Although high resolution can be provided by electrical logging, the measured electrical log range is narrow and is limited to near the well. Borehole-surface electric potential measurements are able to detect a wide e...Although high resolution can be provided by electrical logging, the measured electrical log range is narrow and is limited to near the well. Borehole-surface electric potential measurements are able to detect a wide enough range but its resolution is limited, particularly for reservoirs with complex oil and water distribution or complicated structure. In this study, we attempt to accurately locate the 3-D reservoir water and oil distribution by combining borehole-surface and crosswell electric potentials. First, the distributions of oil and water in both vertical and horizontal directions are detected by the borehole-surface and erosswell electric potential methods, respectively, and then the measured crosswell potential result is used to calibrate the measured borehole-surface electric potential data to improve vertical resolution so that the residual oil distribution is determined in a lower half-space with three dimensions. The evaluation of residual oil distribution is obtained by investigation of differences between the simulation results of the reservoir with and without water flooding. The finite difference numerical simulation results prove that the spatial residual oil distribution can be effectively determined by combining the crosswell and borehole-surface electric potentials.展开更多
According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research...According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.展开更多
A three-dimensional eutrophication model was applied to assist the management of Dahuofang Reservoir in China.Transport processes were obtained from the three-dimensional,finite volume hydrodynamic model.The hydrodyna...A three-dimensional eutrophication model was applied to assist the management of Dahuofang Reservoir in China.Transport processes were obtained from the three-dimensional,finite volume hydrodynamic model.The hydrodynamic model was verified for a one-year time period in 2006.Our simulation reproduced intra-annual variation of stratification.The simulated variation of vertical thermal structures also matched observations.The water quality model included 8 state variables,including dissolved oxygen,phytoplankton as carbon,carbonaceous biochemical oxygen demand,ammonium nitrogen,nitrate and nitrite nitrogen,ortho-phosphorus,organic nitrogen,and organic phosphorus.Sensitivity of the parameters has been analyzed to decide which process would affect the water quality in the simulation.The water quality verification suggested the model successfully computed the temporal cycles and spatial distributions of key water quality components.The comparison between water quality components before and after the first phase of the water conveyance project suggests that the project has a slight effect on the reservoir ecosystem.The model could be used as a tool to guide physico-biological engineering design or management strategies for Dahuofang Reservoir.展开更多
Recently, due to more flooding, schistosomiasis is in expanding tendency in some areas. With Three Gorges Engineering progress, schistosomiasis will occurr potentially in Three Gorges reservoir. In order to control th...Recently, due to more flooding, schistosomiasis is in expanding tendency in some areas. With Three Gorges Engineering progress, schistosomiasis will occurr potentially in Three Gorges reservoir. In order to control the disease, some methods must be applied, e.g. chemicals, biological measures. To some extent every way has its specific effect. However, the vital way is improving the environment and reducing the amount of snails. One of the effective ways is conducting forestry ecological engineering that focuses on snail control and schistosomiasis prevention. The practical ways cover such as pollution controlling, ditches surface hardening. Especially for water-level-fluctuation zone, conducting forestry ecological engineering to improve environment to prevent snails’ propagation is significant and vital. By operating the project environment could be greatly improved and people’s living conditions would be bettered.展开更多
文摘Although high resolution can be provided by electrical logging, the measured electrical log range is narrow and is limited to near the well. Borehole-surface electric potential measurements are able to detect a wide enough range but its resolution is limited, particularly for reservoirs with complex oil and water distribution or complicated structure. In this study, we attempt to accurately locate the 3-D reservoir water and oil distribution by combining borehole-surface and crosswell electric potentials. First, the distributions of oil and water in both vertical and horizontal directions are detected by the borehole-surface and erosswell electric potential methods, respectively, and then the measured crosswell potential result is used to calibrate the measured borehole-surface electric potential data to improve vertical resolution so that the residual oil distribution is determined in a lower half-space with three dimensions. The evaluation of residual oil distribution is obtained by investigation of differences between the simulation results of the reservoir with and without water flooding. The finite difference numerical simulation results prove that the spatial residual oil distribution can be effectively determined by combining the crosswell and borehole-surface electric potentials.
基金support from the Technology Pillar Program during the"Eleventh Five-year Plan"Period (No.2006BAB05B02No.2006BAB05B03) are acknowledged
文摘According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.
基金supported by the National Science and Technology Major Special Project of China on Water Pollution Control and Management (Grant No. 2009ZX07528-006-01)the National Natural Science Foundation of China (Grant No. 50839001)
文摘A three-dimensional eutrophication model was applied to assist the management of Dahuofang Reservoir in China.Transport processes were obtained from the three-dimensional,finite volume hydrodynamic model.The hydrodynamic model was verified for a one-year time period in 2006.Our simulation reproduced intra-annual variation of stratification.The simulated variation of vertical thermal structures also matched observations.The water quality model included 8 state variables,including dissolved oxygen,phytoplankton as carbon,carbonaceous biochemical oxygen demand,ammonium nitrogen,nitrate and nitrite nitrogen,ortho-phosphorus,organic nitrogen,and organic phosphorus.Sensitivity of the parameters has been analyzed to decide which process would affect the water quality in the simulation.The water quality verification suggested the model successfully computed the temporal cycles and spatial distributions of key water quality components.The comparison between water quality components before and after the first phase of the water conveyance project suggests that the project has a slight effect on the reservoir ecosystem.The model could be used as a tool to guide physico-biological engineering design or management strategies for Dahuofang Reservoir.
文摘Recently, due to more flooding, schistosomiasis is in expanding tendency in some areas. With Three Gorges Engineering progress, schistosomiasis will occurr potentially in Three Gorges reservoir. In order to control the disease, some methods must be applied, e.g. chemicals, biological measures. To some extent every way has its specific effect. However, the vital way is improving the environment and reducing the amount of snails. One of the effective ways is conducting forestry ecological engineering that focuses on snail control and schistosomiasis prevention. The practical ways cover such as pollution controlling, ditches surface hardening. Especially for water-level-fluctuation zone, conducting forestry ecological engineering to improve environment to prevent snails’ propagation is significant and vital. By operating the project environment could be greatly improved and people’s living conditions would be bettered.