The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-sca...The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level.展开更多
Based on characteristics of deep sea flexible mining system,a new pump-lockage ore transportation system was designed.According to Bernoulli equation and two-phase hydrodynamics theory,parameters of the new system wer...Based on characteristics of deep sea flexible mining system,a new pump-lockage ore transportation system was designed.According to Bernoulli equation and two-phase hydrodynamics theory,parameters of the new system were obtained and four ore transportation systems were analyzed.The results indicate that the pump head of 1 000 m mining system is 100-150 m and that of 5 000 m mining system is 660-750 m.In addition,based on similarity theory,a model of the new transportation system was made,which can simulate more than 5 000 m actual ore transportation system.So both theory and experiment prove that the new pump-lockage ore transportation system is an ideal design for deep sea flexible mining system.展开更多
文摘The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level.
基金Project(50574100)supported by the National Natural Science Foundation of China
文摘Based on characteristics of deep sea flexible mining system,a new pump-lockage ore transportation system was designed.According to Bernoulli equation and two-phase hydrodynamics theory,parameters of the new system were obtained and four ore transportation systems were analyzed.The results indicate that the pump head of 1 000 m mining system is 100-150 m and that of 5 000 m mining system is 660-750 m.In addition,based on similarity theory,a model of the new transportation system was made,which can simulate more than 5 000 m actual ore transportation system.So both theory and experiment prove that the new pump-lockage ore transportation system is an ideal design for deep sea flexible mining system.