The monitoring data is undoubtedly important to the water quality monitor- ing department. The proficiency testing is an important way to improve the monitor- ing capacity and enhance the quality management of laborat...The monitoring data is undoubtedly important to the water quality monitor- ing department. The proficiency testing is an important way to improve the monitor- ing capacity and enhance the quality management of laboratories. It plays an impor- tant role in ensuring the accuracy, integrity and comparability of monitoring data. In this paper, the positive role of proficiency testing in the water quality monitoring was analyzed. In addition, how to improve the water quality monitoring capacity and the quality management level of laboratories through the proficiency testing was also discussed.展开更多
A systematic investigation is made on the problems which are related to the optimal control of the municipal water distribution network.A mathematical model of forecasting the water short term demand is proposed using...A systematic investigation is made on the problems which are related to the optimal control of the municipal water distribution network.A mathematical model of forecasting the water short term demand is proposed using the time series trigonometric function analysis method;the service discharge based macroscopic model of network performance is established using the network structuring method;a relatively satisfactory mathematical model for the optimal control of water distribution network is put forward in view of security and economy,and solved by the constrained mixed discrete variable complex arithmetic.The model is applied in many examples and the results are satisfactory.展开更多
A new method of short-term forecasting for water consumption in municipal supply water networks based on wavelet transformation is introduced. By wavelet decomposing commonly used in the signal field, water consumptio...A new method of short-term forecasting for water consumption in municipal supply water networks based on wavelet transformation is introduced. By wavelet decomposing commonly used in the signal field, water consumption per hour is decomposed into many series. Trend item, cycle item and random item are separated from the original time series in this way.Then by analyzing, building a model, forecasting every series and composing the results, the forecasting value of the original consumption is received. Simulation results show that this forecasting method is faster and more accurate, of which the error is less than 2%, indicating that the wavelet analytical method is practicable.展开更多
基金Supported by Special Scientific Research Fund of Public Welfare Profession of Ministry of Water Resources(201101007)~~
文摘The monitoring data is undoubtedly important to the water quality monitor- ing department. The proficiency testing is an important way to improve the monitor- ing capacity and enhance the quality management of laboratories. It plays an impor- tant role in ensuring the accuracy, integrity and comparability of monitoring data. In this paper, the positive role of proficiency testing in the water quality monitoring was analyzed. In addition, how to improve the water quality monitoring capacity and the quality management level of laboratories through the proficiency testing was also discussed.
基金Foundation for University Key Teacher by the Min-istry of Education
文摘A systematic investigation is made on the problems which are related to the optimal control of the municipal water distribution network.A mathematical model of forecasting the water short term demand is proposed using the time series trigonometric function analysis method;the service discharge based macroscopic model of network performance is established using the network structuring method;a relatively satisfactory mathematical model for the optimal control of water distribution network is put forward in view of security and economy,and solved by the constrained mixed discrete variable complex arithmetic.The model is applied in many examples and the results are satisfactory.
文摘A new method of short-term forecasting for water consumption in municipal supply water networks based on wavelet transformation is introduced. By wavelet decomposing commonly used in the signal field, water consumption per hour is decomposed into many series. Trend item, cycle item and random item are separated from the original time series in this way.Then by analyzing, building a model, forecasting every series and composing the results, the forecasting value of the original consumption is received. Simulation results show that this forecasting method is faster and more accurate, of which the error is less than 2%, indicating that the wavelet analytical method is practicable.