期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
快速锚固技术在预应力锚索施工中的应用 被引量:5
1
作者 谷建国 姜东民 +1 位作者 雷浪法 李丙寅 《水力发电》 EI 北大核心 1998年第2期37-39,51,共4页
在李家峡水电站高边坡开挖实践中,通过室内和现场生产试验,成功地将1000kN级预应力锚索快速锚固技术应用于工程中,取得了3d~5d龄期施加预应力的锚固效果。该项技术对于加快岩质高边坡开挖速度,有效地防止边坡塌滑起到关... 在李家峡水电站高边坡开挖实践中,通过室内和现场生产试验,成功地将1000kN级预应力锚索快速锚固技术应用于工程中,取得了3d~5d龄期施加预应力的锚固效果。该项技术对于加快岩质高边坡开挖速度,有效地防止边坡塌滑起到关键的作用。体现了“快速、经济、安全”的特点。 展开更多
关键词 预应力锚索 锚固 施工技术 高边坡 水电站基础
下载PDF
A Study on Additional Electric Energy Accommodation of Three Gorges Hydropower Station 被引量:1
2
作者 Chen Zheng Lin Tingwei +2 位作者 Li Ke Xia Kai Wang Xue 《Electricity》 2011年第1期29-33,共5页
Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on... Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on the additional electricity accommodation, based on the research at the earl), stage. The electric energ), accommodation solutions ate recommended as that. based on the cost-benefit analysis of the power distribution area, the additional electric energy of the Three Gorges should be given ptqority to meet the needs at the supply end of Hubei and Chongqing. The results of this research has a reference value on the implementation of the Three Gorges electric power accommodation, after the further optimization of the transmission curves in both wet and dry seasons. 展开更多
关键词 Three Gorges Hydropower Station electric energy accommodation cost-benefit analysis
下载PDF
Filtration Features in the Base of the Bratsk HPP (Hydroelectric Power Station) Concrete Dam
3
作者 Mark A. Sadovich Tatyana F. Shlyakhtina +2 位作者 Anna M. Kuritsyna Anastasia A. Shkuleva Irina S. Semenova 《Journal of Civil Engineering and Architecture》 2018年第8期543-549,共7页
The design protection of the base of the Bratsk HPP (Hydroelectric Power Station) dam from filtration coming from the water reservoir included the arrangement of several cement-grout curtains and the system of drain... The design protection of the base of the Bratsk HPP (Hydroelectric Power Station) dam from filtration coming from the water reservoir included the arrangement of several cement-grout curtains and the system of drainage holes in the 2nd and 4th columns. During operation, increased hydrostatic back pressure at the base of the dam was found, which indicated the low efficiency of the base design protection. To reduce back pressure B. E. Vedeneev Hydro Technic Institute proposed the device of “advanced” drainage holes from the cement-grout gallery near the upstream face. The implementation of the proposal in a number of sections of the dam has led to a decrease in back pressure, but affected filtration in the drainage system, increasing it significantly. The article examines filtration features of “advanced” drainage holes and their dependence on the severity of winters. The spread of the practice of “advanced” drainage in other sections of the dam requires caution and further investigations of the nature of filtration. 展开更多
关键词 Cement-grout curtain base drainage back pressure “advanced” drainage BOREHOLE seepage discharge filtration mode.
下载PDF
发挥基层水管站作用搞好新农村水利建设
4
作者 日亚汗·亚森 《河北农机》 2021年第12期165-166,共2页
近年来,随着撤村并镇改革的实施,基层水利管理面临诸多问题。为促进农村水利建设发展,基层水利管理站的建设和管理要围绕管理体制,不断完善人员知识结构,提高服务能力。因此,在这样的背景下,笔者就如何发挥基层水利管理站的作用,促进农... 近年来,随着撤村并镇改革的实施,基层水利管理面临诸多问题。为促进农村水利建设发展,基层水利管理站的建设和管理要围绕管理体制,不断完善人员知识结构,提高服务能力。因此,在这样的背景下,笔者就如何发挥基层水利管理站的作用,促进农村水利建设进行了详细的探讨。首先,笔者对基础水站的功能和作用进行了简要概述。其次,总结了基层供水站管理中存在的问题。最后,针对普遍存在的问题,提出了一些有针对性的对策,以发挥基层水利管理站的作用,促进水利建设。 展开更多
关键词 基础水电站 农村 水利建设
下载PDF
Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market
5
作者 S.J.P.S. Mariano M.R.A. Calado L.A.F.M. Ferreira 《Journal of Energy and Power Engineering》 2011年第5期466-473,共8页
Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants a... Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants are being faced with requirements for which they do not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer. In this scenario the objective is to maximize the hydroelectric power plant profit from selling energy in the spot market or by means of bilateral contracts. In this paper the optimal operation of a head-dependent hydroelectric power station in bilateral market-short-term hourly hydro resource scheduling for energy is obtained. 展开更多
关键词 Hydroelectric power generation hydroelectric generators optimization methods electricity market.
下载PDF
Mechanical characteristics of columnar jointed rock at dam base of Baihetan hydropower station
6
作者 闫东旭 徐卫亚 +3 位作者 郑文棠 王伟 石安池 吴关叶 《Journal of Central South University》 SCIE EI CAS 2011年第6期2157-2162,共6页
Irregular columnar jointed structure is a primary irregular columnar morphological tensile fracture. In order to study the geometric features of irregular columnar joints and the new problems in geotechnical engineeri... Irregular columnar jointed structure is a primary irregular columnar morphological tensile fracture. In order to study the geometric features of irregular columnar joints and the new problems in geotechnical engineering, hydraulic and hydropower engineering caused by columnar jointed basaltic mass, Voronoi graph from geometry was introduced to simulate the irregular columnar jointed basaltic mass at Baihetan hydraulic station. Discrete element software UDEC was used to simulate the whole process of rigid bearing plate test. Anisotropic constitutive of columnar joints was adopted to analyze the stress diffusion of rock mass at dam base of Baihetan. The results show that, the compaction property and hysteresis effect are well simulated based on discrete element simulation of Voronoi joint structure by UDEC. Four stages of cyclic loading and unloading process are imaged clearly. The results from in situ rigid bearing plate tests are explicated and the stress diffusion rule of anisotropic body is affected by structure surface. The elements in the stress state of 4-5 MPa are the most, about more than 35% of the total. Appropriate constitutive must be proposed to columnar jointed rock mass with different styles. It has important significance to realize the nonlinear mechanical behavior of irregular columnar jointed basaltic mass. 展开更多
关键词 columnar joints Voronoi graph discrete element method hysteresis effect Baihetan hydropower station stressdiffusion
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部