期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
平面摆非线性振动水平分量方程的建立及其近似解
1
作者 原立盛 《西安联合大学学报》 2002年第2期68-71,共4页
本文讨论了平面摆在振幅并不是很小情况下的自由运动 ,推导了运动微分方程在水平方向的投影 ,用微扰法求解该非线性方程的近似解 。
关键词 平面摆 非线性振动 水平分量方程 微扰法
下载PDF
Vertical-to-horizontal response spectral ratio for offshore ground motions:Analysis and simplified design equation 被引量:12
2
作者 陈宝魁 王东升 +2 位作者 李宏男 孙治国 李超 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第1期203-216,共14页
In order to study the differences in vertical component between onshore and offshore motions,the vertical-to-horizontal peak ground acceleration ratio(V/H PGA ratio) and vertical-to-horizontal response spectral ratio(... In order to study the differences in vertical component between onshore and offshore motions,the vertical-to-horizontal peak ground acceleration ratio(V/H PGA ratio) and vertical-to-horizontal response spectral ratio(V/H) were investigated using the ground motion recordings from the K-NET network and the seafloor earthquake measuring system(SEMS).The results indicate that the vertical component of offshore motions is lower than that of onshore motions.The V/H PGA ratio of acceleration time histories at offshore stations is about 50%of the ratio at onshore stations.The V/H for offshore ground motions is lower than that for onshore motions,especially for periods less than 0.8 s.Furthermore,based on the results in statistical analysis for offshore recordings in the K-NET,the simplified V/H design equations for offshore motions in minor and moderate earthquakes are proposed for seismic analysis of offshore structures. 展开更多
关键词 offshore ground motion vertical component simplified design equation vertical-to-horizontal response spectral ratio (V/H) vertical-to-horizontal peak ground acceleration ratio (V/H PGA ratio) K-NET network seafloor earthquake measuring system (SEMS)
下载PDF
Parameters for Use of BEWAB+ Programme to Schedule Irrigation of Pea (Pisum sativum L,)
3
作者 Leon van Rensburg Mamus Strydom Alan Bennie Chris du Preez 《Journal of Agricultural Science and Technology(A)》 2013年第8期622-632,共11页
A large portion of irrigation farmers make use of subjective (intuition) irrigation scheduling methods as supposed to objective or scientific irrigation scheduling methods, which need to be changed. The BEsproeiings... A large portion of irrigation farmers make use of subjective (intuition) irrigation scheduling methods as supposed to objective or scientific irrigation scheduling methods, which need to be changed. The BEsproeiingsWAterbestuursprogram (BEWAB+) irrigation scheduling programme is based on the water balance equation and needs: (1) a crop production function; (2) a relative consumptive water demand curve and (3) an allowable depletion subroutine. The objective of this paper was to describe research aimed at obtaining information on (1) and (2) for pea and also to describe the effect of water application on yield and water use of pea. BEWAB+ uses this information to estimate the daily irrigation water requirements for a particular soil-crop-atmosphere system under irrigation. A field experiment, based on published line-source irrigation methodology, was conducted on a 3 m deep loamy fine sand Bainsvlei or Ustic Quartzipsamment soil near Bloemfontein (26°08′S; 29°01′E) in South Africa. Results showed that there is a linear relationship of the form Ys = 8.07ET - 249 (r2 = 0.91), where Ys is the seed yield of pea (kg/ha) and ET is evapotranspiration for the growing season (mm). The relative consumptive water demand curve is represented by the following third order polynomial function that describes the relationship between time and relative ET for a pea growing season of 120 days: ETrelx = 0.09419646 - 0.01302413x + 0.00059008x2 - 0.00000371x3. ETrelz denotes relative ET and x denotes time in days. A workable balance between practical problem solving and advanced irrigation science has been established with BEWAB+. Pre-plant irrigation schedules can be made for semi-arid areas with the BEWAB+ programme using easily obtainable inputs, like target yield, soil depth and soil particle size distribution information. 展开更多
关键词 Crop water demand EVAPOTRANSPIRATION irrigation scheduling line source irrigation system pea.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部