期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
攻击机靶场效能模糊型指标体系研究 被引量:1
1
作者 汪民乐 高晓光 《系统工程理论与实践》 EI CSCD 北大核心 2002年第8期104-107,131,共5页
针对攻击机靶场效能随机型指标存在的不足 ,以模糊系统理论为基础 ,提出了一种新型靶场效能指标——模糊型效能指标 ,并给出了对各种类型地面目标射击时 ,相应的靶场效能模糊型指标算法 .
关键词 攻击机 靶场效能 模糊型指标体系 模糊理论
原文传递
Development and Application of Oil-Spill Risk Assessment Model for Offshore Pipeline 被引量:2
2
作者 LU Yan WANG Jia +2 位作者 WEI Wenpu YANG Yong AN Wei 《Journal of Ocean University of China》 SCIE CAS 2014年第3期415-420,共6页
To the potential oil-spill risk caused by offshore pipeline more attention has been paid after the Dalian oil spill incident from oil-pipeline explosion. Since then an issue about how to prevent and control the sudden... To the potential oil-spill risk caused by offshore pipeline more attention has been paid after the Dalian oil spill incident from oil-pipeline explosion. Since then an issue about how to prevent and control the sudden oil-spill from the offshore pipeline has been raised. In this paper, we proposed an optimized model to analyze the main causes(probability) of spill and the consequence with the fuzzy comprehensive assessment model. Considering the complicated assessment process for oil-spill, the assessment factor system involving the spill probability and consequence was established based on the operative manual and statistic leakage/damage data of offshore pipeline in order to estimate the integrated spill risk score automatically. The evaluated factors of spill probability could be grouped into five aspects: corrosion, fatigue, national damage, third party, and operational fault; the consequence evaluated factors of spill included hazard of oil and impact-controlling capability. With some modifications based on experts' opinions, each of the evaluated factors in our work was developed with a relative weight and evaluation criterion. A test example for an offshore pipeline in the Bohai waters was described to show how the model can be used for an actual case in more detail. By using the oil-spill risk assessment model, it is easy to determine the risk level associated with the ongoing activity and management level and hence to take the risk mitigation action immediately. 展开更多
关键词 oil spill risk assessment spill probability spill consequence fuzzy comprehensive assessment model offshore pipeline
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部