There exist different response characteristics in the resistivity measurements of dual laterolog (DLL) and logging while drilling (LWD) electromagnetic wave propagation logging in highly deviated and horizontal we...There exist different response characteristics in the resistivity measurements of dual laterolog (DLL) and logging while drilling (LWD) electromagnetic wave propagation logging in highly deviated and horizontal wells due to the difference in their measuring principles. In this study, we first use the integral equation method simulated the response characteristics of LWD resistivity and use the three dimensional finite element method (3D-FEM) simulated the response characteristics of DLL resistivity in horizontal wells, and then analyzed the response differences between the DLL and LWD resistivity. The comparative analysis indicated that the response differences may be caused by different factors such as differences in the angle of instrument inclination, anisotropy, formation interface, and mud intrusion. In the interface, the curves of the LWD resistivity become sharp with increases in the deviation while those of the DLL resistivity gradually become smooth. Both curves are affected by the anisotropy although the effect on DLL resistivity is lower than the LWD resistivity. These differences aid in providing a reasonable explanation in the horizontal well. However, this can also simultaneously lead to false results. At the end of the study, we explain the effects of the differences in the interpretation of the horizontal well based on the results and actual data analysis.展开更多
Dimensional analysis and numerical simulations were carried out to research prediction method of breakthrough time of horizontal wells in bottom water reservoir. Four dimensionless independent variables and dimensionl...Dimensional analysis and numerical simulations were carried out to research prediction method of breakthrough time of horizontal wells in bottom water reservoir. Four dimensionless independent variables and dimensionless time were derived from 10 influencing factors of the problem by using dimensional analysis. Simulations of horizontal well in reservoir with bottom water were run to find the prediction correlation. A general and concise functional relationship for predicting breakthrough time was established based on simulation results and theoretical analysis. The breakthrough time of one conceptual model predicted by the correlation is very close to the result by Eclipse with less than 2% error. The practical breakthrough time of one well in Helder oilfield is 10 d, and the predicted results by the method is 11.2 d, which is more accurate than the analytical result. Case study indicates that the method could predict breakthrough time of horizontal well under different reservoir conditions accurately. For its university and ease of use, the method is suitable for quick prediction of breakthrough time.展开更多
In conventional seismic exploration,complex overburden prevents us from imaging the deeper underground structure,because near-surface velocity model cannot be efficiently simplified and accurately established. The vir...In conventional seismic exploration,complex overburden prevents us from imaging the deeper underground structure,because near-surface velocity model cannot be efficiently simplified and accurately established. The virtual source method provides a promising solution,which images below a complex overburden without the knowledge of overburden velocities and near-surface changes. In this paper,the authors simulate the forward modeling under complex overburden with sources on the surface and receivers in the horizontal well,and reset the real sources into the horizontal well using the virtual source method,which subtly avoid the distortion effects of the complex overburden. Finally the underground structure can be imaged using Kirchhoff migration,so the feasibility and advantages of the virtual source method are verified.展开更多
基金supported by the National Science and Technology Major Project of China(Nos.2016ZX05014-002-001,2016ZX05002-005-001,and 2017ZX05005-005-005)
文摘There exist different response characteristics in the resistivity measurements of dual laterolog (DLL) and logging while drilling (LWD) electromagnetic wave propagation logging in highly deviated and horizontal wells due to the difference in their measuring principles. In this study, we first use the integral equation method simulated the response characteristics of LWD resistivity and use the three dimensional finite element method (3D-FEM) simulated the response characteristics of DLL resistivity in horizontal wells, and then analyzed the response differences between the DLL and LWD resistivity. The comparative analysis indicated that the response differences may be caused by different factors such as differences in the angle of instrument inclination, anisotropy, formation interface, and mud intrusion. In the interface, the curves of the LWD resistivity become sharp with increases in the deviation while those of the DLL resistivity gradually become smooth. Both curves are affected by the anisotropy although the effect on DLL resistivity is lower than the LWD resistivity. These differences aid in providing a reasonable explanation in the horizontal well. However, this can also simultaneously lead to false results. At the end of the study, we explain the effects of the differences in the interpretation of the horizontal well based on the results and actual data analysis.
基金Project(2011ZX05009-004)supported by the National Science and Technology Major Projects of China
文摘Dimensional analysis and numerical simulations were carried out to research prediction method of breakthrough time of horizontal wells in bottom water reservoir. Four dimensionless independent variables and dimensionless time were derived from 10 influencing factors of the problem by using dimensional analysis. Simulations of horizontal well in reservoir with bottom water were run to find the prediction correlation. A general and concise functional relationship for predicting breakthrough time was established based on simulation results and theoretical analysis. The breakthrough time of one conceptual model predicted by the correlation is very close to the result by Eclipse with less than 2% error. The practical breakthrough time of one well in Helder oilfield is 10 d, and the predicted results by the method is 11.2 d, which is more accurate than the analytical result. Case study indicates that the method could predict breakthrough time of horizontal well under different reservoir conditions accurately. For its university and ease of use, the method is suitable for quick prediction of breakthrough time.
文摘In conventional seismic exploration,complex overburden prevents us from imaging the deeper underground structure,because near-surface velocity model cannot be efficiently simplified and accurately established. The virtual source method provides a promising solution,which images below a complex overburden without the knowledge of overburden velocities and near-surface changes. In this paper,the authors simulate the forward modeling under complex overburden with sources on the surface and receivers in the horizontal well,and reset the real sources into the horizontal well using the virtual source method,which subtly avoid the distortion effects of the complex overburden. Finally the underground structure can be imaged using Kirchhoff migration,so the feasibility and advantages of the virtual source method are verified.