In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydr...In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydropower projects in deep river valley,the stabilization techniques for underground cavern group with large span and high side walls are introduced in this paper.As for rock engineering and technology in highway and railway construction,the Qinghai-Tibet Railway — new construction techniques in permafrost,the support techniques for large squeezing deformation in Wuqiaoling Tunnel,the construction techniques for tunnels in alpine and high-altitude region,the geological prediction techniques for tunnels in karst region,the microseismic monitoring and early warning techniques for rockbursts in deep and long tunnels are presented.For rock engineering and technology inmining engineering,the innovative techniques for roadway support inmines,the simultaneous extraction technique of pillarless coal and gas in coal seams with low permeability,the safe and efficient deep openmining technology,advances in monitoring,early warning and treatment ofmine dynamic disasters are discussed.In addition,the new anchorage techniques and precision blasting technique in rock engineering are introduced.展开更多
This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geog...This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geographical change particularly captured by the Yellow River, (2) water conservancy project construction, and (3) socioeconomic development in the Huai River Basin. Key problems of changes in this river-lake relationship and the Huai River flood control are tackled, involving flood control and disaster alleviation ability of the Basin, engineering and non-engineering measurements applied to flood control and disaster mitigation, and water governance for adaptive management. Research shows that the Huai River is a rather complex one due to its complex geography with a hybrid wet and dry climate zoon, and higher population density. With the alternation of the river-lake relationship and socioeconomic development in the region, new problems keep arising, imposing new requirements on its sustainable water management. Thus, understanding the Huai River is a long and gradually improving process. Its future planning should keep absorbing new achievements of science and technology development, employing new technologies and methods, and gradually deepening our understanding of its fundamental principles. Water governance and adaptive water management will be new challenges and opportunities for the Basin in its river system change and flood control.展开更多
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e...In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.展开更多
文摘In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydropower projects in deep river valley,the stabilization techniques for underground cavern group with large span and high side walls are introduced in this paper.As for rock engineering and technology in highway and railway construction,the Qinghai-Tibet Railway — new construction techniques in permafrost,the support techniques for large squeezing deformation in Wuqiaoling Tunnel,the construction techniques for tunnels in alpine and high-altitude region,the geological prediction techniques for tunnels in karst region,the microseismic monitoring and early warning techniques for rockbursts in deep and long tunnels are presented.For rock engineering and technology inmining engineering,the innovative techniques for roadway support inmines,the simultaneous extraction technique of pillarless coal and gas in coal seams with low permeability,the safe and efficient deep openmining technology,advances in monitoring,early warning and treatment ofmine dynamic disasters are discussed.In addition,the new anchorage techniques and precision blasting technique in rock engineering are introduced.
基金The National Basic Research Program of China (2010CB428406)the National Natural Science Foundation of China (No. 41071025/40730632) & National Key Water Project (No.2009ZX07210-006)
文摘This paper addresses the change of the river-lake relationship in the Huai River and its causes due to environmental change and human activities. A preliminary analysis is made from three aspects: (1) the natural geographical change particularly captured by the Yellow River, (2) water conservancy project construction, and (3) socioeconomic development in the Huai River Basin. Key problems of changes in this river-lake relationship and the Huai River flood control are tackled, involving flood control and disaster alleviation ability of the Basin, engineering and non-engineering measurements applied to flood control and disaster mitigation, and water governance for adaptive management. Research shows that the Huai River is a rather complex one due to its complex geography with a hybrid wet and dry climate zoon, and higher population density. With the alternation of the river-lake relationship and socioeconomic development in the region, new problems keep arising, imposing new requirements on its sustainable water management. Thus, understanding the Huai River is a long and gradually improving process. Its future planning should keep absorbing new achievements of science and technology development, employing new technologies and methods, and gradually deepening our understanding of its fundamental principles. Water governance and adaptive water management will be new challenges and opportunities for the Basin in its river system change and flood control.
文摘In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.