Caspian Gas into Balkans over medium to long term becames Albanian case on June 2013 when TAP route was selected. After Albanian National Territory Council approved TAP AG's Compound Development Permit, the project s...Caspian Gas into Balkans over medium to long term becames Albanian case on June 2013 when TAP route was selected. After Albanian National Territory Council approved TAP AG's Compound Development Permit, the project should start Construction Phase 1. Existing gas pipeline connections of Albania within the European network via TAP, is highly estimated by energy authorities in both technical and regulating aspects. New pipelines are projected to be build in order to meet local energy consume and seasonal fluctuations, as well as needs of Kosovo and FYROM. Some of important points: determination on the capacity sector building for a due Albanian Gas Market Model, supply options on the future gasification, alternatives of opening underground gas storages in the salt domes of Dumre region and extending pipelines to neighboring countries. By assistance of the Secretariat of Energy Community, MEI starts drafting the new gas law to meet Third Energy Package. TAP project, IAP project, Albania-Kosovo Pipeline, an LNG plant and terminals coastal construction, can contribute on the diversification of gas supply. Underground Gas Storage potentials are geologic solution target, considering the Upper Miocene depleted sandstone gas fields of Divjaka, as well as the Dumre evaporitic deposits diapir of the Upper Triassic.展开更多
文摘Caspian Gas into Balkans over medium to long term becames Albanian case on June 2013 when TAP route was selected. After Albanian National Territory Council approved TAP AG's Compound Development Permit, the project should start Construction Phase 1. Existing gas pipeline connections of Albania within the European network via TAP, is highly estimated by energy authorities in both technical and regulating aspects. New pipelines are projected to be build in order to meet local energy consume and seasonal fluctuations, as well as needs of Kosovo and FYROM. Some of important points: determination on the capacity sector building for a due Albanian Gas Market Model, supply options on the future gasification, alternatives of opening underground gas storages in the salt domes of Dumre region and extending pipelines to neighboring countries. By assistance of the Secretariat of Energy Community, MEI starts drafting the new gas law to meet Third Energy Package. TAP project, IAP project, Albania-Kosovo Pipeline, an LNG plant and terminals coastal construction, can contribute on the diversification of gas supply. Underground Gas Storage potentials are geologic solution target, considering the Upper Miocene depleted sandstone gas fields of Divjaka, as well as the Dumre evaporitic deposits diapir of the Upper Triassic.