期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
石泉水电厂大坝变形观测资料分析
1
作者 徐建光 牛汉德 朱战齐 《西北电力技术》 2000年第2期41-44,57,共5页
根据石泉水电厂大坝变形监测资料 ,分析了坝体变形规律及发展趋势 ,探讨了各环境量对坝体变形的影响 ,并就重点坝段建立了统计预报模型 ,最后对大坝的变形性态做出评价。分析认为 :石泉大坝变形观测布置过于简单 ,又存在垂直位移基点下... 根据石泉水电厂大坝变形监测资料 ,分析了坝体变形规律及发展趋势 ,探讨了各环境量对坝体变形的影响 ,并就重点坝段建立了统计预报模型 ,最后对大坝的变形性态做出评价。分析认为 :石泉大坝变形观测布置过于简单 ,又存在垂直位移基点下沉 ,水平位移观测精度偏低等问题 。 展开更多
关键词 混凝土 大坝 变形观测资料 水电厂分析
下载PDF
Long-term stability analysis of large-scale underground plant of Xiangjiaba hydro-power station 被引量:3
2
作者 徐卫亚 聂卫平 +3 位作者 周先齐 石崇 王伟 冯树荣 《Journal of Central South University》 SCIE EI CAS 2011年第2期511-520,共10页
Numerical analysis of the optimal supporting time and long-term stability index of the surrounding rocks in the underground plant of Xiangjiaba hydro-power station was carried out based on the rheological theory. Firs... Numerical analysis of the optimal supporting time and long-term stability index of the surrounding rocks in the underground plant of Xiangjiaba hydro-power station was carried out based on the rheological theory. Firstly,the mechanical parameters of each rock group were identified from the experimental data; secondly,the rheological calculation and analysis for the cavern in stepped excavation without supporting were made; finally,the optimal time for supporting at the characteristic point in a typical section was obtained while the creep rate and displacement after each excavation step has satisfied the criterion of the optimal supporting time. Excavation was repeated when the optimal time for supporting was identified,and the long-term stability creep time and the maximum creep deformation of the characteristic point were determined in accordance with the criterion of long-term stability index. It is shown that the optimal supporting time of the characteristic point in the underground plant of Xiangjiaba hydro-power station is 5-8 d,the long-term stability time of the typical section is 126 d,and the corresponding largest creep deformation is 24.30 mm. While the cavern is supported,the cavern deformation is significantly reduced and the stress states of the surrounding rock masses are remarkably improved. 展开更多
关键词 large-scale underground plant rheological mechanics optimal supporting time maximum creep deformation long-termstability long-term strength
下载PDF
Effect of Modeling Range on Structural Analysis for Powerhouse of Hydroelectric Power Plant by FEM 被引量:1
3
作者 张启灵 伍鹤皋 杨华全 《Transactions of Tianjin University》 EI CAS 2009年第5期388-392,共5页
In this paper,three different modeling ranges were selected in the structural analysis for a hydropower house.The analysis was carried out using ABAQUS 6.6.The modeling range has a remarkable effect on finite element ... In this paper,three different modeling ranges were selected in the structural analysis for a hydropower house.The analysis was carried out using ABAQUS 6.6.The modeling range has a remarkable effect on finite element method(FEM) calculation result at the middle position of typical cross-sections where the concrete is relatively thin,and at the region close to turbine floor.If the ventilation barrel,floor slabs and columns above turbine floor are excluded from FEM model,the maximum rise difference of pedestal structure increases by about 24% compared with that of the whole model.It is indicated that different modeling ranges indeed affect FEM calculation result,and the structure above turbine floor in the FEM model should be included. 展开更多
关键词 hydraulic structures hydroelectric power plants POWERHOUSE modeling range FEM structural analysis
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部