期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于抗旱应急提水工程规划设计研究
1
作者 张姿 《中文科技期刊数据库(引文版)工程技术》 2024年第8期0177-0180,共4页
随着某县S镇人口的持续增长,当地对水资源的需求量和质量要求不断提升,现有的供水系统在极端干旱条件下已无法充分满足居民和畜牧业的水需求。为了有效应对特殊干旱年份的用水挑战,针对S镇的人口增长和用水需求进行了详细分析。基于此,... 随着某县S镇人口的持续增长,当地对水资源的需求量和质量要求不断提升,现有的供水系统在极端干旱条件下已无法充分满足居民和畜牧业的水需求。为了有效应对特殊干旱年份的用水挑战,针对S镇的人口增长和用水需求进行了详细分析。基于此,设计了包括黄河大口井、泵站、管道系统及蓄水池在内的综合供水方案。此外,在S镇还新建了一项黄河抗旱应急提水工程,用于保障该工程能够顺利完、并持续运行,使居民生活与生产用水的稳定供应成为可能。 展开更多
关键词 抗旱应急提水工程 水源抽取 调蓄水池 调蓄水池
下载PDF
Water Resource Management in the Intermountain Izeh Plain,Southwest of Iran 被引量:1
2
作者 Kalantari.N Pawar.N.J Keshavarzi.M.R 《Journal of Mountain Science》 SCIE CSCD 2009年第1期25-41,共17页
Ever growing demand for water for agricultural activities in the Izeh Plain has enhanced the use of groundwater. Due to enormous groundwater abstraction since 1985, the overall static water level has receded by more t... Ever growing demand for water for agricultural activities in the Izeh Plain has enhanced the use of groundwater. Due to enormous groundwater abstraction since 1985, the overall static water level has receded by more than 5 meters reflecting that the aquifer is under stress condition. As a result, interest is focused on application of artificial recharge as an option for groundwater management to augment water supply in this area. Therefore, in the present investigations, suitable sites for artificial recharge were selected by an integrated surface and sub-surface assessment of the area. On the basis of the data collected from four target points, it was realized that the selected sites for artificial recharge could not meet water demand of the area. In this study attention was also paid to utilization of the existing Miangran Lake water as an alternative to combat water shortage for irrigation. The study further indicated that the available Miangran Lake water could be used for irrigation of the reclaimed agricultural land and enabling to convert 20o0 hectares of rain-fed land into irrigation. The total cost to utilize lake water is US$ 2,756,729 and it was estimated that the project could recoup the investment within 5 years which is quite reasonable in this water scarcity prone area. 展开更多
关键词 Artificial recharge STREAM MiangranLake GROUNDWATER Izeh Plain
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部