A new technique for preparing semisolid slurry,namely,distributary-confluence runner(DCR),was combined with die-casting(DC)to conduct rheological die-casting(R-DC)of A356 alloy.The mechanism of DCR for semisolid slurr...A new technique for preparing semisolid slurry,namely,distributary-confluence runner(DCR),was combined with die-casting(DC)to conduct rheological die-casting(R-DC)of A356 alloy.The mechanism of DCR for semisolid slurry preparation was determined via numerical simulations and experiments.The microstructure and mechanical properties of A356 alloys prepared via DC and R-DC were studied.High-quality slurry containing numerous primary α-Al(α1-Al)with an average size of 49μm and a shape factor of 0.81 could be prepared via DCR.Simulation results indicated that the unique flow state and physical field changes during slurry preparation were conducive to accelerating the uniformity of melt temperature and composition fields,nucleation exfoliation,and spherical growth.Compared with the alloy prepared via DC,the tensile strength,yield strength,and elongation of A356 alloy prepared via R-DC increased by 19%,15%,and 107%,respectively.展开更多
In order to calculate the suspended sediment discharge of the flood debris flows into the main river,a small scale flume test was designed to simulate the process of confluence of Jiangjia Ravine and Xiangjiang River ...In order to calculate the suspended sediment discharge of the flood debris flows into the main river,a small scale flume test was designed to simulate the process of confluence of Jiangjia Ravine and Xiangjiang River in Yunnan province,China.By test observation and data analysis,suspended sediment discharge of Debris flow after its entry into the main river was found to have a close relation with the bulk density,the confluence angle of the Debris flow and the main river,the ratio between per unit width discharge of Debris flow and main river.Based on the measured and simulated results,and statistical analysis,an empirical formula was proposed for the suspended SDR(Sediment Delivery Ratio) of the main river after the confluence of Debris flow.Compared with the observed results of Debris flow in 2009,the error between the data calculated by the empirical formula and the monitored data is only about 10%.展开更多
基金the financial supports from the National Natural Science Foundation of China(Nos.52005034,52027805)the Beijing Postdoctoral Research Foundation(No.2021-ZZ-073)+2 种基金the China Postdoctoral Science Foundation Funded Project(2021M691860)the Fundamental Research Funds for the Central Universities(No.FRF-TP-18-043A1)the Zhuhai Industry-University-Research Cooperation Project(No.ZH22017001200176PWC).
文摘A new technique for preparing semisolid slurry,namely,distributary-confluence runner(DCR),was combined with die-casting(DC)to conduct rheological die-casting(R-DC)of A356 alloy.The mechanism of DCR for semisolid slurry preparation was determined via numerical simulations and experiments.The microstructure and mechanical properties of A356 alloys prepared via DC and R-DC were studied.High-quality slurry containing numerous primary α-Al(α1-Al)with an average size of 49μm and a shape factor of 0.81 could be prepared via DCR.Simulation results indicated that the unique flow state and physical field changes during slurry preparation were conducive to accelerating the uniformity of melt temperature and composition fields,nucleation exfoliation,and spherical growth.Compared with the alloy prepared via DC,the tensile strength,yield strength,and elongation of A356 alloy prepared via R-DC increased by 19%,15%,and 107%,respectively.
基金supported by the Key Research Program of the Chinese Academy ofSciences (Grant No.KZZD-EW-05-01)the National Natural Science Foundation of China(Grant No.40871024)
文摘In order to calculate the suspended sediment discharge of the flood debris flows into the main river,a small scale flume test was designed to simulate the process of confluence of Jiangjia Ravine and Xiangjiang River in Yunnan province,China.By test observation and data analysis,suspended sediment discharge of Debris flow after its entry into the main river was found to have a close relation with the bulk density,the confluence angle of the Debris flow and the main river,the ratio between per unit width discharge of Debris flow and main river.Based on the measured and simulated results,and statistical analysis,an empirical formula was proposed for the suspended SDR(Sediment Delivery Ratio) of the main river after the confluence of Debris flow.Compared with the observed results of Debris flow in 2009,the error between the data calculated by the empirical formula and the monitored data is only about 10%.