carried out. For the remedial measures including the physical changes, the 50 and 100 m extensions of the inlet width were considered in the model runs. These simulated results were compared in terms of changes in the dissolved oxygen (DO) concentration and oxygen budget in the bottom layer in the Inohana Lake. There was no significant change in the DO concentration and oxygen stock in the simulations for the reduction of the nutrient inputs from the land and bottom sediment, however increases in those in the simulations for the reduction of SOD. When SOD was reduced by 50%, the bottom DO concentration increased by approximately 2 mg/L and the oxygen stock in the bottom layer increased by 47% comparing the present situation (the standard run) of the lake. The simulation results for inlet width extension showed that the extension of width makes the DO concentration and oxygen stock lower. The remedial measures for the sediment control were proposed to prevent the bottom hypoxia and manage the water quality.展开更多
Whether mining activity results in reduced flow of surface water in the Peace River Watershed of Florida has been the subject of much debate. With increased dependence of downstream users on surface water flow of the ...Whether mining activity results in reduced flow of surface water in the Peace River Watershed of Florida has been the subject of much debate. With increased dependence of downstream users on surface water flow of the Peace River as a source of drinking water for four coastal counties in Southwest Florida and problems of water security, the debate has been intensified. It is possible to assess relationships of mining with streamflow in the upper reaches of the Peace River Basin using hydrologic modeling and identify mined sub-basins. In this work, land-use change impacts were simulated by the Hydrological Simulation Program--Fortran (HSPF) model based on geographical information system (GIS) tools, to compare pre- and post-mining streamflows at a study site of the Peace River in west-central Florida. The purpose of this study was to determine if land-use changes caused by mining have negatively impacted streamflow in the Peace River. Changes of land use were identified before and after mining activities. A coupled volume-water depth-discharge (V-h-Q) model based on stage/storage and stage/discharge was applied using HSPF for the pre-mining and post-mining models, respectively. Daily simulated post-mining hydrographs from HSPF were plotted with the calibrated pre-mining results and streamflow hydrographs from the 18 gauging stations, to compare timing of peaks, low fows and flow trends. Analyses of percent ex- ceedances of flow frequency curves of the streams indicated that most streams had similar distributions for mined (reclaimed) and pre- mining periods. In the streamflow change analysis, streamflows actually increased in mining-affected basins at nearly half the stations. Streamflows at other stations diminished. Overall from this comprehensive study, there were declines in streamflow at most gauging stations on the mainstem of the Peace River and its tributaries. The results of this study suggest that regional planning is urgently needed to propose reclamation schemes that enhance regional hydrology.展开更多
Along with economic development, river pollution has become a serious phenomenon. It's rational to simulate variation of pollutants by using water quality model. Thus, relevant departments could take appropriate meas...Along with economic development, river pollution has become a serious phenomenon. It's rational to simulate variation of pollutants by using water quality model. Thus, relevant departments could take appropriate measures to improve the water environment. However, the traditional image of mathematical modeling is not intuitive. The advantage of WebGIS is the ability of visualization on web browser by the combination ofgeospatial data and pollution attribute data.展开更多
Abundant solid materials were formed as a result of landslide and collapse due to Wenchuan earthquake.The solid source around mountains would form a debris flow when appropriate rain condition occurs.Such a debris flo...Abundant solid materials were formed as a result of landslide and collapse due to Wenchuan earthquake.The solid source around mountains would form a debris flow when appropriate rain condition occurs.Such a debris flow is structurally very large and strong,and the river flow can hardly wash away the deposit when the debris flow enters into the mainstream.As a result,the deposit on the river bed due to debris flow will cause a series of hazards.Based on the previous researches and relevant data,this paper simplified the interaction between debris flow and current of the main river,and adopted the finite element characteristic-based-split algorithm which is favorable to the stabilization of dealing with the convection.Finally,the numerical model of the confluence of debris flow deposit and main river was developed,and the deposit progress of the mega-debris flow from Wenjiagou in Mianyuan river was reproduced.Furthermore,the influence of the deposit on the flow route of the main river,and distribution of velocity and water depth were analyzed.The results showed that the simulation deposit terrain qualitatively agreed with the field data through comparison,including the deposit area and depth distribution.Furthermore,the improvement of the model in future was discussed.展开更多
Modeling the hydrological processes at catchment scale requires a flexible distributed scheme to represent the catchment to- pography, river network and vegetation pattern. This study has developed a distributed schem...Modeling the hydrological processes at catchment scale requires a flexible distributed scheme to represent the catchment to- pography, river network and vegetation pattern. This study has developed a distributed scheme for eco-hydrological simulation in the upper Heihe River. Based on a 1 km x 1 km grid system, the study catchment is divided into 461 sub-catchments, whose main streams form the streamflow pathway. Furthermore, a 1 km grid is represented by a number of topographically similar "hillslope-valley" systems, and the hillslope is the basic unit of the eco-hydrological simulation. This model is tested with a simplified hydrological simulation focusing on soil-water dynamics and streamflow routing. Based on a 12-year simulation from 2001 to 2012, it is found that variability in hydrological behavior is closely associated with climatic and landscape condi- tions especially vegetation types. The subsurface and groundwater flows dominate the total river runoff. This implies that the soil freezing and thawing process would significantly influence the runoff generation in the upper Heihe basin. Furthermore, the runoff components and water balance characteristics vary among different vegetation types, showing the importance of coupling the vegetation pattern into catchment hydrological simulation. This paper also discusses the model improvement to be done in future study.展开更多
Water table over an arid region can be elevated to a critical level to sustain terrestrial ecosystem along the natural channel by the stream water conveyance. Estimation of water table depth and soil moisture on river...Water table over an arid region can be elevated to a critical level to sustain terrestrial ecosystem along the natural channel by the stream water conveyance. Estimation of water table depth and soil moisture on river channel profile may be reduced to a two-dimensional moving boundary problem with soil water-groundwater interaction. The two-dimensional soil water flow with stream water transferred is divided into an unsaturated vertical soil water flow and a horizontal groundwater flow. Therefore, a prediction model scheme for water table depths under the interaction between soil water and groundwater with stream water transferred is presented, which includes a vertical soil water movement model, a horizontal groundwater movement model, and an interface model. The synthetic experiments are conducted to test the sensitivities of the river elevation, horizontal conductivity, and surface flux, and the results from the experiments show the robustness of the proposed scheme under different conditions. The groundwater horizontal conductivity of the proposed scheme is also calibrated by SCE-UA method and validated by data collected at the Yingsu section in the lower reaches of the Tarim River, which shows that the model can reasonably simulate the water table depths.展开更多
In order to expand the application range of the classic Topographic Index model(TOPMODEL) and develop a more appropriate submodel of hydrological processes for use in the land surface model, two types of TOPMODEL are ...In order to expand the application range of the classic Topographic Index model(TOPMODEL) and develop a more appropriate submodel of hydrological processes for use in the land surface model, two types of TOPMODEL are investigated, one with saturated hydraulic conductivity change with depth obeying exponential law(classical e-TOPMODEL or e-TOPMODEL for short) and the other obeying general power law(general p-TOPMODEL or p-TOPMODEL for short). Using observation date in the Suomo River catchment located in the upper reaches of the Yangtze River, the sensitivity study of the p-TOPMODEL was conducted and the simulated results from the model were examined and evaluated first, and then the results were compared with the results from the e-TOPMODEL to find the similarities and differences between the two types of models. The main conclusions obtained from the above studies are(1) topographic index and its distribution derived from the p-TOPPMODEL for the Suomo Basin are sensitive to changes of parameter n and m;(2) changes of n and m have impacts on the simulation results of various hydrological components(such as daily runoff, monthly averaged runoff, monthly averaged surface runoff and subsurface runoff), but have the weaker impacts on forty-year averaged total runoff; and(3) for the same value of m, the simulated results of e-TOPMODEL display higher surface runoff and lower subsurface runoff than the general p-TOPMODEL does but multi-year averaged total runoffs produced from the two types of TOPMODEL show insignificant difference. The differences between the two types of models indicate that it is necessary to pay close attention to correct selection from different hydrological models for use in land surface model development. The result mentioned above is useful to provide some referential information for the model selection.展开更多
基金supported by the Strategic Priority Research Program of the Chinese Academy of Sciences (Grant No. XDA05110202)the National Natural Science Foundation of China (Grant Nos. 41175073, 41471016, and U1133603)
文摘A hydrological simulation in the Huaihe River Basin(HRB) was investigated using two different models: a coupled land surface hydrological model(CLHMS), and a large-scale hydrological model(LSX-HMS). The NCEP-NCAR reanalysis dataset and observed precipitation data were used as meteorological inputs. The simulation results from both models were compared in terms of flood processes forecasting during high flow periods in the summers of 2003 and 2007, and partial high flow periods in 2000. The comparison results showed that the simulated streamflow by CLHMS model agreed well with the observations with Nash-Sutcliffe coefficients larger than 0.76, in both periods of 2000 at Lutaizi and Bengbu stations in the HRB, while the skill of the LSX-HMS model was relatively poor. The simulation results for the high flow periods in 2003 and 2007 suggested that the CLHMS model can simulate both the peak time and intensity of the hydrological processes, while the LSX-HMS model provides a delayed flood peak. These results demonstrated the importance of considering the coupling between the land surface and hydrological module in achieving better predictions for hydrological processes, and CLHMS was proven to be a promising model for future applications in flood simulation and forecasting.
文摘A numerical model to simulate the bed degradation process in a straight alluvial channel with respect to time and distance is introduced. The simulation takes into account the effect of non uniformity of the bed material, and variations in the dimension of bed forms. The model predicts the changes in the grain size distribution with the time and space during degradation process. The numerical model proposes that the armoring process in degrading channels does not depend only on hydraulic characteristics of the flow but also on variation in the grain size distribution of sediments on the bed. The model was applied and compared with the results obtained from experiments conducted in 24 m recirculating flume for two sizes of sand; a good agreement was found between observed and calculated values.
基金Supported by the National Natural Science Foundation of China (No. 40406025)the National High Technology Research and Development Program of China (863 Program) (No. 2006AA09Z157)
文摘To study the relationship between sediment transportation and saltwater intrusion in the Changjiang (Yangtze) estuary, a three-dimensional numerical model for temperature, salinity, velocity field, and suspended sediment concentration was established based on the ECOMSED model. Using this model, sediment transportation in the flood season of 2005 was simulated for the Changjiang estuary. A comparison between simulated results and observation data for the tidal level, flow velocity and direction, salinity and suspended sediment concentration indicated that they were consistent in overall. Based on model verification, the simulation of saltwater intrusion and its effect on sediment in the Changjiang estuary was analyzed in detail. The saltwater intrusion in the estuary including the formation, evolution, and disappearance of saltwater wedge and the induced vertical circulation were reproduced, and the crucial impact of the wedge on cohesive and non-cohesive suspended sediment distribution and transportation were successfully simulated. The result shows that near the salinity front, the simulated concentrations of both cohesive and non-cohesive suspended sediment at the surface layer had a strong relationship with the simulated velocity, especially when considering a 1-hour lag. However, in the bottom layer, there was no obvious correlation between them, because the saltwater wedge and its inducing vertical circulation may have resuspended loose sediment on the bed, thus forming a high-concentration area near the bottom even if the velocity near the bottom was very low during the transition phase from flood to ebb.
文摘The Inohana Lake is a branch lake of the Hamana Lake. The Inohana Lake is an estuary rather than a brackish lake, and has suffered environmental problems such as eutrophication and bottom hypoxic water. In this study, the coupled hydrodynamic and ecological models (eco-hydrodynamic model) were used to construct the strategy for preventing the bottom hypoxic water and improving or recovering the water quality in the lake. Using the model input obtained from the summertime data over 1998-2002, the summer-average flow field and oxygen concentration and budget of the standard run were calculated. Remedial measures used in this study are divided into two parts: the biogeochemical and physical changes in the present situation. For the remedial measures including the biogeochemical changes in the present situation, the simulations considering the reductions of the nutrient inputs from the river, main lake (land) and bottom sediment, and the sediment oxygen demand (SOD) were carried out. For the remedial measures including the physical changes, the 50 and 100 m extensions of the inlet width were considered in the model runs. These simulated results were compared in terms of changes in the dissolved oxygen (DO) concentration and oxygen budget in the bottom layer in the Inohana Lake. There was no significant change in the DO concentration and oxygen stock in the simulations for the reduction of the nutrient inputs from the land and bottom sediment, however increases in those in the simulations for the reduction of SOD. When SOD was reduced by 50%, the bottom DO concentration increased by approximately 2 mg/L and the oxygen stock in the bottom layer increased by 47% comparing the present situation (the standard run) of the lake. The simulation results for inlet width extension showed that the extension of width makes the DO concentration and oxygen stock lower. The remedial measures for the sediment control were proposed to prevent the bottom hypoxia and manage the water quality.
基金National Natural Science Foundation of China(No.41271004)Beijing Municipal Science &Technology New Star Project Funds(No.2010B046)
文摘Whether mining activity results in reduced flow of surface water in the Peace River Watershed of Florida has been the subject of much debate. With increased dependence of downstream users on surface water flow of the Peace River as a source of drinking water for four coastal counties in Southwest Florida and problems of water security, the debate has been intensified. It is possible to assess relationships of mining with streamflow in the upper reaches of the Peace River Basin using hydrologic modeling and identify mined sub-basins. In this work, land-use change impacts were simulated by the Hydrological Simulation Program--Fortran (HSPF) model based on geographical information system (GIS) tools, to compare pre- and post-mining streamflows at a study site of the Peace River in west-central Florida. The purpose of this study was to determine if land-use changes caused by mining have negatively impacted streamflow in the Peace River. Changes of land use were identified before and after mining activities. A coupled volume-water depth-discharge (V-h-Q) model based on stage/storage and stage/discharge was applied using HSPF for the pre-mining and post-mining models, respectively. Daily simulated post-mining hydrographs from HSPF were plotted with the calibrated pre-mining results and streamflow hydrographs from the 18 gauging stations, to compare timing of peaks, low fows and flow trends. Analyses of percent ex- ceedances of flow frequency curves of the streams indicated that most streams had similar distributions for mined (reclaimed) and pre- mining periods. In the streamflow change analysis, streamflows actually increased in mining-affected basins at nearly half the stations. Streamflows at other stations diminished. Overall from this comprehensive study, there were declines in streamflow at most gauging stations on the mainstem of the Peace River and its tributaries. The results of this study suggest that regional planning is urgently needed to propose reclamation schemes that enhance regional hydrology.
文摘Along with economic development, river pollution has become a serious phenomenon. It's rational to simulate variation of pollutants by using water quality model. Thus, relevant departments could take appropriate measures to improve the water environment. However, the traditional image of mathematical modeling is not intuitive. The advantage of WebGIS is the ability of visualization on web browser by the combination ofgeospatial data and pollution attribute data.
基金supported by the National Basic Research Program of China ("973" Project) (Grant No. 2011CB409903)the National Natural Science Foundation of China (Grant No. 50739002)
文摘Abundant solid materials were formed as a result of landslide and collapse due to Wenchuan earthquake.The solid source around mountains would form a debris flow when appropriate rain condition occurs.Such a debris flow is structurally very large and strong,and the river flow can hardly wash away the deposit when the debris flow enters into the mainstream.As a result,the deposit on the river bed due to debris flow will cause a series of hazards.Based on the previous researches and relevant data,this paper simplified the interaction between debris flow and current of the main river,and adopted the finite element characteristic-based-split algorithm which is favorable to the stabilization of dealing with the convection.Finally,the numerical model of the confluence of debris flow deposit and main river was developed,and the deposit progress of the mega-debris flow from Wenjiagou in Mianyuan river was reproduced.Furthermore,the influence of the deposit on the flow route of the main river,and distribution of velocity and water depth were analyzed.The results showed that the simulation deposit terrain qualitatively agreed with the field data through comparison,including the deposit area and depth distribution.Furthermore,the improvement of the model in future was discussed.
基金supported by the National Natural Science Foundation of China(Grant No.91225302)
文摘Modeling the hydrological processes at catchment scale requires a flexible distributed scheme to represent the catchment to- pography, river network and vegetation pattern. This study has developed a distributed scheme for eco-hydrological simulation in the upper Heihe River. Based on a 1 km x 1 km grid system, the study catchment is divided into 461 sub-catchments, whose main streams form the streamflow pathway. Furthermore, a 1 km grid is represented by a number of topographically similar "hillslope-valley" systems, and the hillslope is the basic unit of the eco-hydrological simulation. This model is tested with a simplified hydrological simulation focusing on soil-water dynamics and streamflow routing. Based on a 12-year simulation from 2001 to 2012, it is found that variability in hydrological behavior is closely associated with climatic and landscape condi- tions especially vegetation types. The subsurface and groundwater flows dominate the total river runoff. This implies that the soil freezing and thawing process would significantly influence the runoff generation in the upper Heihe basin. Furthermore, the runoff components and water balance characteristics vary among different vegetation types, showing the importance of coupling the vegetation pattern into catchment hydrological simulation. This paper also discusses the model improvement to be done in future study.
基金supported by National Basic Research Program (Grant Nos. 2010CB428403, 2010CB951001)Chinese COPES Project (Grant No. GYHY200706005)National High Technology Research and Development Program of China (Grant No. 2009AA12Z129)
文摘Water table over an arid region can be elevated to a critical level to sustain terrestrial ecosystem along the natural channel by the stream water conveyance. Estimation of water table depth and soil moisture on river channel profile may be reduced to a two-dimensional moving boundary problem with soil water-groundwater interaction. The two-dimensional soil water flow with stream water transferred is divided into an unsaturated vertical soil water flow and a horizontal groundwater flow. Therefore, a prediction model scheme for water table depths under the interaction between soil water and groundwater with stream water transferred is presented, which includes a vertical soil water movement model, a horizontal groundwater movement model, and an interface model. The synthetic experiments are conducted to test the sensitivities of the river elevation, horizontal conductivity, and surface flux, and the results from the experiments show the robustness of the proposed scheme under different conditions. The groundwater horizontal conductivity of the proposed scheme is also calibrated by SCE-UA method and validated by data collected at the Yingsu section in the lower reaches of the Tarim River, which shows that the model can reasonably simulate the water table depths.
基金supported by the National Natural Science Foundation of China(Grant Nos.41030106 and 41075060)
文摘In order to expand the application range of the classic Topographic Index model(TOPMODEL) and develop a more appropriate submodel of hydrological processes for use in the land surface model, two types of TOPMODEL are investigated, one with saturated hydraulic conductivity change with depth obeying exponential law(classical e-TOPMODEL or e-TOPMODEL for short) and the other obeying general power law(general p-TOPMODEL or p-TOPMODEL for short). Using observation date in the Suomo River catchment located in the upper reaches of the Yangtze River, the sensitivity study of the p-TOPMODEL was conducted and the simulated results from the model were examined and evaluated first, and then the results were compared with the results from the e-TOPMODEL to find the similarities and differences between the two types of models. The main conclusions obtained from the above studies are(1) topographic index and its distribution derived from the p-TOPPMODEL for the Suomo Basin are sensitive to changes of parameter n and m;(2) changes of n and m have impacts on the simulation results of various hydrological components(such as daily runoff, monthly averaged runoff, monthly averaged surface runoff and subsurface runoff), but have the weaker impacts on forty-year averaged total runoff; and(3) for the same value of m, the simulated results of e-TOPMODEL display higher surface runoff and lower subsurface runoff than the general p-TOPMODEL does but multi-year averaged total runoffs produced from the two types of TOPMODEL show insignificant difference. The differences between the two types of models indicate that it is necessary to pay close attention to correct selection from different hydrological models for use in land surface model development. The result mentioned above is useful to provide some referential information for the model selection.