For efficient energy consumption and control of effluent quality, the cycle duration for a sequencing batch reactor (SBR) needs to be adjusted by real-time control according to the characteristics and loading of waste...For efficient energy consumption and control of effluent quality, the cycle duration for a sequencing batch reactor (SBR) needs to be adjusted by real-time control according to the characteristics and loading of waste-water. In this study, an on-line information system for phosphorus removal processes was established. Based on the analysis for four systems with different ecological community structures and two operation modes, anaerobic-aerobic process and anaerobic-anaerobic process, the characteristic patterns of oxidation-reduction potential (ORP) and pH were related to phosphorous dynamics in the anaerobic, anoxic and aerobic phases, for determination of the end of phosphorous removal. In the operation mode of anaerobic-aerobic process, the pH profile in the anaerobic phase was used to estimate the relative amount of phosphorous accumulating organisms (PAOs) and glycogen accumulat-ing organisms (GAOs), which is beneficial to early detection of ecology community shifts. The on-line sensor val-ues of pH and ORP may be used as the parameters to adjust the duration for phosphorous removal and community shifts to cope with influent variations and maintain appropriate operation conditions.展开更多
In this study,four sequencing batch reactors(SBR),with the sludge retention time(SRT)of 5,10,20 and 40 d,were used to treat domestic wastewater,and the effect of SRT on nitrite accumulation in the biological nitrogen ...In this study,four sequencing batch reactors(SBR),with the sludge retention time(SRT)of 5,10,20 and 40 d,were used to treat domestic wastewater,and the effect of SRT on nitrite accumulation in the biological nitrogen removal SBR was investigated.The real-time control strategy based on online parameters,such as pH,dissolved oxygen(DO)and oxidation reduction potential(ORP),was used to regulate the nitrite accumulation in SBR. The model-based simulation and experimental results showed that with the increase of SRT,longer time was needed to achieve high level of nitritation.In addition,the nitrite accumulation rate(NAR)was higher when the SRT was relatively shorter during a 112-day operation.When the SRT was 5 d,the system was unstable with the mixed liquor suspended solids(MLSS)decreased day after day.When the SRT was 40 d,the nitrification process was significantly inhibited.SRT of 10 to 20 d was more suitable in this study.The real-time control strategy combined with SRT control in SBR is an effective method for biological nitrogen removal via nitrite from wastewater.展开更多
The possibilities of changes of ORP (oxidation-reduction water potential) with the help of chemical and physical-chemical methods were explored. Distillation and membrane technology were used as physical-chemical me...The possibilities of changes of ORP (oxidation-reduction water potential) with the help of chemical and physical-chemical methods were explored. Distillation and membrane technology were used as physical-chemical methods. In the case of application of chemical methods well-soluble substances were added into water. It was ascertained that the application of membrane technology makes it possible to obtain antioxidant water with negative ORR. Different energy change in a time unit can be applied in a whole number of technological processes and reveals new possibilities for many branches of industry.展开更多
基金Supported by the Project of Scientific Research Base and Scientific Innovation Platform of Beijing Municipal Education Com-mission (PXM2008_014204_050843)the National Natural Science Foundation of China (50808004)the DoctoralStartup Research Program of Beijing University of Technology
文摘For efficient energy consumption and control of effluent quality, the cycle duration for a sequencing batch reactor (SBR) needs to be adjusted by real-time control according to the characteristics and loading of waste-water. In this study, an on-line information system for phosphorus removal processes was established. Based on the analysis for four systems with different ecological community structures and two operation modes, anaerobic-aerobic process and anaerobic-anaerobic process, the characteristic patterns of oxidation-reduction potential (ORP) and pH were related to phosphorous dynamics in the anaerobic, anoxic and aerobic phases, for determination of the end of phosphorous removal. In the operation mode of anaerobic-aerobic process, the pH profile in the anaerobic phase was used to estimate the relative amount of phosphorous accumulating organisms (PAOs) and glycogen accumulat-ing organisms (GAOs), which is beneficial to early detection of ecology community shifts. The on-line sensor val-ues of pH and ORP may be used as the parameters to adjust the duration for phosphorous removal and community shifts to cope with influent variations and maintain appropriate operation conditions.
基金Supported by the National Key Technologies Research and Development Program of China during the Eleventh Five-year Plan Period(2006BAC19B03)the Project of Scientific Research Base and Scientific Innovation Platform of Beijing Municipal Education Commission(PXM2008_014204_050843the State Key Laboratory of Urban Water Resource and Environment(HIT)(QAK201006)
文摘In this study,four sequencing batch reactors(SBR),with the sludge retention time(SRT)of 5,10,20 and 40 d,were used to treat domestic wastewater,and the effect of SRT on nitrite accumulation in the biological nitrogen removal SBR was investigated.The real-time control strategy based on online parameters,such as pH,dissolved oxygen(DO)and oxidation reduction potential(ORP),was used to regulate the nitrite accumulation in SBR. The model-based simulation and experimental results showed that with the increase of SRT,longer time was needed to achieve high level of nitritation.In addition,the nitrite accumulation rate(NAR)was higher when the SRT was relatively shorter during a 112-day operation.When the SRT was 5 d,the system was unstable with the mixed liquor suspended solids(MLSS)decreased day after day.When the SRT was 40 d,the nitrification process was significantly inhibited.SRT of 10 to 20 d was more suitable in this study.The real-time control strategy combined with SRT control in SBR is an effective method for biological nitrogen removal via nitrite from wastewater.
文摘The possibilities of changes of ORP (oxidation-reduction water potential) with the help of chemical and physical-chemical methods were explored. Distillation and membrane technology were used as physical-chemical methods. In the case of application of chemical methods well-soluble substances were added into water. It was ascertained that the application of membrane technology makes it possible to obtain antioxidant water with negative ORR. Different energy change in a time unit can be applied in a whole number of technological processes and reveals new possibilities for many branches of industry.