Hydro generators installed in Itaipu Binacional power plant with 824/737 MVA rated output power (50/60 Hz) belong to the largest ones in the world. Among many unique features, the generators are equipped with the la...Hydro generators installed in Itaipu Binacional power plant with 824/737 MVA rated output power (50/60 Hz) belong to the largest ones in the world. Among many unique features, the generators are equipped with the largest hydrodynamic thrust bearings ever built (external diameter 5,200 mm, axial load equals approximately 3,600 t). This paper is an attempt to propose a new thrust bearing design with the use of the state-of-the-art technologies and simulation techniques that demonstrate a reduction of friction power losses generated by the thrust bearing. This paper is divided into two parts. Within the first one, the original thrust bearing design which was implemented in the generators is described. Related calculation results based on a TEHD (thermo-elasto-hydrodynamic) calculation software used by Alstom will be presented. A comparison between measurement results gathered in the 1980s is given. In the second part, a potential solution of a more beneficial bearing design is described. The proposed thrust bearing design modification is an implementation of Alstom's PolypadTM coating. This modern polymer (PEEK) coating material has already been used by Alstom in projects around the world for many years. This coating allows pushing the operating parameters limits toward higher temperatures and lower oil film thicknesses far beyond the limits known for the conventional bearing materials.展开更多
The mountainous region of Fthia, identified with the Valley of Sperchios River, in Central Greece, is rich in small watercourses and generously blessed with water and abundant water falls. The geographical configurati...The mountainous region of Fthia, identified with the Valley of Sperchios River, in Central Greece, is rich in small watercourses and generously blessed with water and abundant water falls. The geographical configuration of Olympus and Fthia's mounts and the hydraulic singularities of drained lakes Askouris in Olympus, favour the installation of series of sustainable small hydroelectric plants. The present action consists of a serious effort towards the systematic sustainable small hydropower exploitation of Fthia's and Olympus hydraulic potential, including the Archimedean hydropower perspectives of Sperchios River.展开更多
Electricity generation generally is made in thermal, hydro, geothermal power plants and windfarms/windparks. Because of some advantages such as renewability, low-cost, clean, safe and naturality geothermal and wind en...Electricity generation generally is made in thermal, hydro, geothermal power plants and windfarms/windparks. Because of some advantages such as renewability, low-cost, clean, safe and naturality geothermal and wind energy will have been electricity generation source in the near future. Turkey has hot water springs suitable for electricity generation between 130-242 ~C with natural vapor and hydrothermal alterations in connection with grabens limited to active faults and diffuse young volcanism in Western Anatolia Region. Other renewable energy and electricity generation resource is wind energy. In Turkey electricity generation is made by windfarms/windparks. These parks/farms are generated 1,414.55 MW electricity. The year 2010 electricity general total installed capacity in Turkey is about 49,524.1 MW. According to the total installed capacity, thermal power plants have 65.18%, hydro power plants have 31.97%, geothermal power plants and wind farms have 2.85%. Electricity generation generally was obtained from 15 thermal power plants. In this study high temperature geothermal fields and windparks/windfarms in Turkey which are suitable for electricity generation potential were investigated.展开更多
This paper presents the modelling, simulation and analysis of the dynamic behaviour of a mixed power network of 2.78 GW including hydro, thermal and wind power plants. The modelling of each power plant is described. T...This paper presents the modelling, simulation and analysis of the dynamic behaviour of a mixed power network of 2.78 GW including hydro, thermal and wind power plants. The modelling of each power plant is described. The set of parameters of the turbine speed governor of the hydroelectric power plant is determined with a specific identification procedure to achieve stable operation for different cases such as interconnected, isolated or islanded operation. The analysis of the stability of the entire mixed islanded power plant is investigated through time domain simulations for different sets of controllers parameters and for different disturbances (load rejection and turbulent wind speed profile).展开更多
Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants a...Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants are being faced with requirements for which they do not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer. In this scenario the objective is to maximize the hydroelectric power plant profit from selling energy in the spot market or by means of bilateral contracts. In this paper the optimal operation of a head-dependent hydroelectric power station in bilateral market-short-term hourly hydro resource scheduling for energy is obtained.展开更多
The research object was high 120 m concrete gravity dam of the Angara Bratsk hydroelectric power plant. The state of the concrete dam is estimated based on the results of continuous supervision performed by site perso...The research object was high 120 m concrete gravity dam of the Angara Bratsk hydroelectric power plant. The state of the concrete dam is estimated based on the results of continuous supervision performed by site personnel as well as periodic monitoring. According to the classification of the interrelations in the system "concrete-environment", there were selected some important parts of dams and a comprehensive analysis of concrete was executed on these parts. Concerning the complex research of concrete, a combination of full-scale tests with core-sampling has been proposed. Core samples tests had an object to study the deep concrete layers and to determine the specific indicators such as strength, density, porosity, comparative diameter of capillary pores, CaO content in cement stone and others. Obtained findings and recommended criteria can be applied when selecting technologies for constructing dams that guarantee their durability in the north.展开更多
In many developing countries, there are regions where the electrical grid is weak or nonexistent. However, in these areas, large amounts of distributed energy sources, such as hydro, are often available and could be s...In many developing countries, there are regions where the electrical grid is weak or nonexistent. However, in these areas, large amounts of distributed energy sources, such as hydro, are often available and could be suitably exploited. To this aim, the low head hydro power plants can play a significant role. In fact, recent technological advances in mini-hydro turbines and decreasing costs of static electricity conversion devices enable to realize suitable power plants for an efficient and profitable exploitation of these sites. One of the major challenges is the integration of the above-mentioned power plants into autonomous electrical systems, islanded and/or disconnectable from the main distribution network. In this paper, an innovative control strategy for a low head hydro power plant supplying users in small clusters of villages is proposed.展开更多
Most of the MHP (micro hydro power) plants use ELC (electronic load controller) for speed control. Various types of ELC have been developed so far. A dummy ballast load is connected across each phase of generator ...Most of the MHP (micro hydro power) plants use ELC (electronic load controller) for speed control. Various types of ELC have been developed so far. A dummy ballast load is connected across each phase of generator terminals and ELC controls the power consumed by the ballast load to result in constant speed operation. The ELC developed so far uses thyristor switches in each phase to control ballast load power. The ELC senses the system frequency and comparing it with reference frequency, it generates a common value of firing angle for all three thyristor pairs of each phase. The performance of such ELC is not perfect for unbalanced consumers load connected in each phase, which overloads the generator. This paper presents an advanced type of ELC which senses frequency as well as consumer's load current of each phase and fires the thyristor pairs with different value of firing angles for different phases. This solves the problem of overloading of the generator with unbalanced consumer's load. Simutink model is developed to perform transient analysis of the proposed scheme and the prototype of hardware is also fabricated. The simulation results and experimental results are presented.展开更多
Excitation system is one of the significant elements affecting the dynamic performance of electric power systems. The power engineering as area of science and industry is subjected to rapid modernization, which is cau...Excitation system is one of the significant elements affecting the dynamic performance of electric power systems. The power engineering as area of science and industry is subjected to rapid modernization, which is caused by technological progress. However, not all elements of the power system are developing simultaneously. The old type of elements sometimes is sufficient to adapt old system to the new operational conditions. The work developed and proposed in this paper deals with analysis of possible optimization of synchronous generator's excitation system. Authors examined influence of excitation system's parameters to the dynamics of transient processes in the power system. Authors investigated optimal parameters of excitation system of the Kegums hydro power plant. For optimization of parameters objective functions were used. The problem of the mutual influence of excitation systems of neighbor power plants was investigated. Investigation of transient processes using developed model proved that optimization of excitation parameters improves efficiency of regulation of excitation system, damping of active power oscillation and in some cases can prevent out-of-step condition.展开更多
文摘Hydro generators installed in Itaipu Binacional power plant with 824/737 MVA rated output power (50/60 Hz) belong to the largest ones in the world. Among many unique features, the generators are equipped with the largest hydrodynamic thrust bearings ever built (external diameter 5,200 mm, axial load equals approximately 3,600 t). This paper is an attempt to propose a new thrust bearing design with the use of the state-of-the-art technologies and simulation techniques that demonstrate a reduction of friction power losses generated by the thrust bearing. This paper is divided into two parts. Within the first one, the original thrust bearing design which was implemented in the generators is described. Related calculation results based on a TEHD (thermo-elasto-hydrodynamic) calculation software used by Alstom will be presented. A comparison between measurement results gathered in the 1980s is given. In the second part, a potential solution of a more beneficial bearing design is described. The proposed thrust bearing design modification is an implementation of Alstom's PolypadTM coating. This modern polymer (PEEK) coating material has already been used by Alstom in projects around the world for many years. This coating allows pushing the operating parameters limits toward higher temperatures and lower oil film thicknesses far beyond the limits known for the conventional bearing materials.
文摘The mountainous region of Fthia, identified with the Valley of Sperchios River, in Central Greece, is rich in small watercourses and generously blessed with water and abundant water falls. The geographical configuration of Olympus and Fthia's mounts and the hydraulic singularities of drained lakes Askouris in Olympus, favour the installation of series of sustainable small hydroelectric plants. The present action consists of a serious effort towards the systematic sustainable small hydropower exploitation of Fthia's and Olympus hydraulic potential, including the Archimedean hydropower perspectives of Sperchios River.
文摘Electricity generation generally is made in thermal, hydro, geothermal power plants and windfarms/windparks. Because of some advantages such as renewability, low-cost, clean, safe and naturality geothermal and wind energy will have been electricity generation source in the near future. Turkey has hot water springs suitable for electricity generation between 130-242 ~C with natural vapor and hydrothermal alterations in connection with grabens limited to active faults and diffuse young volcanism in Western Anatolia Region. Other renewable energy and electricity generation resource is wind energy. In Turkey electricity generation is made by windfarms/windparks. These parks/farms are generated 1,414.55 MW electricity. The year 2010 electricity general total installed capacity in Turkey is about 49,524.1 MW. According to the total installed capacity, thermal power plants have 65.18%, hydro power plants have 31.97%, geothermal power plants and wind farms have 2.85%. Electricity generation generally was obtained from 15 thermal power plants. In this study high temperature geothermal fields and windparks/windfarms in Turkey which are suitable for electricity generation potential were investigated.
文摘This paper presents the modelling, simulation and analysis of the dynamic behaviour of a mixed power network of 2.78 GW including hydro, thermal and wind power plants. The modelling of each power plant is described. The set of parameters of the turbine speed governor of the hydroelectric power plant is determined with a specific identification procedure to achieve stable operation for different cases such as interconnected, isolated or islanded operation. The analysis of the stability of the entire mixed islanded power plant is investigated through time domain simulations for different sets of controllers parameters and for different disturbances (load rejection and turbulent wind speed profile).
文摘Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants are being faced with requirements for which they do not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer. In this scenario the objective is to maximize the hydroelectric power plant profit from selling energy in the spot market or by means of bilateral contracts. In this paper the optimal operation of a head-dependent hydroelectric power station in bilateral market-short-term hourly hydro resource scheduling for energy is obtained.
文摘The research object was high 120 m concrete gravity dam of the Angara Bratsk hydroelectric power plant. The state of the concrete dam is estimated based on the results of continuous supervision performed by site personnel as well as periodic monitoring. According to the classification of the interrelations in the system "concrete-environment", there were selected some important parts of dams and a comprehensive analysis of concrete was executed on these parts. Concerning the complex research of concrete, a combination of full-scale tests with core-sampling has been proposed. Core samples tests had an object to study the deep concrete layers and to determine the specific indicators such as strength, density, porosity, comparative diameter of capillary pores, CaO content in cement stone and others. Obtained findings and recommended criteria can be applied when selecting technologies for constructing dams that guarantee their durability in the north.
文摘In many developing countries, there are regions where the electrical grid is weak or nonexistent. However, in these areas, large amounts of distributed energy sources, such as hydro, are often available and could be suitably exploited. To this aim, the low head hydro power plants can play a significant role. In fact, recent technological advances in mini-hydro turbines and decreasing costs of static electricity conversion devices enable to realize suitable power plants for an efficient and profitable exploitation of these sites. One of the major challenges is the integration of the above-mentioned power plants into autonomous electrical systems, islanded and/or disconnectable from the main distribution network. In this paper, an innovative control strategy for a low head hydro power plant supplying users in small clusters of villages is proposed.
文摘Most of the MHP (micro hydro power) plants use ELC (electronic load controller) for speed control. Various types of ELC have been developed so far. A dummy ballast load is connected across each phase of generator terminals and ELC controls the power consumed by the ballast load to result in constant speed operation. The ELC developed so far uses thyristor switches in each phase to control ballast load power. The ELC senses the system frequency and comparing it with reference frequency, it generates a common value of firing angle for all three thyristor pairs of each phase. The performance of such ELC is not perfect for unbalanced consumers load connected in each phase, which overloads the generator. This paper presents an advanced type of ELC which senses frequency as well as consumer's load current of each phase and fires the thyristor pairs with different value of firing angles for different phases. This solves the problem of overloading of the generator with unbalanced consumer's load. Simutink model is developed to perform transient analysis of the proposed scheme and the prototype of hardware is also fabricated. The simulation results and experimental results are presented.
文摘Excitation system is one of the significant elements affecting the dynamic performance of electric power systems. The power engineering as area of science and industry is subjected to rapid modernization, which is caused by technological progress. However, not all elements of the power system are developing simultaneously. The old type of elements sometimes is sufficient to adapt old system to the new operational conditions. The work developed and proposed in this paper deals with analysis of possible optimization of synchronous generator's excitation system. Authors examined influence of excitation system's parameters to the dynamics of transient processes in the power system. Authors investigated optimal parameters of excitation system of the Kegums hydro power plant. For optimization of parameters objective functions were used. The problem of the mutual influence of excitation systems of neighbor power plants was investigated. Investigation of transient processes using developed model proved that optimization of excitation parameters improves efficiency of regulation of excitation system, damping of active power oscillation and in some cases can prevent out-of-step condition.