On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The hea...On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The heavy ruined area was up to 30,000km2 and 13% of its land surface was denuded by the extremely terrible quakes. The mountain collapses, landslides and debris flows induced by the earthquake not only scared the landscape at the immense scale, but also poured L66-billion-m3 sediment combined with offscourings and rubble into the Yangtze River and its breaches. This amount of sediments is 3 times more than the normal amount discharged into the Yangtze River, and will significantly increase sediment transportation of rivers and decrease storage capacities of reservoirs downstream. The dramatic increase in sediment load will imperil the engineering safety and impact the operation of the giant Three-Gorge Hydro-power Station if no proper prevention measures are taken.展开更多
This paper introduces a proposal for reservoir volume calculation in rainwater harvesting systems. The proposed method can be used for reservoir volume design in rainwater harvesting systems and is based on three impo...This paper introduces a proposal for reservoir volume calculation in rainwater harvesting systems. The proposed method can be used for reservoir volume design in rainwater harvesting systems and is based on three important variables. These variables are water demand, system efficiency and repayment time. Several simulations were carried out in different scenarios considering typical values of both catchment area (for low-income and medium-income households) and water demand, with fixed water and tank costs. Results showed that the integrated analysis of demand, efficiency and repayment time may assist designers to determine a more adequate reservoir volume.展开更多
基金carried out under the auspices of the public project of the Ministry of Water Conservancy of China (200801073, 2007SHZ0901034)the Knowledge Innovation Project of the Chinese Academy of Science (KZCX1-YW-08)
文摘On May 12, 2008, an earthquake of 8.0 magnitude on the Richter scale and its numerous aftershocks devastatingly hit Wenchuan County and its nearby region along the Longman Mountains in Sichuan Province, China. The heavy ruined area was up to 30,000km2 and 13% of its land surface was denuded by the extremely terrible quakes. The mountain collapses, landslides and debris flows induced by the earthquake not only scared the landscape at the immense scale, but also poured L66-billion-m3 sediment combined with offscourings and rubble into the Yangtze River and its breaches. This amount of sediments is 3 times more than the normal amount discharged into the Yangtze River, and will significantly increase sediment transportation of rivers and decrease storage capacities of reservoirs downstream. The dramatic increase in sediment load will imperil the engineering safety and impact the operation of the giant Three-Gorge Hydro-power Station if no proper prevention measures are taken.
文摘This paper introduces a proposal for reservoir volume calculation in rainwater harvesting systems. The proposed method can be used for reservoir volume design in rainwater harvesting systems and is based on three important variables. These variables are water demand, system efficiency and repayment time. Several simulations were carried out in different scenarios considering typical values of both catchment area (for low-income and medium-income households) and water demand, with fixed water and tank costs. Results showed that the integrated analysis of demand, efficiency and repayment time may assist designers to determine a more adequate reservoir volume.