期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
软土地区深基坑地下连续墙多层锚杆支护正逆施工法 被引量:1
1
作者 韩日君 石秉元 范景伦 《施工技术》 CAS 北大核心 1998年第1期23-24,共2页
天津百货大楼扩建工程基坑支护采用地下连续墙多层锚杆正逆结合施工法,确保了环境安全,缩短了工期。
关键词 深基坑支护 地下连续墙 锚杆 正施法 施法
下载PDF
Study on scattering correction in fast neutron tomography at NECTAR facility
2
作者 LIU ShuQuan BCHERL Thomas +3 位作者 ZOU YuBin WANG Sheng LU YuanRong GUO ZhiYu 《Science China(Physics,Mechanics & Astronomy)》 SCIE EI CAS 2014年第2期244-250,共7页
Fast neutron tomography has been established as an inspection and detection tool at the NECTAR facility at the FRM-II reac- tor. Scattered neutrons from the object become a major disturbance and bring in artifacts and... Fast neutron tomography has been established as an inspection and detection tool at the NECTAR facility at the FRM-II reac- tor. Scattered neutrons from the object become a major disturbance and bring in artifacts and deviations in reconstruction re- suits, especially for hydrogenous material object. In this article, an iterative scattering correction method for fast neutron to- mography was proposed. In each loop of iteration the scattering component of the projections will be simulated by Mon- te-Carlo program MCNPX based on the previous reconstruction result and then it will be subtracted from original projections. The differences between scattering components at different perspectives were quantitatively evaluated and an average scatter- ing component image was used for all projections finally. Smooth and uniform slices with more clear edges were obtained and the new reconstructed attenuation coefficients are quite close to the real one compared to the results without scattering correc- tion, in which case the relative error of the reconstructed attenuation coefficients is about 10%-30%. 展开更多
关键词 fast neutron scattering correction neutron tomography NECTAR
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部