The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-sca...The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level.展开更多
文摘The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level.