Ultrasonic cement bond logging is a widely used method for evaluating cementing quality. Conventional ultrasonic cement bond logging uses vertical incidence and cannot accurately evaluate lightweight cement bonding. O...Ultrasonic cement bond logging is a widely used method for evaluating cementing quality. Conventional ultrasonic cement bond logging uses vertical incidence and cannot accurately evaluate lightweight cement bonding. Oblique incidence is a new technology for evaluating cement quality with improved accuracy for lightweight cements. In this study, we simulated models of acoustic impedance of cement and cementing quality using ultrasonic oblique incidence, and we obtained the relation between cementing quality, acoustic impedance of cement, and the acoustic attenuation coeffi cient of the A0-mode and S0-mode Lamb waves. Then, we simulated models of different cement thickness and we obtained the relation between cement thickness and the time difference of the arrival between the A0 and A0′ modes.展开更多
Cemented paste backfill (CPB) is gaining popularity in many underground mines worldwide. Sufficient water is added into CPB to make a flowable material for pipe transportation. Barricades are built near the drawpoin...Cemented paste backfill (CPB) is gaining popularity in many underground mines worldwide. Sufficient water is added into CPB to make a flowable material for pipe transportation. Barricades are built near the drawpoints to prevent in-rush of the fill slurry. To avoid barricade failures resulting from excessive backfill pressures, backfilling is typically performed with a plug pour followed by a final pour. The interval between the two pours should be shortened or removed to increase mining productivity and avoid pipe clogging. Recently, Li proposed to apply wick drains in backfilled stopes to promote drainage and consolidation. The preliminary simulations by considering an instantaneous filling indicated that the drainage of CPB can be significantly accelerated by using wick drains. Barricade was not considered. Here, some new numerical modeUings are presented with more representative filling sequences, stope geometry, and different draining configurations. The results illustrate that the stope can be backfilled continuously by using wick drains.展开更多
In this study, a multivariate local quadratic polynomial regression(MLQPR) method is proposed to design a model for the sludge volume index(SVI). In MLQPR, a quadratic polynomial regression function is established to ...In this study, a multivariate local quadratic polynomial regression(MLQPR) method is proposed to design a model for the sludge volume index(SVI). In MLQPR, a quadratic polynomial regression function is established to describe the relationship between SVI and the relative variables, and the important terms of the quadratic polynomial regression function are determined by the significant test of the corresponding coefficients. Moreover, a local estimation method is introduced to adjust the weights of the quadratic polynomial regression function to improve the model accuracy. Finally, the proposed method is applied to predict the SVI values in a real wastewater treatment process(WWTP). The experimental results demonstrate that the proposed MLQPR method has faster testing speed and more accurate results than some existing methods.展开更多
In this study,the activated sludge model implemented in the BioWin software was validated against full-scale wastewater treatment plant data. Only two stoichiometric parameters(Y p /acetic and the heterotrophic yield(...In this study,the activated sludge model implemented in the BioWin software was validated against full-scale wastewater treatment plant data. Only two stoichiometric parameters(Y p /acetic and the heterotrophic yield(Y H)) required calibration. The value 0.42 was used for Yp /acetic in this study,while the default value of the BioWin software is 0.49,making it comparable with the default values of the corresponding parameter(yield of phosphorus release to substrate uptake(YPO4)) used in ASM2,ASM2 d,and ASM3 P,respectively. Three scenarios were evaluated to improve the performance of the wastewater treatment plant,the possibility of wasting sludge from either the aeration tank or the secondary clarifier,the construction of a new oxidation ditch,and the construction of an equalization tank. The results suggest that construction of a new oxidation ditch or an equalization tank for the wastewater treatment plant is not necessary. However,sludge should be wasted from the aeration tank during wet weather to reduce the solids loading of the clarifiers and avoid effluent violations. Therefore,it is recommended that the design of wastewater treatment plants(WWTPs) should include flexibility to operate the plants in various modes. This is helpful in selection of the appropriate operating mode when necessary,resulting in substantial reductions in operating costs.展开更多
基金partially supported by the National Natural Science Foundation of China(Nos.11204380,11374371,61102102,and 11134011)National Science and Technology Major Project(No.2011ZX05020-009)+1 种基金Petro China Innovation Foundation(No.2013D-5006-0304)Chinese Petroleum Corporation Project(Nos.2011A-3903 and 2011B-4001)
文摘Ultrasonic cement bond logging is a widely used method for evaluating cementing quality. Conventional ultrasonic cement bond logging uses vertical incidence and cannot accurately evaluate lightweight cement bonding. Oblique incidence is a new technology for evaluating cement quality with improved accuracy for lightweight cements. In this study, we simulated models of acoustic impedance of cement and cementing quality using ultrasonic oblique incidence, and we obtained the relation between cementing quality, acoustic impedance of cement, and the acoustic attenuation coeffi cient of the A0-mode and S0-mode Lamb waves. Then, we simulated models of different cement thickness and we obtained the relation between cement thickness and the time difference of the arrival between the A0 and A0′ modes.
基金the Natural Sciences and Engineering Research Council of Canada (RGPIN)the Institut de recherche Robert-Sauvé en santé et en sécurité du travail (IRSST)the industrial partners of the Research Institute on Mines and the Environment (RIME UQAT-Polytechnique)
文摘Cemented paste backfill (CPB) is gaining popularity in many underground mines worldwide. Sufficient water is added into CPB to make a flowable material for pipe transportation. Barricades are built near the drawpoints to prevent in-rush of the fill slurry. To avoid barricade failures resulting from excessive backfill pressures, backfilling is typically performed with a plug pour followed by a final pour. The interval between the two pours should be shortened or removed to increase mining productivity and avoid pipe clogging. Recently, Li proposed to apply wick drains in backfilled stopes to promote drainage and consolidation. The preliminary simulations by considering an instantaneous filling indicated that the drainage of CPB can be significantly accelerated by using wick drains. Barricade was not considered. Here, some new numerical modeUings are presented with more representative filling sequences, stope geometry, and different draining configurations. The results illustrate that the stope can be backfilled continuously by using wick drains.
文摘In this study, a multivariate local quadratic polynomial regression(MLQPR) method is proposed to design a model for the sludge volume index(SVI). In MLQPR, a quadratic polynomial regression function is established to describe the relationship between SVI and the relative variables, and the important terms of the quadratic polynomial regression function are determined by the significant test of the corresponding coefficients. Moreover, a local estimation method is introduced to adjust the weights of the quadratic polynomial regression function to improve the model accuracy. Finally, the proposed method is applied to predict the SVI values in a real wastewater treatment process(WWTP). The experimental results demonstrate that the proposed MLQPR method has faster testing speed and more accurate results than some existing methods.
基金Supported by the College of Scientific Innovation Significant Cultivation Fund Financing Projects(No.708047)the Key Special Program for Pollution Control(No.2012ZX07101-003)
文摘In this study,the activated sludge model implemented in the BioWin software was validated against full-scale wastewater treatment plant data. Only two stoichiometric parameters(Y p /acetic and the heterotrophic yield(Y H)) required calibration. The value 0.42 was used for Yp /acetic in this study,while the default value of the BioWin software is 0.49,making it comparable with the default values of the corresponding parameter(yield of phosphorus release to substrate uptake(YPO4)) used in ASM2,ASM2 d,and ASM3 P,respectively. Three scenarios were evaluated to improve the performance of the wastewater treatment plant,the possibility of wasting sludge from either the aeration tank or the secondary clarifier,the construction of a new oxidation ditch,and the construction of an equalization tank. The results suggest that construction of a new oxidation ditch or an equalization tank for the wastewater treatment plant is not necessary. However,sludge should be wasted from the aeration tank during wet weather to reduce the solids loading of the clarifiers and avoid effluent violations. Therefore,it is recommended that the design of wastewater treatment plants(WWTPs) should include flexibility to operate the plants in various modes. This is helpful in selection of the appropriate operating mode when necessary,resulting in substantial reductions in operating costs.