水库水工建筑物的运行和维护研究
1
作者 郝宇 《水上安全》 2024年第12期166-168,共3页
水库在我国经济发展中发挥了重要作用,与国计民生有着紧密联系。水库水工建筑在日常运行时,受水压等相关因素的影响,容易出现变形、裂缝等隐患问题,影响水工建筑物整体稳固性,导致运行安全性下降。所以在此情况下需要加强重视水库水工... 水库在我国经济发展中发挥了重要作用,与国计民生有着紧密联系。水库水工建筑在日常运行时,受水压等相关因素的影响,容易出现变形、裂缝等隐患问题,影响水工建筑物整体稳固性,导致运行安全性下降。所以在此情况下需要加强重视水库水工建筑物的运行安全性,全面分析水库水工建筑物运行维护中存在的问题,了解其运行监测内容,结合水库水工建筑物类型特点及规范要求,制定更全面有效的运行维护对策,以提高水库水工建筑物整体运行水平,为水利行业的可持续发展提供推力。本文就水库水工建筑物的运行和维护作出分析,提出几点建议,以供参考。 展开更多
关键词 水库水工建筑物 运行 维护 对策
下载PDF
A study on dynamic response of slopes under wave action using simulation tests 被引量:1
2
作者 包太 《Journal of Chongqing University》 CAS 2003年第1期46-48,共3页
After the erection of the Three Gorges Dam, the water level of Yangtze River will reach 175 m, and the average wave crest will be up to 1 m. Therefore the wave action cannot be neglected for the slope stability. Throu... After the erection of the Three Gorges Dam, the water level of Yangtze River will reach 175 m, and the average wave crest will be up to 1 m. Therefore the wave action cannot be neglected for the slope stability. Through simulation tests, the wave-induced dynamic response of the slope is analyzed. The soil body is taken as linear elastic body when it has a small deformation under the small wave action. Based on tests, the excess pore pressure and slope displacement under the loading in different wave period are analyzed. The ratio of dynamic strength and static strength to the breaking process of the slope is discussed. It is demonstrated that smaller wave period gives rise to a larger strain of the slope under the same stress. At different depth of water, different weakness effect on the stability of the soil slope is observed and the slope has an adaptability to the wave action to some extent. 展开更多
关键词 wave action SLOPE simulation test dynamic response
下载PDF
Sediment Delivered in the Upper Part of Mosul Using Physical Model 被引量:1
3
作者 Issa E. Issa Nadhir AI-Ansari +1 位作者 Seven Knutsson Moayad Khaleel 《Journal of Civil Engineering and Architecture》 2012年第11期1544-1550,共7页
Mosul dam is the biggest hydraulic structure in Iraq located on the River Tigris 60 km northwest of Mosul city. Its storage capacity is 11. 11 × 109 m3 and it had been in operation since 1986. A physical distorte... Mosul dam is the biggest hydraulic structure in Iraq located on the River Tigris 60 km northwest of Mosul city. Its storage capacity is 11. 11 × 109 m3 and it had been in operation since 1986. A physical distorted model with movable bed having a vertical scale 1: 100 and a horizontal scale 1:1000 was used to conduct the experiments relating the water level at the reservoir and water discharge upstream the reservoir with the bed load transport rate. The model represents the first 15 km of most northern part of Mosul dam reservoir. The construction of the model was based on bathymetric survey conducted in 2009. Twenty-four experiments were executed using four different discharges (0.5, 1.0, 1.5, and 2.0 L/s) which represent the average discharges in the flood period of River Tigris. At each individual discharge six operations were assumed where the reservoir's water level was 305, 307, 309, 310, 312, 315 meters above sea level respectively. In all the experiments conducted, bedload transport was measured in the physical model at section representing the River Tigris 1 km upstream the reservoir. The results showed that the bedload rate was decreasing when the water level within the reservoir was increasing. It was also evident that bedload transport rate dramatically decreased at level 310 meters above sea level onward. This is due to the fact that at this level represent the effect of backwater which was noticeable on the river cross section 展开更多
关键词 Sediment transport Mosul dam reservoir operation BEDLOAD physical model.