期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
太平哨水电站溢流闸门冬季抬起的原因浅析及处理
1
作者 卢庆祥 《水力发电》 北大核心 1989年第11期77-77,共1页
太平哨水电站是浑江干流上第三级电站,地处东北严寒地带,坝区多年平均最低气温为零下30℃,冰期4个月,即每年12月中上旬至翌年4月中旬,库面历年覆雪。大坝全长555.6m,水库正常高水位191.5m,在3号~23号溢流坝段布置20孔12×10.
关键词 水电平站 溢流闸门 闸门 抗冻处理
下载PDF
A Technical Review of Hydro-Project Development in China 被引量:36
2
作者 Rafael Duarte António Pinheiro Anton J. Schleiss 《Engineering》 SCIE EI 2016年第3期302-312,共11页
This paper summarizes the development of hydro-projects in China,blended with an international perspective.It expounds major technical progress toward ensuring the safe construction of high dams and river harnessing,a... This paper summarizes the development of hydro-projects in China,blended with an international perspective.It expounds major technical progress toward ensuring the safe construction of high dams and river harnessing,and covers the theorization of uneven non-equilibrium sediment transport,inter-basin water diversion,giant hydro-generator units,pumped storage power stations,underground caverns,ecological protection,and so on. 展开更多
关键词 DamRiver harnessingWater diversionPumped storage power stationUnderground cavernEcological protection
下载PDF
Optimal operation of cascaded hydroelectric power plants in the power market
3
作者 蔡兴国 马平 林士颖 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2004年第6期614-617,共4页
An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electric... An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants. 展开更多
关键词 cascaded hydroelectric power plants network flow market clearing price
下载PDF
High Slope Stability of Diversion Power System Intake of Jinchuan Hydropower Station 被引量:1
4
作者 TANG Liang-qin TANG Kui +2 位作者 NIE De-xin WANG Jun-jie LIU Dong-yan 《Journal of Mountain Science》 SCIE CSCD 2013年第6期1109-1117,共9页
The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization b... The excavated height of the left bank slope of the diversion power system intake in Jinchuan hydropower station is about 16o m. The stability and safety of the slope during construction and its operation/utilization become one of the most important geological engineering problems. At the same time, it is also crucial to select a safe and economic excavation gradient for the construction. We studied the problem of how to select a safe and economic slope ratio by analyzing the geological condition of the high slope, including the lithology, slope structure, structural surface and their combinations, rock weathering and unloading, hydrology, and the natural gradient. The study results showed that the use of an excavation gradient larger than the gradient observed during site investigation and the gradient recommended in standards and field practice manuals is feasible. Then, we used the finite element method and rigid limit equilibrium method to evaluate the stability of the excavation slope under natural, rainstorm and earthquake conditions. The calculated results showed that the excavated slope only has limited failure, but its stability is greatly satisfactory. The research findings can be useful in excavation and slope stabilization projects. 展开更多
关键词 Jinchuan Hydropower Station Highslope Excavation slope ratio STABILITY
下载PDF
An Empirical Study of Characteristics of the Spatial Distribution of Taobao Travel Intemet Store
5
作者 Wenjie Wang 《International English Education Research》 2014年第3期34-37,共4页
The development of tourism depends on the development of physical stores and the level of economic development of tourism, distribution, and analysis of the main research shop this virtual store. In this study, based ... The development of tourism depends on the development of physical stores and the level of economic development of tourism, distribution, and analysis of the main research shop this virtual store. In this study, based on China's largest e-commerce website --- Taobao C2C data to the country's 31 provinces, autonomous regions and municipalities (excluding Hung Kong, Macao and Taiwan) for the study, and regression analysis using ArcGIS software tools, from the provincial tourism C2C e-commerce Factors affecting the development of conduct Regression analysis, and An Empirical Study of the geographical distribution of the electrons. The results showed that the development of China's tourism e-commerce C2C level and the level of tourism development and local economic development are very relevant. The degree of economic development and the level of development of tourism and travel Taobao C2C e number of shops are highly correlated. 展开更多
关键词 TAOBAO Tourism E-Shop Spatial Distribution Data Analysis
下载PDF
Test Facility for Low Potential Pumped Storage Power Plants and Hydrokinetic Turbines
6
作者 Dominik Surek 《Journal of Energy and Power Engineering》 2013年第11期2037-2044,共8页
The electric energy which is generated by wind power plants depends on the wind speed and exceeds with strong permissible wind speed the electric energy requirements of the country. In order not to reduce this electri... The electric energy which is generated by wind power plants depends on the wind speed and exceeds with strong permissible wind speed the electric energy requirements of the country. In order not to reduce this electrical energy, it must be stored. The sensible energy storage is currently the pumped storage power plants. As the mountain ranges for conventional pumped storage power plants with drop heights of H 〉 600 m are strictly limited, the development of low potential pumped storage power plants has begun. Increasing the capacity of pumped storage power plants with regard to the wind power plants is urgently needed. In this paper, it is shown using the example of an unneeded port facility, how a port facility can be used after low conversion as a test facility for low potential pumped storage power plants and at the same time for the testing of hydro-kinetic turbines. This type of pump storage power plants does not save the energy due to large drop heights, but primarily due to the large volume flow of water. 展开更多
关键词 Energy storage pumped storage power plant wind energy photovoltaic.
下载PDF
Operation characteristics of AMS-02 loop heat pipe with bypass valve 被引量:6
7
作者 WANG NaiHua Joseph BURGER +6 位作者 LUO Feng CUI Zheng XIN GongMin DU WenJing SONG JiWei CHEN Yan CHENG Lin 《Science China(Technological Sciences)》 SCIE EI CAS 2011年第7期1813-1819,共7页
Loop heat pipes (LHPs) were designed for the alpha magnetic spectrometer (AMS-02) to dissipate heat from the cryocoolers. A bypass valve is applied to the LHP to keep the cryocooler temperature above its limit (... Loop heat pipes (LHPs) were designed for the alpha magnetic spectrometer (AMS-02) to dissipate heat from the cryocoolers. A bypass valve is applied to the LHP to keep the cryocooler temperature above its limit (-20℃) in cold environment. Extensive experiments were performed on operation characteristics of LHPs with the bypass valve for AMS-02 during thermal vacuum and thermal balance (TVTB) test. We found that the bypass valve can start up successfully in cold environment. With the bypass valve, the evaporator temperature is stable and can meet the requirement of the cryocooler. We analyzed three operating modes of the bypass valve. Set point temperature and regulation temperature shifts were observed and their relations with the bypass valve temperature were given. 展开更多
关键词 alpha magnetic spectrometer loop heat pipe bypass valve operation characteristic
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部