This paper describes pure water making equipment by using applicable datebase, computer languages and drawing software. It gives a general introduction to the systematic designing plan, the division of the different...This paper describes pure water making equipment by using applicable datebase, computer languages and drawing software. It gives a general introduction to the systematic designing plan, the division of the different parts and their functions, and the pure water making technological process.展开更多
To reveal the influencing factors and changing rules for the hydrothermal interaction process of highway subgrade, the field measurements of Shiwei-Labudalin Highway in Inner Mongolia, China was conducted for 3 years,...To reveal the influencing factors and changing rules for the hydrothermal interaction process of highway subgrade, the field measurements of Shiwei-Labudalin Highway in Inner Mongolia, China was conducted for 3 years, based on which the freezing-thawing rules and water content changing characteristics were analyzed. The main results show the subgrade presents a frequent freezing-thawing alternation, and the water content of subgrade exhibits an obvious seasonal alternation. The subbase has the maximum water content, while the base has the minimum water content. The change of water flux is concentrated in the thawing period and consistent with the change of temperature gradient. The subbase layer has the most active water flux due to the heat absorption and impermeability of pavement that easily causes the water accumulation in this layer. Therefore, the prevention and treatment for the freezing-thawing disease should be started from heat insulation and water resistance.展开更多
In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydr...In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydropower projects in deep river valley,the stabilization techniques for underground cavern group with large span and high side walls are introduced in this paper.As for rock engineering and technology in highway and railway construction,the Qinghai-Tibet Railway — new construction techniques in permafrost,the support techniques for large squeezing deformation in Wuqiaoling Tunnel,the construction techniques for tunnels in alpine and high-altitude region,the geological prediction techniques for tunnels in karst region,the microseismic monitoring and early warning techniques for rockbursts in deep and long tunnels are presented.For rock engineering and technology inmining engineering,the innovative techniques for roadway support inmines,the simultaneous extraction technique of pillarless coal and gas in coal seams with low permeability,the safe and efficient deep openmining technology,advances in monitoring,early warning and treatment ofmine dynamic disasters are discussed.In addition,the new anchorage techniques and precision blasting technique in rock engineering are introduced.展开更多
Cement production is characterized by its great capacity, long-time delay, multi variables, difficult measurement and multi disturbances. According to the distributed intelligent control strategy based on the multi (a...Cement production is characterized by its great capacity, long-time delay, multi variables, difficult measurement and multi disturbances. According to the distributed intelligent control strategy based on the multi (agent,) the multi agent control system of cement production is built, which includes integrated optimal control and diagnosis control. The distributed and multiple level structure of multi agent system for the cement control is studied. The optimal agent is in the distributed state, which aims at the partial process of the cement production, and forms the optimal layer. The diagnosis agent located on the diagnosis layer is the diagnosis unit which aims at the whole process of the cement production, and the central management unit of the system. The system cooperation is realized by the communication among optimal agents and diagnosis agent. The architecture of the optimal agent and the diagnosis agent are designed. The detailed functions of the optimal agent and the diagnosis agent are analyzed. At last the realization methods of the agents are given, and the application of the multi agent control system is presented. The multi agent system has been successfully applied to the off-line control of one cement plant with capacity of 5 000 t/d. The results show that the average yield of the clinker increases 9.3% and the coal consumption decreases 7.5 kg/t.展开更多
Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigatio...Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.展开更多
In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equip...In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equipment manufacture and ecological environment protection.In view of the key techniques and difficulties in the construction period,scientific and technological breakthroughs have been made by the experts and scholars of various fields and a series of innovative achievements are gained,which make the scientific and technological levels in relevant fields improved.Some major innovative achievements in the construction and operation of TGP are enumerated,which are significant for the hydropower project construction and clean energy development in the future in China.展开更多
The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and the largest water resources and hydropower project constructed in China.The impoundment of Three Gorges Reservoir reached ...The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and the largest water resources and hydropower project constructed in China.The impoundment of Three Gorges Reservoir reached the design water level of 175 m for the first time on October 26,2010,which indicated that the project had met design requirements of various functionalities of flood control,power generation and navigation.To complete the project it took nearly 100 years for conception,demonstration,design and construction of the TGP.How was the conception of TGP proposed? What kind of role should it be? What were the different opinions? How was the project demonstrated? What was the conclusion of demonstration? Those are the issues that many people care and don't know about.To memorize the realization of the century dream of Chinese people and to record the history of development of TGP,the author presents a compendious introduction to the project.展开更多
Based on analyzing risk factors of diversion project,synthetic risk rate and engineering insurance period,the frequency and distribution law of loss are researched on the grounds that foundation pit is submerged after...Based on analyzing risk factors of diversion project,synthetic risk rate and engineering insurance period,the frequency and distribution law of loss are researched on the grounds that foundation pit is submerged after diversion project ceases to be effective.And then,the standpoint that these total loss is subject to non-homogeneous compound Poisson processes is put forward.Furthermore,the collective risk model of the total loss about engineering insurance is established on the basis of construction diversion project risk.Ultimately,insurance ratemaking method for construction engineering risk and its mathematical expression are presented,which provides theoretical method for the insurance ratemaking of hydropower engineering to some extent.展开更多
The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a c...The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Power Limited Partnership, and civil and tunnel construction was completed by CRT-ebc. The Upper Lillooet River HEF includes the excavation ofa 6 m wide by 5.5 m high and approximately 2500 m long tunnel along the Upper Lillooet River Valley. The project is in a moun- tainous area; severe restrictions imposed by weather conditions and the presence of sensitive wildlife species constrained the site operations in order to limit environmental impacts. The site is adjacent to the Mount Meager Volcanic Complex, the most recently active volcano in Western Canada. Tunneling conditions were very challenging, including a section through deposits associated with the most recent eruption from Mount Meager Volcanic Complex (-2360 years before the present). This tunnel section included welded breccia and unconsolidated deposits composed of loose pumice, organics (that represent an old forest floor), and till, before entering the underlying tonalite bedrock. The construction of this section of the tunnel required cover grouting, umbrella support, and excavation with a combination of road header, hydraulic hammer, and drilling-and-blasting method. This paper provides an overview of the project, a summary of the key design and construction schedule challenges, and a description of the successful excavation of the tunnel through deposits associated with the recent volcanic activity.展开更多
With the rapid development of construction engineering and municipal engineering in recent years, water supply and drainage technology has gradually matured. Building water supply and drainage design contains the desi...With the rapid development of construction engineering and municipal engineering in recent years, water supply and drainage technology has gradually matured. Building water supply and drainage design contains the design of rainwater drainage, sewage drainage design, water supply design and fire water supply design. At present, the research on the life cycle assessment of urban drainage system is mainly focused on the sewage treatment plant, therefore in this paper we introduce the theoretical basis of life cycle assessment. In the era of information network, building information model(BIM) technology is widely applied to the design of building water supply and drainage, which and effectively improves the design effi ciency, and makes up for the traditional water supply and drainage design of a lot of problems. In this paper, we analyze the development trend of water supply and drainage engineering based on life cycle assessment and building information model.展开更多
The scale and characteristics of rock mass are important indexes of the rock mass structural plane classification. This paper firstly analyzes the spatial distribution characteristics, the structural plane types (ori...The scale and characteristics of rock mass are important indexes of the rock mass structural plane classification. This paper firstly analyzes the spatial distribution characteristics, the structural plane types (original structural plane, tectonic structural plane and hypergenic structural plane) and the associated features of the Emeishan basalts and then studies the classification schemes of the built hydropower structure planes of different rock areas (the east district, the central district and the west district) in the Emeishan basalt distribution area, Southwest China. Based on the analysis and comparison of the scale and the engineering geological characteristics of the typical structure planes in the basalt hydroelectric Stations, the types of structural planes are used in the first order classification. The secondary order classification is made by considering the impact factors of rock mass quality, e.g., the state of the structural planes, infilling, joint opening, extending length, the grade of weathering and strength. The engineering geological classification for Emeishan basalt is proposed. Because there are no evidences of a large structure presenting in study area, the first-order (Ⅰ) controlling structural planes do not appear in the classification, there only appear Ⅱ, Ⅲ, Ⅳ and Ⅴ grade structural planes influencing the rock-mass quality. According to the different rock-block types in bedding fault zone, the second-grade (Ⅱ) structural planes consisted of bedding fault zone is further classified into Ⅱ1, Ⅱ2 and Ⅱ3. The third-grade (Ⅲ) structural planes constructed by intraformational faulted zones are not subdivided. According to the different characteristics of intrusion, alteration and weathering unloading structural planes, the Ⅳ grade structure plane is divided into Ⅳ1, Ⅳ2 and Ⅳ3. According to the development characteristics of joints and fractures, the V grade structure plane is divided into fracture Ⅴ1 and columnar joint Ⅴ2. In all, the structural planes are classified into four groups with nine subsets. The research proposes the engineering geological classification of the structural plane for the hydropower project in the Emishan basalts, and the result of the study has a potential application in similar regions.展开更多
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e...In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.展开更多
The Merguellil catchment (central Tunisia) has undergone rapid hydrological changes over the last decades. The most visible signs are a marked decrease in surface runoff in the upstream catchment and a complete chan...The Merguellil catchment (central Tunisia) has undergone rapid hydrological changes over the last decades. The most visible signs are a marked decrease in surface runoff in the upstream catchment and a complete change in the recharge processes of the Kairouan aquifer downstream. Fluctuations in rainfall have had a real but limited hydrological impact. Much more important are the consequences of human activities such as soil and water conservation works, small and large dams, pumping for irrigation. Several independent approaches were implemented: hydrodynamics, thermal surveys, geochemistry including isotopes. They helped to identify the different terms of the regional water balance and to characterize their changes over time.展开更多
文摘This paper describes pure water making equipment by using applicable datebase, computer languages and drawing software. It gives a general introduction to the systematic designing plan, the division of the different parts and their functions, and the pure water making technological process.
基金Project(2018-MSI-018) supported by the Key Science and Technology Project of the Ministry of Transport of ChinaProject(NJ-2018-28) supported by the Construction Science and Technology of the Department of Transport of Inner Mongolia Autonomous Region of China+2 种基金Project(2019MS05029) supported by the Natural Science Fund Project of Inner Mongolia Autonomous Region of ChinaProject(2020MS05077) supported by the Natural Science Fund Project of Inner Mongolia Autonomous Region of ChinaProject(NJ-2020-05) supported by the Research on Complete Survey Technology of Highway Road Area in High-latitude Permafrost Region, China。
文摘To reveal the influencing factors and changing rules for the hydrothermal interaction process of highway subgrade, the field measurements of Shiwei-Labudalin Highway in Inner Mongolia, China was conducted for 3 years, based on which the freezing-thawing rules and water content changing characteristics were analyzed. The main results show the subgrade presents a frequent freezing-thawing alternation, and the water content of subgrade exhibits an obvious seasonal alternation. The subbase has the maximum water content, while the base has the minimum water content. The change of water flux is concentrated in the thawing period and consistent with the change of temperature gradient. The subbase layer has the most active water flux due to the heat absorption and impermeability of pavement that easily causes the water accumulation in this layer. Therefore, the prevention and treatment for the freezing-thawing disease should be started from heat insulation and water resistance.
文摘In terms of rock engineering and technology in hydropower construction,the slope stability and monitoring techniques for high slopes of Three Gorges Project,the stability and support technology for high slopes of hydropower projects in deep river valley,the stabilization techniques for underground cavern group with large span and high side walls are introduced in this paper.As for rock engineering and technology in highway and railway construction,the Qinghai-Tibet Railway — new construction techniques in permafrost,the support techniques for large squeezing deformation in Wuqiaoling Tunnel,the construction techniques for tunnels in alpine and high-altitude region,the geological prediction techniques for tunnels in karst region,the microseismic monitoring and early warning techniques for rockbursts in deep and long tunnels are presented.For rock engineering and technology inmining engineering,the innovative techniques for roadway support inmines,the simultaneous extraction technique of pillarless coal and gas in coal seams with low permeability,the safe and efficient deep openmining technology,advances in monitoring,early warning and treatment ofmine dynamic disasters are discussed.In addition,the new anchorage techniques and precision blasting technique in rock engineering are introduced.
文摘Cement production is characterized by its great capacity, long-time delay, multi variables, difficult measurement and multi disturbances. According to the distributed intelligent control strategy based on the multi (agent,) the multi agent control system of cement production is built, which includes integrated optimal control and diagnosis control. The distributed and multiple level structure of multi agent system for the cement control is studied. The optimal agent is in the distributed state, which aims at the partial process of the cement production, and forms the optimal layer. The diagnosis agent located on the diagnosis layer is the diagnosis unit which aims at the whole process of the cement production, and the central management unit of the system. The system cooperation is realized by the communication among optimal agents and diagnosis agent. The architecture of the optimal agent and the diagnosis agent are designed. The detailed functions of the optimal agent and the diagnosis agent are analyzed. At last the realization methods of the agents are given, and the application of the multi agent control system is presented. The multi agent system has been successfully applied to the off-line control of one cement plant with capacity of 5 000 t/d. The results show that the average yield of the clinker increases 9.3% and the coal consumption decreases 7.5 kg/t.
文摘Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.
文摘In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equipment manufacture and ecological environment protection.In view of the key techniques and difficulties in the construction period,scientific and technological breakthroughs have been made by the experts and scholars of various fields and a series of innovative achievements are gained,which make the scientific and technological levels in relevant fields improved.Some major innovative achievements in the construction and operation of TGP are enumerated,which are significant for the hydropower project construction and clean energy development in the future in China.
文摘The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and the largest water resources and hydropower project constructed in China.The impoundment of Three Gorges Reservoir reached the design water level of 175 m for the first time on October 26,2010,which indicated that the project had met design requirements of various functionalities of flood control,power generation and navigation.To complete the project it took nearly 100 years for conception,demonstration,design and construction of the TGP.How was the conception of TGP proposed? What kind of role should it be? What were the different opinions? How was the project demonstrated? What was the conclusion of demonstration? Those are the issues that many people care and don't know about.To memorize the realization of the century dream of Chinese people and to record the history of development of TGP,the author presents a compendious introduction to the project.
基金Project of the National Eleventh Five-year Research Program of China (No.2008BAB29B02)National Natural Science Foundation of China(No.51079115)
文摘Based on analyzing risk factors of diversion project,synthetic risk rate and engineering insurance period,the frequency and distribution law of loss are researched on the grounds that foundation pit is submerged after diversion project ceases to be effective.And then,the standpoint that these total loss is subject to non-homogeneous compound Poisson processes is put forward.Furthermore,the collective risk model of the total loss about engineering insurance is established on the basis of construction diversion project risk.Ultimately,insurance ratemaking method for construction engineering risk and its mathematical expression are presented,which provides theoretical method for the insurance ratemaking of hydropower engineering to some extent.
文摘The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Power Limited Partnership, and civil and tunnel construction was completed by CRT-ebc. The Upper Lillooet River HEF includes the excavation ofa 6 m wide by 5.5 m high and approximately 2500 m long tunnel along the Upper Lillooet River Valley. The project is in a moun- tainous area; severe restrictions imposed by weather conditions and the presence of sensitive wildlife species constrained the site operations in order to limit environmental impacts. The site is adjacent to the Mount Meager Volcanic Complex, the most recently active volcano in Western Canada. Tunneling conditions were very challenging, including a section through deposits associated with the most recent eruption from Mount Meager Volcanic Complex (-2360 years before the present). This tunnel section included welded breccia and unconsolidated deposits composed of loose pumice, organics (that represent an old forest floor), and till, before entering the underlying tonalite bedrock. The construction of this section of the tunnel required cover grouting, umbrella support, and excavation with a combination of road header, hydraulic hammer, and drilling-and-blasting method. This paper provides an overview of the project, a summary of the key design and construction schedule challenges, and a description of the successful excavation of the tunnel through deposits associated with the recent volcanic activity.
文摘With the rapid development of construction engineering and municipal engineering in recent years, water supply and drainage technology has gradually matured. Building water supply and drainage design contains the design of rainwater drainage, sewage drainage design, water supply design and fire water supply design. At present, the research on the life cycle assessment of urban drainage system is mainly focused on the sewage treatment plant, therefore in this paper we introduce the theoretical basis of life cycle assessment. In the era of information network, building information model(BIM) technology is widely applied to the design of building water supply and drainage, which and effectively improves the design effi ciency, and makes up for the traditional water supply and drainage design of a lot of problems. In this paper, we analyze the development trend of water supply and drainage engineering based on life cycle assessment and building information model.
基金funded by the National Natural Science Foundation of China (Grant No.41072228)
文摘The scale and characteristics of rock mass are important indexes of the rock mass structural plane classification. This paper firstly analyzes the spatial distribution characteristics, the structural plane types (original structural plane, tectonic structural plane and hypergenic structural plane) and the associated features of the Emeishan basalts and then studies the classification schemes of the built hydropower structure planes of different rock areas (the east district, the central district and the west district) in the Emeishan basalt distribution area, Southwest China. Based on the analysis and comparison of the scale and the engineering geological characteristics of the typical structure planes in the basalt hydroelectric Stations, the types of structural planes are used in the first order classification. The secondary order classification is made by considering the impact factors of rock mass quality, e.g., the state of the structural planes, infilling, joint opening, extending length, the grade of weathering and strength. The engineering geological classification for Emeishan basalt is proposed. Because there are no evidences of a large structure presenting in study area, the first-order (Ⅰ) controlling structural planes do not appear in the classification, there only appear Ⅱ, Ⅲ, Ⅳ and Ⅴ grade structural planes influencing the rock-mass quality. According to the different rock-block types in bedding fault zone, the second-grade (Ⅱ) structural planes consisted of bedding fault zone is further classified into Ⅱ1, Ⅱ2 and Ⅱ3. The third-grade (Ⅲ) structural planes constructed by intraformational faulted zones are not subdivided. According to the different characteristics of intrusion, alteration and weathering unloading structural planes, the Ⅳ grade structure plane is divided into Ⅳ1, Ⅳ2 and Ⅳ3. According to the development characteristics of joints and fractures, the V grade structure plane is divided into fracture Ⅴ1 and columnar joint Ⅴ2. In all, the structural planes are classified into four groups with nine subsets. The research proposes the engineering geological classification of the structural plane for the hydropower project in the Emishan basalts, and the result of the study has a potential application in similar regions.
文摘In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.
文摘The Merguellil catchment (central Tunisia) has undergone rapid hydrological changes over the last decades. The most visible signs are a marked decrease in surface runoff in the upstream catchment and a complete change in the recharge processes of the Kairouan aquifer downstream. Fluctuations in rainfall have had a real but limited hydrological impact. Much more important are the consequences of human activities such as soil and water conservation works, small and large dams, pumping for irrigation. Several independent approaches were implemented: hydrodynamics, thermal surveys, geochemistry including isotopes. They helped to identify the different terms of the regional water balance and to characterize their changes over time.