期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于模糊物料计划百分比与损耗率的GBOM模型
1
作者 米娜 方明 《科学技术与工程》 北大核心 2012年第33期9061-9065,9074,共6页
企业按订单生产模式下,针对传统GBOM模型存在对生产进行预测比较困难、在系统中维护灵活性欠佳等不足。首先对已有GBOM模型进行了研究分析;结合模块化BOM与GBOM的特点与优势提出一个模块化GBOM模型,同时给出确定产品零件模糊计划百分比... 企业按订单生产模式下,针对传统GBOM模型存在对生产进行预测比较困难、在系统中维护灵活性欠佳等不足。首先对已有GBOM模型进行了研究分析;结合模块化BOM与GBOM的特点与优势提出一个模块化GBOM模型,同时给出确定产品零件模糊计划百分比与损耗率的计算方法,并将其考虑到模块化GBOM模型中。提高了GBOM模型在企业物料计划中的预测准确性和科学性。最后以产品包装为实例验证了新的模块化GBOM模型的有效性,为GBOM模型的应用与深入研究提供一定的理论依据。 展开更多
关键词 ATO 模块化GBOM 模糊计划百分比 模糊损耗率
下载PDF
Power loss reduction of distribution systems using BFO based optimal reconfiguration along with DG and shunt capacitor placement simultaneously in fuzzy framework 被引量:1
2
作者 M.Mohammadi A.Mohammadi Rozbahani S.Bahmanyar 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第1期90-103,共14页
In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is... In distribution systems,network reconfiguration and capacitor placement are commonly used to diminish power losses and keep voltage profiles within acceptable limits.Moreover,the problem of DG allocation and sizing is great important.In this work,a combination of a fuzzy multi-objective approach and bacterial foraging optimization(BFO) as a meta-heuristic algorithm is used to solve the simultaneous reconfiguration and optimal sizing of DGs and shunt capacitors in a distribution system.Each objective is transferred into fuzzy domain using its membership function.Then,the overall fuzzy satisfaction function is formed and considered a fitness function inasmuch as the value of this function has to be maximized to gain the optimal solution.The numerical results show that the presented algorithm improves the performance much more than other meta-heuristic algorithms.Simulation results found that simultaneous reconfiguration with DG and shunt capacitors allocation(case 5) has 77.41%,42.15%,and 56.14%improvements in power loss reduction,load balancing,and voltage profile indices,respectively in 33-bus test system.This result found 87.27%,35.82%,and 54.34%improvements of mentioned indices respectively for 69-bus system. 展开更多
关键词 network reconfiguration distributed generation (DG) capacitor banks fuzzy framework bacterial foragingoptimization
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部