In this paper the computer code of AUTOUGH2 is used to carry out numerical simulation study on the Wuqing geothermal reservoir for evaluating reservoir performance upon different exploitation schemes.The simulating ca...In this paper the computer code of AUTOUGH2 is used to carry out numerical simulation study on the Wuqing geothermal reservoir for evaluating reservoir performance upon different exploitation schemes.The simulating calculation and analysis of two main cases,production without reinjection and production with reinjection,were carried out to illuminate and compare the temperature and pressure profiles with distance and time.The water level or pressure will decrease with the time of production,and the reinjection will cause the cooling effect of reinjection on the production zone.展开更多
In consideration of the contact between the steel spiral casing and the peripheral reinforced concrete, a nonlinear analysis for the combined bearing structure of the JinPing-I preloading filling spiral case has been ...In consideration of the contact between the steel spiral casing and the peripheral reinforced concrete, a nonlinear analysis for the combined bearing structure of the JinPing-I preloading filling spiral case has been made with ANSYS. Contrasts of the stress of the reinforcing bars, the biggest width of the crack and the outspread section of the crack has been made with the different parameters of preloading pressure and reinforcement scheme, resulting in a reasonable preloading pressure and reinforcement scheme. This conclusion has been applied to the spiral casing of JinPing-I hydropower station.展开更多
文摘In this paper the computer code of AUTOUGH2 is used to carry out numerical simulation study on the Wuqing geothermal reservoir for evaluating reservoir performance upon different exploitation schemes.The simulating calculation and analysis of two main cases,production without reinjection and production with reinjection,were carried out to illuminate and compare the temperature and pressure profiles with distance and time.The water level or pressure will decrease with the time of production,and the reinjection will cause the cooling effect of reinjection on the production zone.
文摘In consideration of the contact between the steel spiral casing and the peripheral reinforced concrete, a nonlinear analysis for the combined bearing structure of the JinPing-I preloading filling spiral case has been made with ANSYS. Contrasts of the stress of the reinforcing bars, the biggest width of the crack and the outspread section of the crack has been made with the different parameters of preloading pressure and reinforcement scheme, resulting in a reasonable preloading pressure and reinforcement scheme. This conclusion has been applied to the spiral casing of JinPing-I hydropower station.